Penallta Road Bridge strengthening works

Outcome

Submissions closed on 30 October 2026. No award has been published yet. Open tenders like this one are listed below.

Place
Penallta Road Bridge, Penallta Road, Ystrad Mynach, Hengoed, Caerphilly County Borough, Wales, CF82 7GN
30 October 2026; notice states 14:00 without a timezone
Time not stated
Contract value
£600,000
Estimated total value excluding VAT
Lots
1 lot
Contract period
4 January to 26 February 2027; the notice gives dates without timezone
Published
October 4, 2026
Sell2Wales

Overview

Caerphilly County Borough Council seeks a suitably qualified and experienced principal contractor to strengthen Penallta Road Bridge in Ystrad Mynach. The works add a reinforced-concrete box structure, foam-concrete infill and blockwork permanent formwork clad in blue pennant stone; the existing superstructure remains in place. The below-threshold open competition has one lot and an estimated value of £600,000 excluding VAT (£720,000 including VAT). Bids are due by 30 October 2026; the notice gives 14:00 but no timezone. Electronic submission is via Proactis. Cost is weighted 70% and quality 30%.

Information based on the public notice

What the buyer needs

Strengthening of Penallta Road Bridge with a reinforced-concrete support box, foam-concrete infill and stone-clad permanent blockwork formwork, retaining the existing superstructure.

  • The buyer seeks a suitably qualified and experienced principal contractor.
  • Submit electronically through the stated Proactis supplier portal.

Lots

1 ·SA242 Penallta Road Bridge Strengthening

Tender details

Buyer
Caerphilly County Borough Council
Country
United Kingdom
Procedure
UK4
Classification
Bridge strengthening works
Notice reference
OCT664447
Estimated value
GBP 600,000 excluding VAT; GBP 720,000 including VAT
Deadline
30 October 2026; 14:00 stated, timezone not stated
Contract period
4 January to 26 February 2027 (dates; no timezone stated)
Award criteria
Cost 70%; quality 30%

What to check in the tender documents

  • The notice states the submission time as 14:00 without a timezone. No further qualification documents or detailed method requirements are specified in the notice.
Get started with Ziva

Original notice

Read the original description

SA242 Penallta Road Bridge Strengthening

SA242 Penallta Road Bridge Strengthening Caerphilly County Borough Council (CCBC) is seeking to appoint an external suitably qualified and experienced Principal Contractor to undertake works to Penallta Road Bridge, Penallta Road, Ystrad Mynach, Hengoed, Caerphilly County Borough, Wales, CF82 7GN. CCBC’s Engineering Projects Group (EPG) is the client for this project and will oversee the works. The proposed strengthening solution comprises the construction of a reinforced concrete box structure designed to provide long-term support to the existing asset. Any voids between the existing structure and the new reinforced concrete box will be infilled with foam concrete to ensure full load transfer and structural continuity. Permanent formwork will be utilised, consisting of blockwork construction with blue pennant stone cladding to all exposed faces, mechanically tied at both end elevations to provide a durable and aesthetically sympathetic finish. It should be noted that the existing superstructure will remain in situ. However, the introduction of the reinforced concrete box and associated infill will fundamentally alter the structural arrangement and load-bearing behaviour of the asset when compared with its current configuration. Caerphilly County Borough Council (CCBC) is seeking to appoint an external suitably qualified and experienced Principal Contractor to undertake works to Penallta Road Bridge, Penallta Road, Ystrad Mynach, Hengoed, Caerphilly County Borough, Wales, CF82 7GN. CCBC’s Engineering Projects Group (EPG) is the client for this project and will oversee the works. The proposed strengthening solution comprises the construction of a reinforced concrete box structure designed to provide long-term support to the existing asset. Any voids between the existing structure and the new reinforced concrete box will be infilled with foam concrete to ensure full load transfer and structural continuity. Permanent formwork will be utilised, consisting of blockwork construction with blue pennant stone cladding to all exposed faces, mechanically tied at both end elevations to provide a durable and aesthetically sympathetic finish. It should be noted that the existing superstructure will remain in situ. However, the introduction of the reinforced concrete box and associated infill will fundamentally alter the structural arrangement and load-bearing behaviour of the asset when compared with its current configuration.

Official source: Sell2Wales ↗