Road rehabilitation on cantonal roads H19 and H6 at Gletsch
- Place
- Oberwald (Gemeinde Obergoms), canton of Valais
- Offer deadline: 9 December 2026 at 23:55 CET
- 10:55 PM · UTC
- Contract value
- Not stated in the notice
- Contract period
- 26 April 2027 to 31 July 2029, starting with the construction start
- Published
- November 11, 2026
- SIMAP
Overview
The Valais mobility office for district Oberwallis is tendering the structural road rehabilitation of two cantonal roads at Gletsch: the H19 between reference points 490+520 and 490+850 on the Brig to Furka Pass route, and the H6 between 0+000 and 0+400 on the Gletsch to Grimsel Pass route. The civil works list about 2,800 m2 of surface removal, 740 m2 of milling, 4,600 m3 of excavation, 5,000 m3 of sub-base, 1,460 t of asphalt in three mixes, 150 m of pipework, five inspection shafts and 740 m of kerbs. Construction starts on 26 April 2027 and runs to 31 July 2029. No site visit is planned. Offers are due on 9 December 2026 at 23:55 CET.
Information based on the public notice
Ask about this tender
What the buyer needs
Structural road rehabilitation of two cantonal road sections at Gletsch in the Obergoms, covering surface removal, milling, earthworks, sub-base, three asphalt mixes, drainage pipes and shafts, kerbs, natural stone paving and in-situ concrete. The notice lists the quantities in its order description, so bidders can judge the scale of the works from the public notice itself.
- Offers are submitted externally to the office in Brig-Glis by 9 December 2026 at 23:55 CET, as stated in the notice.
- Consortia and subcontractors are permitted.
- No site visit is planned; variants and partial offers are not permitted.
Tender details
- Buyer
- Dienststelle für Mobilität - Kreis 1 Oberwallis, Kantonsstrasse 275, 3902 Brig-Glis
- Country
Switzerland
- Procedure
- open
- Classification
- Construction and civil works · CPV 45233120
- Notice reference
- 47447 · 47447-01
- Works
- Structural rehabilitation of cantonal roads H19 (reference points 490+520 to 490+850) and H6 (0+000 to 0+400) at Gletsch
- Offer deadline
- 9 December 2026 at 23:55 CET (UTC+01:00)
- Documents available
- 12 November to 9 December 2026
- Questions
- Last date 27 November 2026
- Execution period
- 26 April 2027 to 31 July 2029, starting with the construction start
- Offer validity
- 270 days
- Site visit
- None planned
- Consortia and subcontractors
- Both permitted
- Variants and partial offers
- Not permitted
What to check in the tender documents
- The public notice does not state an estimated contract value.
- Qualification and award criteria are referred to the tender documents and are not reproduced in the public notice.
Original notice
Read the original description
Strassensanierung H19/H6 Gletsch
Official source: SIMAP ↗
https://www.simap.ch/de/project-detail/df4432dd-559c-4d19-8db4-74c5c0c2efbc
Source retrieved: 2026-11-12T03:31:23Z