Blenheim Gardens public toilet and accessible facilities refurbishment

Minehead Town CouncilUnited KingdomClosed

Outcome

Submissions closed on 6 November 2026. No award has been published yet. Open tenders like this one are listed below.

Place
United Kingdom
6 November 2026 at 12:00 as displayed on Contracts Finder.
Time not stated
Contract value
Not stated in the notice
Contract period
Contract start 4 January 2027; facilities operational by 1 March 2027.
Published
October 6, 2026
official_notice_html

Overview

Minehead Town Council invites tenders to convert the former storm shelter and refurbish a separate toilet building in Blenheim Gardens. The works will create public toilets, baby-changing and handwashing facilities, and a separate fully accessible toilet with storage. The project covers building alterations, drainage, utility connections, plumbing, electrical and ventilation systems, roof repairs or replacement, finishes, accessibility and external repairs, with testing, commissioning and handover. Contractors provide labour, materials, plant, supervision and specialists, and handle project management, utility liaison and Building Regulations compliance. The facilities must be operational by 1 March 2027. The open below-threshold opportunity is listed at £200,000 as “Value of contract”; the page does not state whether this is an estimate or ceiling, so no estimated-value figure is assigned.

Information based on the public notice

What the buyer needs

Conversion and refurbishment of two existing Blenheim Gardens buildings into public toilet facilities, including an accessible toilet and storage. The scope includes building, drainage, utility, plumbing, electrical, ventilation, roof, finish, accessibility and external works through commissioning and handover.

  • Demonstrate relevant experience delivering comparable construction and refurbishment projects.
  • Provide evidence of ability to meet programme requirements.

Tender details

Buyer
Minehead Town Council
Country
United Kingdom
Procedure
Open procedure (below threshold)
Classification
CPV 45211310
Notice reference
ocds-b5fd17-2654d89d-b94c-4fcc-baa8-6626f5d79e09 · MTC/BG
Deadline
6 November 2026 at 12:00, as displayed by Contracts Finder
Contract value field
£200,000, labelled “Value of contract”; the page does not clarify whether this is an estimate or ceiling.
Contract period
Starts 4 January 2027; facilities must be operational no later than 1 March 2027.
Procedure and type
Open procedure (below threshold); works.
Eligibility evidence
Tenderers are asked to demonstrate relevant experience in comparable construction/refurbishment projects and ability to meet the programme.

What to check in the tender documents

  • The notice links invitation and bidding documents; those supporting documents were not opened. Detailed submission instructions, full technical specification, pricing schedule and additional qualification conditions in those documents are therefore not assessed.
Get started with Ziva

Original notice

Read the original description

Conversion of Storm Shelter into Public Convenience Facilities and Refurbishment of Accessible Toilet Accommodation, Blenheim Gardens, Minehead

Minehead Town Council invites suitably qualified and experienced contractors to submit tenders for the conversion of the former storm shelter within Blenheim Gardens, Minehead into modern public convenience facilities together with the refurbishment and conversion of a separate toilet building within the gardens to provide fully accessible toilet accommodation and associated storage facilities. The site occupies a prominent position within Blenheim Gardens, Minehead's principal public open space, and lies within the Wellington Square Conservation Area. The Council wishes to deliver attractive, durable, accessible and vandal-resistant facilities whilst preserving the architectural character and appearance of the existing buildings. The works comprise the alteration, refurbishment and fit out of two existing buildings. The former storm shelter will be converted to provide male and female public toilet accommodation, baby changing facilities and associated handwashing facilities. A separate building within the gardens will be refurbished to provide a fully accessible toilet facility together with independent storage accommodation. The project includes, but is not limited to, demolition and alteration works, drainage works, utility connections, plumbing and sanitary installations, electrical installations, ventilation systems, roofing replacement and repairs, internal finishes, accessibility improvements, external repairs, testing, commissioning and all associated works necessary to provide fully operational public convenience facilities. The successful contractor will be responsible for providing all labour, materials, plant, supervision and specialist subcontractors required to complete the works. Responsibilities will include project management, utility provider liaison, Building Regulations compliance, testing, commissioning, certification and handover. Particular emphasis is placed upon durability, long-term maintainability, accessibility and resistance to vandalism. Materials, fixtures, fittings and finishes must be suitable for intensive public use and capable of withstanding a coastal environment exposed to wind-driven rain, salt-laden air and high seasonal visitor numbers. Tenderers shall demonstrate relevant experience in the successful delivery of comparable construction and refurbishment projects and provide evidence of their ability to meet programme requirements. The completed facilities must be fully operational and available for public use no later than 1 March 2027. The Council reserves the right not to accept the lowest or any tender received and reserves the right to amend, suspend, abandon or recommence the procurement process at any stage.

Official source: official_notice_html ↗