Fish-passable block ramp at the Tinizong hydropower plant

Place
CH-7453 Tinizong, canton of Graubünden
18 December 2026 at 12:00 CET
11:00 AM · UTC
Contract value
Not stated in the notice
Classification
Water, waste and environment
Published
November 12, 2026
SIMAP

Overview

At the Tinizong hydropower plant, the project removes two existing bed sills in the Julia and Gelgia rivers and builds a fish-passable block ramp with crossbars and pools. The works include civil engineering, utility trenching, concrete, water control and diversion, temporary works, riverbed adjustment and bank transitions. Construction must comply with the Graubünden project approval conditions. Consortium bids are not permitted. Subcontractors are permitted. Variants and partial offers are not permitted. The correspondence and offer documents must be in German. Offers remain valid for 270 days. Offers are due 18 December 2026 at 12:00 CET.

Information based on the public notice

What the buyer needs

At the Tinizong hydropower plant, the project removes two existing bed sills in the Julia and Gelgia rivers and builds a fish-passable block ramp with crossbars and pools. The works include civil engineering, utility trenching, concrete, water control and diversion, temporary works, riverbed adjustment and bank transitions. Construction must comply with the Graubünden project approval conditions.

  • Consortium bids are not permitted. Subcontractors are permitted. Variants and partial offers are not permitted. The correspondence and offer documents must be in German.

Tender details

Buyer
Elektrizitätswerk der Stadt Zürich (ewz)
Country
Switzerland
Procedure
open
Classification
Water, waste and environment · CPV 45000000
Notice reference
47530 · 47530-01
Scope
At the Tinizong hydropower plant, the project removes two existing bed sills in the Julia and Gelgia rivers and builds a fish-passable block ramp with crossbars and pools. The works include civil engineering, utility trenching, concrete, water control and diversion, temporary works, riverbed adjustment and bank transitions. Construction must comply with the Graubünden project approval conditions.
Deadline
18 December 2026 at 12:00 CET
Questions deadline
2026-12-04
Offer validity
Offers remain valid for 270 days.

What to check in the tender documents

  • Detailed award and qualification criteria are in the tender documents; they were not reviewed.
  • No estimated contract value is stated in the public detail.
Get started with Ziva

Original notice

Read the original description

Neubau Blockrampe als Ersatz der Sohlschwellen KW Tinizong

Neubau Blockrampe als Ersatz der Sohlschwellen KW Tinizong Rückbau von zwei bestehenden Sohlschwellen in der Julia/Gelgia beim Kraftwerk Tinizong und Erstellung einer neuen fischgängigen Blockrampe mit Riegelsteinen und Beckenstruktur. Der Auftrag umfasst sämtliche Baumeisterarbeiten, Werkleitungstiefbauarbeiten, Betonarbeiten, Wasserhaltungs- und Umleitungsmassnahmen, Bauhilfsmassnahmen sowie die Anpassung der Gewässersohle und Uferanschlüsse. Die Arbeiten erfolgen im Gewässerraum unter Einhaltung der Auflagen aus der Projektgenehmigung des Kantons Graubünden.

Official source: SIMAP ↗