Fish-passable block ramp at the Tinizong hydropower plant
- Place
- CH-7453 Tinizong, canton of Graubünden
- 18 December 2026 at 12:00 CET
- 11:00 AM · UTC
- Contract value
- Not stated in the notice
- Classification
- Water, waste and environment
- Published
- November 12, 2026
- SIMAP
Overview
At the Tinizong hydropower plant, the project removes two existing bed sills in the Julia and Gelgia rivers and builds a fish-passable block ramp with crossbars and pools. The works include civil engineering, utility trenching, concrete, water control and diversion, temporary works, riverbed adjustment and bank transitions. Construction must comply with the Graubünden project approval conditions. Consortium bids are not permitted. Subcontractors are permitted. Variants and partial offers are not permitted. The correspondence and offer documents must be in German. Offers remain valid for 270 days. Offers are due 18 December 2026 at 12:00 CET.
Information based on the public notice
Ask about this tender
What the buyer needs
At the Tinizong hydropower plant, the project removes two existing bed sills in the Julia and Gelgia rivers and builds a fish-passable block ramp with crossbars and pools. The works include civil engineering, utility trenching, concrete, water control and diversion, temporary works, riverbed adjustment and bank transitions. Construction must comply with the Graubünden project approval conditions.
- Consortium bids are not permitted. Subcontractors are permitted. Variants and partial offers are not permitted. The correspondence and offer documents must be in German.
Tender details
- Buyer
- Elektrizitätswerk der Stadt Zürich (ewz)
- Country
Switzerland
- Procedure
- open
- Classification
- Water, waste and environment · CPV 45000000
- Notice reference
- 47530 · 47530-01
- Scope
- At the Tinizong hydropower plant, the project removes two existing bed sills in the Julia and Gelgia rivers and builds a fish-passable block ramp with crossbars and pools. The works include civil engineering, utility trenching, concrete, water control and diversion, temporary works, riverbed adjustment and bank transitions. Construction must comply with the Graubünden project approval conditions.
- Deadline
- 18 December 2026 at 12:00 CET
- Questions deadline
- 2026-12-04
- Offer validity
- Offers remain valid for 270 days.
What to check in the tender documents
- Detailed award and qualification criteria are in the tender documents; they were not reviewed.
- No estimated contract value is stated in the public detail.
Original notice
Read the original description
Neubau Blockrampe als Ersatz der Sohlschwellen KW Tinizong
Official source: SIMAP ↗
https://www.simap.ch/de/project-detail/d5a7c2d9-1613-495e-8ccf-0ba8010c232b
Source retrieved: 2026-11-16T23:20:32.198113Z