Building technology: every duty in the BoQ found. Your system, properly evidenced.

Ziva recomputes the output, finds every named product and sets up the equivalence table.

Prices and plans

Prefer we run the bid? See Zelius

Ziva Project for the City of Geneva photovoltaic tender: the equivalence table per product-bound item, next to Ziva’s summary.
SIMAP 47019, Ville de Genève, Département de l’aménagement, des constructions et de la mobilité. Public tender, worked by a fictional sample company. Nothing was submitted. Shown in French, the tender’s language.

The tender on this page

SIMAP 47019 Official notice ↗
Tender
Ecole du Mervelet (2380TI) photovoltaïque
Buyer
Ville de Genève, Département de l’aménagement, des constructions et de la mobilité
Procedure
Procédure ouverte
Offers due
16 December 2026, 11:00
Language
French

From the bill of quantities to the offer, every duty in its place

Does the output match the inverters?

The output appears nowhere as a number. Ziva computes it per zone and checks it against the inverters.

In the screenshot

  1. Output per panel type
  2. Zone A: 13.78 kWp on a 15 kW inverter
  3. DC to AC ratio per zone
The “Puissance” sheet in Ziva: installed output per zone computed from the quantities, with the inverters and the DC to AC ratio.

A named product, and the equivalence proof is on you

Ziva lists every product-bound item with its properties. You enter your model; the table computes the gap.

In the screenshot

  1. The named product
  2. The property to match
  3. Your model and the gap
The “Équivalences” sheet in Ziva: product-bound items with the named product, the required property and fields for your model.

Who supplies, who connects, who certifies?

It sits in item texts, not lists. Ziva compiles who does what, each with its page.

In the screenshot

  1. The electrician connects to the main board
  2. Kit “similar to” a named product
  3. Module values as the benchmark
The École du Mervelet bill of quantities in the original in Ziva, page 3: the roof system with product rules and the electrician’s scope.

One Geneva photovoltaic tender, from output to proof

SIMAP 47019. Sample company: Arve Énergie Technique SA (fictional).

From the notice and BoQ; output computed by Ziva.

installed output in two zones
103 kWp
weight of the price
40 %
of works
3 months

What you have in hand

  • pdf

    Duties and responsibilities

    In one view, with sources

  • docx

    Equivalence evidence

    With values from your data sheets

  • xlsx

    Calculation

    Formulas in place, prices from you

  • docx

    The buyer’s forms

    Filled in, ready to sign

  • docx

    Questions to the buyer

    In the language of the tender

43 energy and utilities tenders are open in Switzerland today

Ziva Intelligence also checks partial scopes and subcontracts against your profile of trades, CPV codes and exclusions.

  • Germany 140, 1.7% of all open notices there
  • France 51, 2% of all open notices there
  • Switzerland 43, 2% of all open notices there
  • United States 41, 4.1% of all open notices there
  • Spain 27, 2.7% of all open notices there
  • Netherlands 19, 1.6% of all open notices there
  • Other countries 147

Source: Zephior tender directory, open notices on 13 November 2026. Sector assigned by our own classification of CPV codes and titles; not every notice is classified. How we count

Your documents, your controls. Audited, and documented in the open.

Zelius, our managed bid service

Prefer we run the bid?

Our team takes on the evidence, the forms and the questions to the buyer. The engineering and the prices stay with you.

On the call: a finished example submission for an LED replacement, every line item priced.

Frequently asked questions

Yes. Ziva flags items naming a brand, a system or “or equivalent”, with their place.

No. Design, sizing and prices stay with your engineers.

Yes, and the BoQ as a PDF too.

Questions about prices? Prices and plans Talk to us

Your next building services tender, with every duty in its place.