Construction of the Val Sum Punt tunnel

Gemeinde Ilanz/GlionSwitzerlandOpen
22 January 2027 at 23:59 CET
10:59 PM · UTC
Contract value
Not stated in the notice
Contract period
5 April 2027 to 30 September 2028
Published
November 15, 2026

SIMAP

Overview

The Ilanz/Glion electric utility is procuring construction of the Val Sum Punt tunnel at Varduz. The published quantities include about 12,000 cubic metres of solid rock excavation, anchors, shotcrete, concrete and reinforcement, drainage and cable ducts, a concrete carriageway, and handling of excavated material at designated type A and B deposits. Execution is planned from 5 April 2027 to 30 September 2028. Questions are due 11 December 2026. Execution is planned for 5 April 2027 to 30 September 2028. Offers are due 22 January 2027 at 23:59 CET.

Information based on the public notice

What the buyer needs

The Ilanz/Glion electric utility is procuring construction of the Val Sum Punt tunnel at Varduz. The published quantities include about 12,000 cubic metres of solid rock excavation, anchors, shotcrete, concrete and reinforcement, drainage and cable ducts, a concrete carriageway, and handling of excavated material at designated type A and B deposits. Execution is planned from 5 April 2027 to 30 September 2028.

  • Consortia and subcontractors are permitted. Variants are permitted; partial offers are not.

Tender details

Buyer
Gemeinde Ilanz/Glion
Country
Switzerland
Procedure
open
Classification
Tunnel construction · CPV 45000000
Notice reference
47116 · 47116-01
Scope
The Ilanz/Glion electric utility is procuring construction of the Val Sum Punt tunnel at Varduz. The published quantities include about 12,000 cubic metres of solid rock excavation, anchors, shotcrete, concrete and reinforcement, drainage and cable ducts, a concrete carriageway, and handling of excavated material at designated type A and B deposits. Execution is planned from 5 April 2027 to 30 September 2028.
Deadline
22 January 2027 at 23:59 CET
Questions deadline
11 December 2026
Execution period
5 April 2027 to 30 September 2028

What to check in the tender documents

  • No estimated contract value is stated in the public notice.
Get started with Ziva

Original notice

Read the original description

EP Ilanz/Glion, WE Varduz, Neubau Tunnel Val Sum Punt

EP Ilanz/Glion, WE Varduz, Neubau Tunnel Val Sum Punt Hauptmengen:Aushub Voreinschnitte: 1'000 m3 festFelsausbruch SPV: 12'000 m3 festAnker, GFK und Stahl: 1'300 St.Grundmischung für Nassspritzbeton mit Stahlfasern: 1'850 m3Spiesse: 560 mStahlbeton: 600 m3Bewehrung: 60 tRandabschluss Fahrbahn: 600 mKiesgemisch: 800 m3Entwässerungsleitungen und Kabelschutzrohre: 2'600 mFahrbahn in Beton: 1'200 m2Ablagerung und Einbau auf projektspezifische Deponie Typ A: 15'000 m3 fest (Transportdistanz zu Deponie Typ A: 1'700 m)Abtransport Tunnelausbruchmaterial in bewilligte Deponietyp B: 4'000 m3 lose

Official source: SIMAP ↗