Submission deadline: 21 September 2026 at 23:59 (UTC+02:00)
09:59 PM · UTC
Contract value
Not stated in the notice
Contract period
Contract: 1 October 2026 to 30 September 2029; execution: 23 November 2026 to 31 August 2027
Published
August 20, 2026
SIMAP
Overview
The Municipality of Horw tendered building works for the new Allmend primary school. The four-storey timber-structure building replaces the outdoor sports area and includes pile foundations, three reinforced-concrete service cores, prefabricated timber façade elements, flood-protection measures, district heating, photovoltaic roofing and accessible public grounds. The public description covers the overall school project but does not break down the construction package quantities. The contract period is 1 October 2026 to 30 September 2029, with execution planned from 23 November 2026 to 31 August 2027. The 21 September deadline has passed.
Building works for the new Allmend school building, with the public notice describing the wider building design rather than package quantities.
Offers were submitted electronically through SIMAP. Consortiums and subcontractors are allowed; variants are allowed, but partial offers are not. The deadline has passed.
Tender details
Buyer
Gemeinde Horw, Neubau Schulhaus Allmend
Country
Switzerland
Procedure
open
Classification
School construction works · 45000000 — Construction work
Notice reference
42449
Submission deadline
21 September 2026 at 23:59 (UTC+02:00)
Publication reference
42449-01
Contract period
Contract: 1 October 2026 to 30 September 2029; execution: 23 November 2026 to 31 August 2027
What to check in the tender documents
The public notice does not give construction-package quantities, estimated value or award criteria.
construction work
The planned new Allmend primary school building aims to create a future-proof, sustainable, and pedagogically functional infrastructure for primary grades 1 through 6. The four-story building will be constructed using conventional timber framing on the school grounds, replacing the existing outdoor sports facility ("Red Square"). The geological and hydrogeological conditions on the site are considered challenging. In particular, two separate groundwater aquifers must be taken into account. The soil conditions necessitate a pile foundation (concrete displacement piles), including timber piles for utility lines and inspection chambers. With regard to flood protection, the new building meets the requirements for a 300-year flood event (HQ300). Building services will be located on the ground floor and top floor (no basement) to prevent damage from flooding. The building's load-bearing structure is based on a solid timber frame made of spruce/fir. This is complemented by three solid service cores made of reinforced concrete. The spiral staircases between the service cores are also constructed of reinforced concrete. The facade consists of prefabricated timber-frame exterior elements. The building is certified according to SNBS 2.1 building construction standards (aiming for Gold certification). Energy is supplied via a connection to the local district heating network SeeEnergy (heating in winter, cooling water in summer). All surfaces are equipped with underfloor heating. All floor coverings are made of polished industrial concrete, serving as thermal mass and providing gentle free cooling during summer overheating. Temperature is controlled by room thermostats via preset temperature settings. A building-integrated photovoltaic system is installed on the roof to generate electricity and also functions as the roof covering. Metal brise-soleil structures along the east and west facades act as shades and provide structural weather protection for the facade. Mechanical ventilation is planned only for the interior cores and the auditorium. Classrooms receive fresh air via manual natural window ventilation. The building is fully accessible. The planned school building, with a total height of approximately 19 meters and constructed using hybrid methods, is classified as a medium-rise building. Fire protection planning complies with quality level QSS 2 of the VKF (Association of Cantonal Fire Insurance Companies) fire protection guidelines. The landscaping is based on the "Center 1st + 2nd Phase" design concept and contributes to the development of a unified public open space in the center of Horw. The school playground will be designed as a traffic-free, publicly accessible space, taking into account its use by extracurricular activities. The school garden is exclusively for school use and is designed accordingly, with a focus on children and natural features, in line with climate adaptation and biodiversity promotion principles.