N2 Monte Viaduct: reinforcement of south abutment and pier P2

3 December 2026, 16:00 CET (UTC+01:00)
03:00 PM · UTC
Contract value
Not stated in the notice
Contract period
2027-03-01–2027-11-26
Published
October 13, 2026

SIMAP

Overview

ASTRA seeks reinforcement of the south abutment and pier P2 foundations on the Monte Viaduct along the N2 between km 93.645 and 94.032. Work includes permanent active anchors and approximately 120 m³ of cast-in-place reinforced concrete, 1,200 linear metres of anchors and drilling, 90 m³ of earthworks and 150 m³ of stone-wall demolition. Offers are due 3 December 2026 at 16:00 CET; questions must be submitted in Italian by 28 October. Published criteria weight price 60%, offer quality/plausibility 30% and key-person experience 10%.

Information based on the public notice

What the buyer needs

Reinforce the south abutment and P2 pier foundations of the Monte Viaduct on N2 km 93.645–94.032 with permanent active anchors and associated concrete, drilling, earthworks and demolition.

  • One comparable reference is required for qualification. Questions must be submitted in Italian. Award weighting: price 60%, offer quality/plausibility 30%, key-person experience 10%.

Tender details

Buyer
Ufficio federale delle strade USTRA, divisione infrastruttura stradale Est
Country
Switzerland
Procedure
open
Classification
Construction and civil works · CPV 45200000
Notice reference
45475 · 45475-01
Deadline
3 December 2026, 16:00 CET (UTC+01:00)
Scope
Reinforce the south abutment and P2 pier foundations of the Monte Viaduct on N2 km 93.645–94.032 with permanent active anchors and associated concrete, drilling, earthworks and demolition.
Submission requirements
One comparable reference is required for qualification. Questions must be submitted in Italian. Award weighting: price 60%, offer quality/plausibility 30%, key-person experience 10%.

What to check in the tender documents

  • No award is reported in the current public notice.
Get started with Ziva

Original notice

Read the original description

MP-260009 N2 Rinforzo fondazioni Viadotto di Monte – Interventi Spalla Sud e Pila P2

Titre: MP-260009 N2 Rinforzo fondazioni Viadotto di Monte – Interventi Spalla Sud e Pila P2. Le présent marché porte sur le renforcement des fondations de la culée sud et de la pile P2 du viaduc de Monte, chaussée SN, situé sur le tracé de l’autoroute N2 entre les km 93.645 et 94.032. Il prévoit de nouveaux ancrages actifs permanents pour renforcer les ancrages existants. Quantités principales prévues : béton armé coulé sur place env. 120 m³; ancrages actifs env. 1’200 m linéaires; forages DN 133–168 env. 1’200 m linéaires; terrassements env. 90 m³; démolition de murs en pierre env. 150 m³. Délai 3 décembre 2026 à 16 h 00 (UTC+01:00).

Official source: SIMAP ↗

Notice updates

October 17, 2026 · Version 2

Classification updated

MP-260009 N2 Rinforzo fondazioni Viadotto di Monte – Interventi Spalla Sud e Pila P2

Titre: MP-260009 N2 Rinforzo fondazioni Viadotto di Monte – Interventi Spalla Sud e Pila P2. Le présent marché porte sur le renforcement des fondations de la culée sud et de la pile P2 du viaduc de Monte, chaussée SN, situé sur le tracé de l’autoroute N2 entre les km 93.645 et 94.032. Il prévoit de nouveaux ancrages actifs permanents pour renforcer les ancrages existants. Quantités principales prévues : béton armé coulé sur place env. 120 m³; ancrages actifs env. 1’200 m linéaires; forages DN 133–168 env. 1’200 m linéaires; terrassements env. 90 m³; démolition de murs en pierre env. 150 m³. Délai 3 décembre 2026 à 16 h 00 (UTC+01:00).

October 14, 2026 · Version 1

Published

MP-260009 N2 Rinforzo fondazioni Viadotto di Monte – Interventi Spalla Sud e Pila P2

Titre: MP-260009 N2 Rinforzo fondazioni Viadotto di Monte – Interventi Spalla Sud e Pila P2. Le présent marché porte sur le renforcement des fondations de la culée sud et de la pile P2 du viaduc de Monte, chaussée SN, situé sur le tracé de l’autoroute N2 entre les km 93.645 et 94.032. Il prévoit de nouveaux ancrages actifs permanents pour renforcer les ancrages existants. Quantités principales prévues : béton armé coulé sur place env. 120 m³; ancrages actifs env. 1’200 m linéaires; forages DN 133–168 env. 1’200 m linéaires; terrassements env. 90 m³; démolition de murs en pierre env. 150 m³. Délai 3 décembre 2026 à 16 h 00 (UTC+01:00).