Lower Saane river plan, deputy project management and water engineering and sediment planning

The available notice information records a deadline timestamp corresponding to 28 January 2027 at 00:00 CET. The current official TED XML gives 28 January 2027 at 23:59 CET, 23 hours and 59 minutes later. Use the deadline in the official notice.

Place
Lower Saane area and Bern, Switzerland
Offer submission deadline
10:59 PM · UTC
Contract value
Not stated in the notice
Lots
1 lot
Contract period
Planned period from 15 April 2027 to 31 December 2032. One extension is possible; its duration is not stated.
Published
November 23, 2026
TED

Overview

The Wasserbauverband Untere Saane seeks consulting and planning services for phases two through four of a river management plan. The assignment combines deputy overall project management with specialist water engineering and sediment planning. The notice names flood protection, a maintenance concept for protective structures, sediment management including a sediment model, and revitalization. The project area covers Laupen, Ferenbalm, Mühleberg, Wileroltigen and Kallnach, as well as Bern. The official TED XML sets the offer deadline at 28 January 2027, 23:59 CET. The snapshot timestamp corresponds to 28 January at 00:00 CET, 23 hours and 59 minutes earlier.

Information based on the public notice

What the buyer needs

Planning and advisory services for the Lower Saane river management plan, including water engineering and sediment management. Detailed selection and award criteria are referenced in procurement documents and are not reproduced in the retrieved XML.

  • The submission language is German. Electronic submission is not allowed. The retrieved XML does not specify the actual submission channel; consult the official notice and procurement documents.

Lots

LOT-0000 ·Gewässerrichtplan Untere Saane

Tender details

Buyer
Wasserbauverband Untere Saane
Country
Switzerland
Procedure
Open procedure with one lot. The notice states that electronic submission is not allowed.
Classification
Engineering services · CPV 71000000
Notice reference
817241-2026
Deadline
28 January 2027 at 23:59 CET in the official TED XML. The available notice information time corresponds to 28 January at 00:00 CET, 23 hours and 59 minutes earlier.
Scope
Deputy overall project management and specialist water engineering and sediment planning for phases two through four of the river management plan.
Planned period
15 April 2027 to 31 December 2032. The notice permits one extension but does not state its duration.

What to check in the tender documents

  • The detailed selection criteria and award criteria are in procurement documents not reviewed here.
  • The retrieved XML does not specify the submission channel or estimated contract value.
Get started with Ziva

Original notice

Read the original description

Schweiz – Dienstleistungen von Architektur-, Konstruktions- und Ingenieurbüros und Prüfstellen – Gewässerrichtplan Untere Saane, Gesamtleitung Stv. sowie Fachplanung Wasserbau und Geschiebe

Erbringen der Beratungs- und Planungsleistungen Gesamtleitung Stellvertretung sowie Fachplanung Wasserbau und Geschiebe gemäss Handbuch Gewässerrichtpläne "Anleitung zur Erarbeitung von Gewässerrichtplänen" für die 2. bis 4. Phase zur Erstellung eines Gewässerrichtplans, d.h. Bearbeitung von Teilaufgaben der Gesamtleitung sowie aller wasserbaulicher Belange wie Hochwasserschutz, Unterhaltskonzept Schutzbauten, Geschiebemanagement inkl. Geschiebemodell und Revitalisierungen.

Official source: TED ↗