Plumbing and building services for Brione Verzasca alpine campsite

Place
Brione Verzasca, canton of Ticino
18 December 2026 at 13:30 CET
12:30 PM · UTC
Contract value
Not stated in the notice
Contract period
15 February 2027 to 15 March 2028
Published
November 16, 2026
SIMAP

Overview

The Municipality of Brione Verzasca is procuring sanitary, heating and ventilation installations for the new alpine campsite under the Verzasca 2030 masterplan. The project includes two visitor and service buildings, 46 powered and water-connected camper pitches, 13 temporary bungalow cabins and supporting infrastructure. The listed work includes heating, water and wastewater piping, sanitary systems and related installations. Execution is planned from 15 February 2027 to 15 March 2028. Questions are due 4 December 2026. Offers are due 18 December 2026 at 13:30 CET.

Information based on the public notice

What the buyer needs

The Municipality of Brione Verzasca is procuring sanitary, heating and ventilation installations for the new alpine campsite under the Verzasca 2030 masterplan. The project includes two visitor and service buildings, 46 powered and water-connected camper pitches, 13 temporary bungalow cabins and supporting infrastructure. The listed work includes heating, water and wastewater piping, sanitary systems and related installations. Execution is planned from 15 February 2027 to 15 March 2028.

  • Consortium bids are not permitted; subcontractors are permitted only for ventilation, heating insulation and sanitary insulation.

Tender details

Buyer
Patriziato di Brione Verzasca
Country
Switzerland
Procedure
open
Classification
Plumbing and building services · CPV 45000000
Notice reference
47604 · 47604-01
Scope
The Municipality of Brione Verzasca is procuring sanitary, heating and ventilation installations for the new alpine campsite under the Verzasca 2030 masterplan. The project includes two visitor and service buildings, 46 powered and water-connected camper pitches, 13 temporary bungalow cabins and supporting infrastructure. The listed work includes heating, water and wastewater piping, sanitary systems and related installations. Execution is planned from 15 February 2027 to 15 March 2028.
Deadline
18 December 2026 at 13:30 CET
Questions deadline
4 December 2026
Contract or execution period
15 February 2027 to 15 March 2028

What to check in the tender documents

  • No estimated contract value is stated in the public notice.
Get started with Ziva

Original notice

Read the original description

Costruzione nuovo campeggio alpino a Brione Verzasca - Opere da installatore di impianti RVCS

Costruzione nuovo campeggio alpino a Brione Verzasca - Opere da installatore di impianti RVCS La realizzazione del "Nuovo campeggio alpino di Brione Verzasca" rappresenta un progetto faro nell'ambito del Masterplan Verzasca 2030, piano di sviluppo per la valorizzazione della Valle Verzasca. Il progetto si caratterizza per: la costruzione di due edifici di accoglienza con le principali funzioni ricettive e di servizio alla clientela (ricevimento, shop, bar, cucina, portico, servizi igienici, locali doccia, magazzini, ecc.); la realizzazione di nr.46 piazzole camper dotate di acqua e corrente elettrica; la realizzazione di un'area bungalow con nr. 13 casette temporanee; sottostrutture a servizio. Quantitativi principali: Lunghezza tubazioni riscaldamento fuori muro m 150 Lunghezza tubazioni acqua fuori muro m 250 Lunghezza tubazioni di scarico acque luride m 175 Lunghezza tubazioni riscaldamento a distanza m 85 Superficie di pavimento riscaldata m2 250 Potenza nominale pompa di calore A7/W35 kW 13.14 Nr. indicativo apparecchi sanitari da posare e/o allacciare pz. 40 Portata d’aria 2x ventilatori espulsione blocco sanitari m3/h 300 Subcontractor conditions: Il subappalto è ammesso unicamente per le seguenti opere: CCC244 Impianti di ventilazione CCC242.6 Isolamento impianti di riscaldamento CCC255 Isolamento impianto sanitario Offer deadline: 2026-12-18T13:30:00+01:00 Questions deadline: 2026-12-04 contractPeriod: 2027-02-15 to 2028-03-15 executionPeriod: 2027-02-15 to 2028-03-15

Official source: SIMAP ↗