Ship management for the MODULARIS sea-going technology platform
Outcome
Submissions closed on 20 November 2026. No award has been published yet. Open tenders like this one are listed below.
The page shows the participation request deadline as 20 November 2026 at 10:00 CET (09:00 UTC), as stated in the official TED notice. The DTVP listing shows 08:00 UTC for the same date.
- Place
- Kiel, Germany
- 20 November 2026, 10:00 CET (09:00 UTC)
- 09:00 AM · UTC
- Contract value
- Not stated in the notice
- Lots
- 1 lot
- Contract period
- Fixed term of 36 months from delivery of the MODULARIS platform by the shipyard to DLR, with a one-sided DLR option to extend phase 2 by 12 months at a time. Delivery is planned for October 2027.
- Published
- October 22, 2026
- Official TED eForms notice 732363-2026 (Deutsches Zentrum für Luft- und Raumfahrt e.V.), with the DTVP listing as canonical snapshot
Overview
The German Aerospace Center (DLR) is procuring ship management services for its sea-going technology platform MODULARIS, which is to be berthed in Kiel and is planned for delivery by the shipyard in October 2027. The service runs in two phases. Phase 1 covers preparing the vessel as a SOLAS research ship, the safety management manual, the planned maintenance system and the initial equipment. From delivery, the managing company runs the ship management and the safe operation of the platform. The procedure is a negotiated procedure with a prior call for competition. Participation requests are due on 20 November 2026 at 10:00 CET. The notice asks for references from operating research or offshore fleets and for declarations on exclusion grounds, labour standards and the ISM Code. The fixed term is 36 months from delivery, with a DLR option to extend phase 2 by 12 months at a time. No estimated value is stated.
Information based on the public notice
Ask about this tender
What the buyer needs
A services tender by the German Aerospace Center (DLR) for the ship management of its sea-going technology platform MODULARIS. Phase 1 prepares the vessel for research use as a SOLAS ship and includes the first equipment. Phase 2 starts with delivery of the platform and covers the managing company's ship management and safe operation until the end of the contract term.
- Proof of registration in a commercial or professional register, not older than three months at the closing date
- Turnover for the last three completed financial years
- Declaration on staff development over the last three financial years
- At least one reference from the last four years proving operation of a research and/or offshore fleet, described on no more than two A4 pages
- Declaration that the working language of the project is German, at least level C1
- Participation requests and bids in German in all parts
- Company profile with the details listed in the notice, such as founding date, locations, legal form, register and VAT ID
- No exclusion grounds under sections 123 and 124 GWB, or self-cleaning under section 125 GWB
- Declarations of subcontractors and supporting companies, where applicable, and a declaration for consortia, where applicable
- Declarations on compliance with the ILO core working time standards, the German Minimum Wage Act (MiLoG), the Maritime Labour Convention (MLC) and the ISM Code
Lots
LOT-0001 ·Bereederung der seegängigen Technologieplattform MODULARIS
Tender details
- Buyer
- Deutsches Zentrum für Luft- und Raumfahrt e.V. (DLR)
- Country
Germany
- Procedure
- Negotiated procedure with a prior call for competition
- Classification
- Transport and logistics services
- Notice reference
- center-pid-2633893
- Legal basis
- VgV (German Public Procurement Ordinance), based on Directive 2014/24/EU
- Participation request deadline
- 20 November 2026, 10:00 CET (09:00 UTC)
- Place of performance
- Kiel, Germany (berth of the platform)
- Planned delivery of the platform
- October 2027
- Contract term
- 36 months fixed from delivery, with a DLR option to extend phase 2 by 12 months at a time
- Award weighting
- Calculated contract price 30, performance 70
- Notice language
- German
What to check in the tender documents
- The estimated value of the contract is not stated in the official notice.
- The detailed service specification and the tender documents are outside this record and were not reviewed.
Original notice
Read the original description
Bereederung der seegängigen Technologieplattform MODULARIS
Official source: Official TED eForms notice 732363-2026 (Deutsches Zentrum für Luft- und Raumfahrt e.V.), with the DTVP listing as canonical snapshot ↗
Notice updates
November 11, 2026 · Version 2
Contract period updated · Deadline information updated · Summary and analysis updated · Tender facts updated · Original notice updated · Deadline updated · Location updated · Source updated · Source references updated · Notice update added
Bereederung der seegängigen Technologieplattform MODULARIS
Das DLR baut eine Großinfrastruktur auf, um die neu zu entwickelnden maritimen Technologien in standardisierter Laborumgebung sowie unter realen Bedingungen auf einer schwimmenden Forschungsplattform zu testen und zu erproben. Für die Entwicklung, Demonstration und Vorbereitung von Zertifizierungen von maritimen Energiesystemen wird daher eine seegängige Technologieplattform im Rumpf eines Schiffes (MODULARIS) für neue Energieträger und Energiekonverter sowie zur Erprobung sonstiger technischer und navigatorischer Systeme beschafft. Der vorgesehene Liegeplatz befindet sich in Kiel; die Ablieferung der Plattform ist für Oktober 2027 vorgesehen. Gegenstand der Ausschreibung ist die Beschaffung von Bereederungsdienstleistungen für die Technologieplattform MODULARIS. Die Leistung ist durch einen fachlich geeigneten und leistungsfähigen Auftragnehmer zu erbringen, der über nachweisliche Erfahrung im Forschungsumfeld sowie im Betrieb von Forschungs- oder Offshore-Fahrzeugen verfügt. Die Leistungserbringung gliedert sich in zwei Phasen. Die Phase 1 umfasst insbesondere die Vorbereitung der MODULARIS als SOLAS-Schiff zur Verwendung als Forschungsplattform, die Erstellung von SMM und PMS, die Unterstützung bei der Vorbereitung der vorschriftsgemäßen Schiffsbesatzung sowie die Erstausrüstung. Mit Ablieferung der MODULARIS durch die Werft an das DLR beginnt Phase 2, in der der Auftragnehmer als eingetragene Managing Company die Bereederung sowie den sicheren Betrieb der Technologieplattform bis zum Ende der Vertragslaufzeit sicherstellt. Die Bereederung gliedert sich in zwei Phasen: Phase 1 umfasst den Zeitraum von der Zuschlagserteilung bis zur Ablieferung der MODULARIS durch die Werft an das DLR; Phase 2 erstreckt sich von der Ablieferung der MODULARIS durch die Werft an das DLR bis zum Ende der festen Vertragslaufzeit. Die feste Laufzeit beträgt 36 Monaten gerechnet ab Ablieferung der MODULARIS von der Bauwerft an das DLR. Das DLR hat eine einseitige Option, die Laufzeit der Phase 2 um jeweils weitere 12 Monate zu verlängern. Die Option kann maximal dreimal gezogen werden.
November 11, 2026 · Version 1
Published
Bereederung der seegängigen Technologieplattform MODULARIS
https://www.dtvp.de/Center/secured/company/projectForwarding.do?pid=2633893
Source retrieved: 2026-11-11T16:15:57Z