Lower Saane River Management Plan: Deputy Project Management and Water Engineering

Place
Laupen, canton of Bern
Conflicting deadline information
Not available
Contract value
Not stated in the notice
Contract period
Execution period: 15 April 2027 to 31 March 2031. Contract period: 15 April 2027 to 31 December 2032. SIMAP says an extension is possible but gives no extension details.
Published
November 20, 2026
SIMAP

Overview

The Wasserbauverband Untere Saane seeks advisory and planning services for a river management plan, including deputy overall project management and specialist hydraulic engineering and sediment planning for phases two through four. Work covers flood protection, maintenance planning for protective structures, sediment management with a model, and revitalization. The structured SIMAP deadline and German submission instruction give 28 January 2027 at 23:59 CET, while a French free text field gives 22 January. Offers require postal or courier delivery plus a digital PDF by email.

Information based on the public notice

What the buyer needs

Consultancy and planning for the Lower Saane river management plan, covering deputy overall project management and specialist water engineering and sediment planning for phases two through four. The described work includes flood protection, maintenance planning for protective structures, sediment management with a model, and revitalization.

  • Submit a paper offer to the stated address. Postal submission must carry a Swiss Post A priority postmark; courier delivery must arrive by 16:00 at the submission address. The official fields disagree on the applicable date.
  • Mark the envelope with the tender title and an instruction not to open it.
  • Also send a print friendly PDF copy with informative filenames following the tender naming system to info@untere-saane.ch. This is the functional submission mailbox named in the notice.
  • The offer language is German. Consortia are permitted, but consortium members may not submit multiple offers. Subcontractors are permitted.
  • Partial offers and variants are not permitted.

Tender details

Buyer
Wasserbauverband Untere Saane
Country
Switzerland
Procedure
open
Classification
Architectural and engineering services · 71000000, architectural and engineering services
Notice reference
47491 · 47491-01
Scope
Advisory and planning for the Lower Saane river management plan, with deputy overall management and specialist hydraulic and sediment planning
Service area
Lower Saane area and Bern
Submission address
Schützenstrasse 38, 3177 Laupen, Switzerland
Offer deadline discrepancy
Structured SIMAP deadline and German instruction: 28 January 2027 at 23:59 CET. French free text: 22 January 2027. The notice fields conflict.
Submission method
Paper offer by post or courier and a digital PDF copy by email to info@untere-saane.ch
Required language
German
Works period
15 April 2027 to 31 March 2031
Contract period
15 April 2027 to 31 December 2032; extension possible
Offer validity
270 days after the applicable offer deadline

What to check in the tender documents

  • SIMAP has conflicting submission dates: the structured deadline and German instruction say 28 January 2027 at 23:59 CET, while a French free text field says 22 January 2027. Confirm the applicable date with the buyer before submitting.
  • No estimated contract value is stated.
  • Qualification conditions and award criteria are in the SIMAP tender documents. Those supporting documents were not reviewed.
Get started with Ziva

Original notice

Read the original description

Gewässerrichtplan Untere Saane, Gesamtleitung Stv. sowie Fachplanung Wasserbau und Geschiebe

Erbringen der Beratungs- und Planungsleistungen Gesamtleitung Stellvertretung sowie Fachplanung Wasserbau und Geschiebe gemäss Handbuch Gewässerrichtpläne "Anleitung zur Erarbeitung von Gewässerrichtplänen" für die 2. bis 4. Phase zur Erstellung eines Gewässerrichtplans, d.h. Bearbeitung von Teilaufgaben der Gesamtleitung sowie aller wasserbaulicher Belange wie Hochwasserschutz, Unterhaltskonzept Schutzbauten, Geschiebemanagement inkl. Geschiebemodell und Revitalisierungen.

Official source: SIMAP ↗