Solar PV, battery storage and two EV chargers at the Lisheen pilot plant

Outcome

Submissions closed on 30 October 2026. No award has been published yet. Open tenders like this one are listed below.

Place
Lisheen, County Tipperary, Ireland
Offer deadline
01:00 PM · UTC
Contract value
Not stated in the notice
Contract period
TED fields list both eight months and 15 April 2027–15 April 2031; those entries conflict.
Published
October 4, 2026
TED public notice API

Overview

Tipperary County Council seeks design and installation of a solar PV and battery energy-storage system plus two electric-vehicle charging points at the National Bioeconomy Pilot Plant in Lisheen. TED lists an estimated amount of 400,000 without currency and an eight-month duration, while the date fields separately run from 15 April 2027 to 15 April 2031. These duration and date entries do not align. The offer deadline is 30 October 2026 at 14:00 UTC+01:00; another listed timestamp is 29 October at 23:00 UTC.

Information based on the public notice

What the buyer needs

The works combine PV generation, battery storage and two EV charging points at the named pilot plant. The TED record identifies an open procurement.

Tender details

Buyer
Tipperary County Council
Country
Ireland
Procedure
open
Classification
Solar storage and EV charging installation · CPV 45315300 · CPV 31681500 · CPV 51110000 · CPV 09332000 · CPV 09331200
Notice reference
684913-2026
Published scope
The works combine PV generation, battery storage and two EV charging points at the named pilot plant.
Estimated amount
400,000.00 (currency not stated)

What to check in the tender documents

  • The TED amount field omits currency; contract-duration and start/end-date fields conflict, and no award is stated.
Get started with Ziva

Original notice

Read the original description

Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen

{ "deadline-receipt-tender-date-lot": [ "2026-10-30+01:00" ], "notice-type": "cn-standard", "publication-number": "684913-2026", "contract-duration-period-lot": [ { "unit": "MONTH", "value": "8" } ], "description-lot": { "eng": [ "Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen" ] }, "procedure-type": "open", "deadline-receipt-tender-time-lot": [ "14:00:00+01:00" ], "buyer-name": { "eng": [ "Tipperary County Council" ] }, "estimated-value-proc": "400000", "notice-title": { "hun": "Írország – Villamos hálózati szerelés – Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen", "lav": "Īrija – Elektroapgādes iekārtas – Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen", "swe": "Irland – Anläggningar för elförsörjning – Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen", "gle": "Éire – Electricity supply installations – Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen", "ell": "Ιρλανδία – Εγκαταστάσεις ηλεκτρικής παροχής – Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen", "spa": "Irlanda – Instalaciones de suministro de electricidad – Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen", "est": "Iirimaa – Elektrivarustuspaigaldised – Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen", "nld": "Ierland – Elektriciteitsvoorzieningsinstallaties – Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen", "fin": "Irlanti – Sähkönjakelulaitteiden asennustyöt – Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen", "pol": "Irlandia – Instalacje zasilania elektrycznego – Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen", "hrv": "Irska – Instalacije za opskrbu električnom energijom – Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen", "ces": "Irsko – Instalace a montáž přívodu proudu – Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen", "dan": "Irland – Strømforsyningsinstallationer – Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen", "ron": "Irlanda – Instalaţii de distribuţie de energie electrică – Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen", "por": "Irlanda – Instalações de abastecimento de electricidade – Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen", "slk": "Írsko – Inštalovanie zásobovania elektrickou energiou – Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen", "fra": "Irlande – Installations d'alimentation électrique – Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen", "mlt": "L-Irlanda – Stallazzjonijiet tal-forniment ta’ l-elettriku – Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen", "deu": "Irland – Stromversorgungsanlagen – Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen", "lit": "Airija – Elektros energijos tiekimo įranga – Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen", "ita": "Irlanda – Impianti di alimentazione di corrente – Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen", "bul": "Иpлaндия – Строителни и монтажни работи на електрическо захранване – Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen", "slv": "Irska – Naprave za oskrbo z elektriko – Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen", "eng": "Ireland – Electricity supply installations – Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen" }, "form-type": "competition", "description-proc": { "eng": "Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen" } }

Official source: TED public notice API ↗