TII499 Luas Finglas main infrastructure design and construction

Place
Ireland, NUTS IE061.
Tender submission deadline
11:00 AM · UTC
Contract value
€250,000,000
Estimated value stated in the official CfT.
Contract period
54 months.
Published
October 5, 2026
Ireland eTenders public CfT detail

Overview

Transport Infrastructure Ireland is procuring design and construction for the 4 km Luas Finglas extension from the Green Line toward Finglas and Dublin city centre. The scope includes four stops, track, a 350-space Park and Ride, bridges, utilities, road and pedestrian works, overhead power and rail systems, plus integration, coordination, testing and commissioning. The official CfT lists an estimated value of EUR 250 million, a restricted procedure using MEAT, a 54-month duration and no lots. Tenders are due 14 December 2026 at 11:00.

Information based on the public notice

What the buyer needs

Large multidisciplinary light-rail infrastructure design and construction under NEC4 ECC Option C (target cost with activity schedule), including systems integration and commissioning.

Tender details

Buyer
Transport Infrastructure Ireland (TII)
Country
Ireland
Procedure
Restricted
Classification
Construction and civil works
Notice reference
9195113
Scope
Luas Finglas, a 4 km extension with four new stops, Park and Ride, bridges, track, utilities, roads, active-traffic works, rail systems and associated infrastructure.
Estimated value
EUR 250,000,000
Procedure and evaluation
Restricted procedure; most economically advantageous tender (MEAT).
Deadline
14 December 2026 at 11:00 as displayed on the official CfT; deadline is 11:00 UTC.
Contract duration
54 months; contract is not divided into lots.
Location
NUTS IE061; Ireland.

What to check in the tender documents

  • The official summary does not set out selection thresholds or the detailed evaluation weighting.
Get started with Ziva

Original notice

Read the original description

TII499 Luas Finglas Main Infrastructure Design and Construction Works

Luas Finglas is a 4 km extension of the Luas Green Line, delivering a high-capacity light rail connection between Finglas and Dublin city centre to support sustainable transport and urban development. The scheme will serve communities including Charlestown, Finglas Village, Finglas West, St Helena’s, and the Tolka Valley, and will comprise four new stops at St Helena’s, Finglas Village, St Margaret’s Road, and Charlestown. It also includes a 350-space Park and Ride facility near St Margaret’s Road, as well as interchange opportunities with bus services and with mainline rail services at Broombridge. The Luas Finglas Main Infrastructure Design and Construction Works will be delivered under the NEC4 Engineering and Construction Contract (ECC) Option C (Target Cost with Activity Schedule). The scope of this Contract (TII-499) includes, but is not limited to, the design and construction of the following principal elements: 1. Site clearance and demolitions. 2. Track (trackbed and rails). 3. Luas Stops at St Helena’s, Finglas Village, St Margaret’s Road and Charlestown. 4. Broombridge stabling site works. 5. Park and Ride facilities at St Margaret's Road. 6. Royal canal and rail overbridge at Broombridge. 7. Tolka Valley Park Bridge. 8. Fencing, retaining walls, boundary treatments and accommodation work. 9. Utility services realignment, diversion, replacement, and protection. 10. Road realignments and junction modifications. 11. Pedestrian and cycling facilities including cycle storage structures. 12. Road traffic signalling. 13. Landscape and urban realm upgrades. 14. Overhead Catenary System (OCS). 15. Power and Systems infrastructure. 16. Signalling, controls and other rail systems. 17. Working in live traffic environment on the busiest radial corridors in the greater Dublin area including property and business frontage reconfiguration. 18. Heritage / archaeology mitigation works. 19. Installation of stop furniture. 20. Installation of Validators and Ticket Vending Machines. 21. Other Ancillary works. The successful Contractor will also be responsible for: • Overall systems integration. • Interfacing and co-ordinating with other works packages to facilitate completion of works. • Interfacing and co-ordinating with stakeholders. • Testing and commissioning.

Official source: Ireland eTenders public CfT detail ↗

Notice updates

October 18, 2026 · Version 2

Classification updated

TII499 Luas Finglas Main Infrastructure Design and Construction Works

Luas Finglas is a 4 km extension of the Luas Green Line, delivering a high-capacity light rail connection between Finglas and Dublin city centre to support sustainable transport and urban development. The scheme will serve communities including Charlestown, Finglas Village, Finglas West, St Helena’s, and the Tolka Valley, and will comprise four new stops at St Helena’s, Finglas Village, St Margaret’s Road, and Charlestown. It also includes a 350-space Park and Ride facility near St Margaret’s Road, as well as interchange opportunities with bus services and with mainline rail services at Broombridge. The Luas Finglas Main Infrastructure Design and Construction Works will be delivered under the NEC4 Engineering and Construction Contract (ECC) Option C (Target Cost with Activity Schedule). The scope of this Contract (TII-499) includes, but is not limited to, the design and construction of the following principal elements: 1. Site clearance and demolitions. 2. Track (trackbed and rails). 3. Luas Stops at St Helena’s, Finglas Village, St Margaret’s Road and Charlestown. 4. Broombridge stabling site works. 5. Park and Ride facilities at St Margaret's Road. 6. Royal canal and rail overbridge at Broombridge. 7. Tolka Valley Park Bridge. 8. Fencing, retaining walls, boundary treatments and accommodation work. 9. Utility services realignment, diversion, replacement, and protection. 10. Road realignments and junction modifications. 11. Pedestrian and cycling facilities including cycle storage structures. 12. Road traffic signalling. 13. Landscape and urban realm upgrades. 14. Overhead Catenary System (OCS). 15. Power and Systems infrastructure. 16. Signalling, controls and other rail systems. 17. Working in live traffic environment on the busiest radial corridors in the greater Dublin area including property and business frontage reconfiguration. 18. Heritage / archaeology mitigation works. 19. Installation of stop furniture. 20. Installation of Validators and Ticket Vending Machines. 21. Other Ancillary works. The successful Contractor will also be responsible for: • Overall systems integration. • Interfacing and co-ordinating with other works packages to facilitate completion of works. • Interfacing and co-ordinating with stakeholders. • Testing and commissioning.

October 12, 2026 · Version 1

Published

TII499 Luas Finglas Main Infrastructure Design and Construction Works

Luas Finglas is a 4 km extension of the Luas Green Line, delivering a high-capacity light rail connection between Finglas and Dublin city centre to support sustainable transport and urban development. The scheme will serve communities including Charlestown, Finglas Village, Finglas West, St Helena’s, and the Tolka Valley, and will comprise four new stops at St Helena’s, Finglas Village, St Margaret’s Road, and Charlestown. It also includes a 350-space Park and Ride facility near St Margaret’s Road, as well as interchange opportunities with bus services and with mainline rail services at Broombridge. The Luas Finglas Main Infrastructure Design and Construction Works will be delivered under the NEC4 Engineering and Construction Contract (ECC) Option C (Target Cost with Activity Schedule). The scope of this Contract (TII-499) includes, but is not limited to, the design and construction of the following principal elements: 1. Site clearance and demolitions. 2. Track (trackbed and rails). 3. Luas Stops at St Helena’s, Finglas Village, St Margaret’s Road and Charlestown. 4. Broombridge stabling site works. 5. Park and Ride facilities at St Margaret's Road. 6. Royal canal and rail overbridge at Broombridge. 7. Tolka Valley Park Bridge. 8. Fencing, retaining walls, boundary treatments and accommodation work. 9. Utility services realignment, diversion, replacement, and protection. 10. Road realignments and junction modifications. 11. Pedestrian and cycling facilities including cycle storage structures. 12. Road traffic signalling. 13. Landscape and urban realm upgrades. 14. Overhead Catenary System (OCS). 15. Power and Systems infrastructure. 16. Signalling, controls and other rail systems. 17. Working in live traffic environment on the busiest radial corridors in the greater Dublin area including property and business frontage reconfiguration. 18. Heritage / archaeology mitigation works. 19. Installation of stop furniture. 20. Installation of Validators and Ticket Vending Machines. 21. Other Ancillary works. The successful Contractor will also be responsible for: • Overall systems integration. • Interfacing and co-ordinating with other works packages to facilitate completion of works. • Interfacing and co-ordinating with stakeholders. • Testing and commissioning.