Munot vessel engine and propulsion replacement

Outcome

Submissions closed on 30 October 2026. No award has been published yet. Open tenders like this one are listed below.

The current SIMAP notice sets the offer deadline at 30 October 2026 at 16:00 CET. The scope covers replacement of the engines and both propulsion systems of the MS Munot, which have remained unchanged since the ship was built in 1998. Related work includes replacing the main switchboard and cables, revising the helm stations and adapting ship systems to current Swiss shipbuilding rules. Offers are valid for 180 days; variants, partial offers and consortia are not allowed. Detailed award criteria are not in the public fields.

Place
Langwiesen, canton of Schaffhausen
Offer deadline: 30 October 2026, 16:00 CET
03:00 PM · UTC
Contract value
Not stated in the notice
Classification
Marine engineering
Published
September 16, 2026
SIMAP

Overview

The MS Munot’s two propulsion systems, unchanged since the vessel was built in 1998, are to be replaced. New engines must meet current exhaust-emission standards and certifications. Associated work includes a new main switchboard and cabling, refurbishment of control stations and adjustments to ship systems under current Swiss shipbuilding rules. The offer deadline is 30 October 2026 at 16:00 (UTC+01:00).

Information based on the public notice

What the buyer needs

  • Consortiums, variants and partial offers are not allowed; subcontracting is allowed.

Tender details

Buyer
Schweizerische Schifffahrtsgesellschaft URh
Country
Switzerland
Procedure
open
Classification
Marine engineering · CPV 50200000
Notice reference
44244 · 44244-01
Offer deadline
2026-10-30T16:00:00+01:00

What to check in the tender documents

  • The public notice does not state detailed quantities, technical specifications or all award criteria; consult the tender documents.
Get started with Ziva

Original notice

Read the original description

Engine and propulsion systems replacement with shaft system upgrade and other services

Remotorization and Replacement of the Propulsion Systems on the MS Munot The propulsion system has remained unchanged since the ship was built in 1998 and is to continue operating in this configuration. The entire propulsion systems (2) will be replaced. The engines to be installed comply with current standards and certifications regarding exhaust emissions. As part of these measures, additional upgrades are planned, such as the replacement of the main switchboard, new cabling, and the refurbishment of the control stations. In addition, adjustments will be made to the ship’s systems in accordance with the revised and current provisions of the Swiss Shipbuilding Ordinance (AB-SBV). Translated with DeepL.com (free version)

Official source: SIMAP ↗

Notice updates

November 6, 2026 · Version 2

Deadline information updated · Tender facts updated · Deadline updated · Source notice details updated · Source references updated · Status changed · Notice update added

Engine and propulsion systems replacement with shaft system upgrade and other services

Remotorization and Replacement of the Propulsion Systems on the MS Munot The propulsion system has remained unchanged since the ship was built in 1998 and is to continue operating in this configuration. The entire propulsion systems (2) will be replaced. The engines to be installed comply with current standards and certifications regarding exhaust emissions. As part of these measures, additional upgrades are planned, such as the replacement of the main switchboard, new cabling, and the refurbishment of the control stations. In addition, adjustments will be made to the ship’s systems in accordance with the revised and current provisions of the Swiss Shipbuilding Ordinance (AB-SBV). Translated with DeepL.com (free version)

October 11, 2026 · Version 1

Published

Engine and propulsion systems replacement with shaft system upgrade and other services

Remotorization and Replacement of the Propulsion Systems on the MS Munot The propulsion system has remained unchanged since the ship was built in 1998 and is to continue operating in this configuration. The entire propulsion systems (2) will be replaced. The engines to be installed comply with current standards and certifications regarding exhaust emissions. As part of these measures, additional upgrades are planned, such as the replacement of the main switchboard, new cabling, and the refurbishment of the control stations. In addition, adjustments will be made to the ship’s systems in accordance with the revised and current provisions of the Swiss Shipbuilding Ordinance (AB-SBV). Translated with DeepL.com (free version)