Shotcrete works at Manchester Airport station
Outcome
Submissions closed on 16 October 2026. No award has been published yet. Open tenders like this one are listed below.
- Place
- Manchester Airport, North West England, United Kingdom
- 16 October 2026 at 16:00 UTC
- 04:00 PM · UTC
- Contract value
- Not stated in the notice
- Classification
- Construction and civil works
- Published
- October 6, 2026
- UK Contracts Finder notice snapshot
Overview
Kier Transportation seeks shotcrete works for the Manchester Airport station capacity scheme. The package includes preparing and cleaning piled retaining walls, installing reinforcement and anchors, applying and finishing sprayed concrete, forming joints, protecting nearby assets, testing and handover, and removing construction waste in a live rail and airport setting.
Information based on the public notice
Ask about this tender
What the buyer needs
The work package supports additional platform capacity for longer trains at Manchester Airport station. The supplied notice description identifies the shotcrete and related wall-treatment scope; no estimated value is stated.
Tender details
- Buyer
- Kier Transportation - CP7 NWC
- Country
United Kingdom
- Procedure
- Not stated in the notice
- Classification
- Construction and civil works · CPV 44114100 · CPV 45262310 · CPV 44114210 · CPV 45234000
- Notice reference
- ocds-b5fd17-10c912f0-d009-4cfd-8bfe-f45df7bd858d
- Work package
- Shotcrete and retaining-wall works
- Project
- Manchester Airport station capacity scheme
- Deadline
- 16 October 2026 at 16:00 UTC
What to check in the tender documents
- The notice does not state an estimated contract value.
Original notice
Read the original description
Manchester International Airport - Shotcrete works
Official source: UK Contracts Finder notice snapshot ↗
Notice updates
October 17, 2026 · Version 2
Classification updated · Contract period updated · Deadline information updated · Summary and analysis updated · Tender facts updated · Original notice updated · Deadline updated · Location updated · Source updated · Source notice details updated · Source references updated · Status changed · Notice update added
Manchester International Airport - Shotcrete works
The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable.Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: -Preparation and cleaning of exposed contiguous piled retaining wall faces. -Supply and installation of mesh reinforcement, anchor bars and injection mortar. -Supply, delivery, application, curing and finishing of sprayed concrete (shotcrete). -Formation and sealing of expansion and construction joints. -Protection of adjacent assets from rebound, overspray and damage. -Testing, inspection, quality assurance and handover documentation. -Removal and disposal of rebound material, washout and associated waste. -Working within a live rail and airport environment in accordance with all project and Network Rail requirements.
October 13, 2026 · Version 1
Published
Manchester International Airport - Shotcrete works
Manchester International Airport - Shotcrete works Kier Transportation - CP7 NWC Published date: 6 October 2026 Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract. Closing: 16 October 2026, 5pm Contract summary Industry Ready-mixed concrete - 44114100 Concrete piles - 44114210 Construction work for railways and cable transport systems - 45234000 Reinforced-concrete work - 45262310 Location of contract North West, Any region Value of contract £250,000 to £500,000 Procurement reference C4N120562379 Contract start date 10 February 2027 Contract end date 27 July 2027 Contract type Works Contract is suitable for SMEs? Yes Contract is suitable for VCSEs? No Description The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable.Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: -Preparation and cleaning of exposed contiguous piled retaining wall faces. -Supply and installation of mesh reinforcement, anchor bars and injection mortar. -Supply, delivery, application, curing and finishing of sprayed concrete (shotcrete). -Formation and sealing of expansion and construction joints. -Protection of adjacent assets from rebound, overspray and damage. -Testing, inspection, quality assurance and handover documentation. -Removal and disposal of rebound material, washout and associated waste. -Working within a live rail and airport environment in accordance with all project and Network Rail requirements. How to apply Follow the instructions given in the description or the more information section. About the buyer Contact name Mark Thompson Address 2nd Floor Optimum House Clippers Quay M503XP UK Telephone 07880787625 Email mark.thompson@kier.co.uk
https://www.contractsfinder.service.gov.uk/Notice/64a43aa2-d0e2-4988-9792-bdb6052db610
Source retrieved: 2026-10-17T01:22:34.804177Z