RFI for SF6 free 132 kV AIS circuit breakers at 16.7 Hz

Place
Bern 65, canton of Bern
RFI response deadline
02:00 PM · UTC
Contract value
Not stated in the notice
Classification
Power circuit breakers
Published
November 22, 2026
SIMAP

Overview

SBB Infrastructure Energy is conducting a voluntary RFI market survey for SF6 free two pole AIS circuit breakers for its 132 kV, 16.7 Hz traction power grid. The notice seeks information on products available or in development, including dead tank and live tank designs, development status, availability, type tests and delivery capability. Suppliers should complete the SIMAP questionnaire for each offered design; both questionnaires are requested if they offer both types. Responses are due through SIMAP by 25 February 2027 at 15:00 CET. Suppliers seeking French documents for a later tender should register by 22 January via einkauf.energie@sbb.ch. Participation is voluntary and unpaid; the RFI does not oblige SBB to purchase.

Information based on the public notice

What the buyer needs

The RFI gathers supplier information on two pole SF6 free AIS breakers for SBB’s 132 kV, 16.7 Hz traction grid. It asks about both dead tank and live tank designs, including development status, type tests and delivery capability. The RFI is voluntary and creates no purchase commitment.

  • Complete the SIMAP questionnaire for each design offered. Submit both questionnaires when offering both designs.
  • Responses are submitted digitally through SIMAP by 25 February 2027 at 15:00 CET.
  • Participation is voluntary and unpaid. The notice says participation or nonparticipation will not affect admission to a later procurement. Responses are treated confidentially and used only for this survey.
  • Suppliers who consider themselves qualified and want French documents for the later tender should register that need by 22 January 2027 at einkauf.energie@sbb.ch.
  • SBB may hold technical discussions with selected participants. The later tender alone will establish authoritative procurement terms and dates.
  • The notice states SBB is only obliged to accept offers from Switzerland, the EU, EFTA or the UK; its terms say only a later tender is authoritative.

Tender details

Buyer
SBB CFF FFS Infra-Energie
Country
Switzerland
Procedure
no_process
Classification
Power circuit breakers · CPV 31212000
Notice reference
47943 · 47943-01
Purpose
Voluntary market survey for a possible later procurement; no purchase is committed
Equipment
SF6 free two pole 132 kV AIS circuit breakers for 16.7 Hz traction power
RFI response deadline
25 February 2027 at 15:00 CET through SIMAP
French document request
Register interest by 22 January 2027 at einkauf.energie@sbb.ch
Publication
SIMAP reference 47943-01

What to check in the tender documents

  • No estimated value, award criteria, contract period or delivery location for a later procurement is specified in the RFI.
  • The attached technical specification and questionnaire were not accessed, so technical line items and detailed qualification criteria are unavailable.
Get started with Ziva

Original notice

Read the original description

Market survey: SF6-free 132 kV AIS circuit breakers (dead-tank and live-tank) for 16.7 Hz

SBB AG, Infrastructure Energy, operates the 132 kV / 16.7 Hz transmission grid that supplies traction power to the railway. Two-pole 132 kV circuit breakers (AIS) are used in the outdoor switchyards of its substations, switching stations and power plants. Because new requirements on insulating gases in switchgear will come into force, SBB intends to procure SF6-free circuit breakers in future. The specification (AQV SBB-EN 36-006) “SF6-free 132 kV circuit breakers (AIS)”, version 3.0, has been revised accordingly and is designed for interrupting and insulating media with a GWP < 1. The specification is attached to this publication. With this market survey (RFI), SBB intends to: gain an overview of available SF6-free two-pole circuit breakers for 132 kV / 16.7 Hz and of those under development; examine the availability of dead-tank and live-tank designs on an equal basis; clarify the suppliers’ development status, availability, type tests and delivery capability; obtain feedback from suppliers on the requirements of the specification. Participants are asked to complete the attached questionnaire (Excel format) for the design they offer. If both designs (dead-tank and live-tank) are offered, both questionnaires must be submitted.

Official source: SIMAP ↗