New railway switches (Lot 1) and cable civil works (Lot 2), line 4600 near Plochingen

Outcome

Submissions closed on 27 October 2026. No award has been published yet. Open tenders like this one are listed below.

Place
Line 4600, km 0.00–4.90, Plochingen, Germany
Submission deadline: 27 October 2026 at 08:30 UTC
08:30 AM · UTC
Contract value
Not stated in the notice
Classification
Railway track and cable infrastructure works
Published
October 5, 2026
oeffentlichevergabe.de, Germany’s public procurement notice portal

Overview

DB InfraGO AG plans a new switch connection at the east end of Plochingen station to remove a bottleneck and enable additional train movements; cable civil works are also required. Lot 1 covers specified switch installation, connecting track, track removal, earthworks, tamping and alignment, welding, further tamping as technically needed and disposal. Lot 2 covers earthworks, track crossings, a concrete cable duct, cable laying and a signal foundation. Planning services are stated as the start of performance; further contract dates are referenced in the construction contract. Offers are due 27 October 2026 at 08:30 UTC.

Information based on the public notice

What the buyer needs

At the east end of Plochingen station, a new switch connection is intended to remove a bottleneck and enable further train movements. Lot 1 comprises switch types ABW 60-300-1:9 B and IBW 60-300-1:9 B including connecting track; removal of track superstructure; earthworks; tamping and alignment; welding; additional tamping as technically required; and disposal. Lot 2 comprises earthworks, new track crossings, a concrete cable duct, cable laying and a new signal foundation. The notice says performance begins with execution of planning services and refers to other dates in the construction contract.

Tender details

Buyer
DB InfraGO AG, Geschäftsbereich Fahrweg (Bukr 16)
Country
Germany
Procedure
Open procedure
Classification
Railway track and cable infrastructure works · 45234116; 45314310
Notice reference
ocds-mnwr74-25826834
Lot 1
Installation of new switches ABW 60-300-1:9 B and IBW 60-300-1:9 B, connecting track, track removal, earthworks, tamping/alignment, welding and disposal
Lot 2
Earthworks, track crossings, concrete cable duct, cable laying and signal foundation
Purpose
Resolve a bottleneck and enable additional train movements at Plochingen station
Line section
Line 4600, km 0.00–4.90, Plochingen
Start stated
Execution of planning services; other contract dates are referenced in the construction contract
Submission deadline
27 October 2026 at 08:30 UTC

What to check in the tender documents

  • The available notice text does not provide the detailed dates referenced in the construction contract, quantities, estimated value, qualification requirements or award criteria.
Get started with Ziva

Original notice

Read the original description

Weichenneubau (Los 1), Kabeltiefbau (Los 2) Strecke 4600 km 0,00 bis 4,90 Plochingen

Im Ostkopf des Bahnhofs Plochingen soll durch den Neubau einer Weichenverbindung (Los 1) ein Engpass aufgelöst und weiter Fahrbeziehungen ermöglicht werden. Zudem sind Kabeltiefbauarbeiten (Los 2) erforderlich. Leistungsbeginn=Ausführung Planungsleistungen (siehe Vertragstermine gem. Bauvertrag) Los 1: Weicheneinbau ABW 60-300-1:9 B und IBW 60-300-1:9 B inkl. Verbindungsgleis, Rückbau Oberbau, Erdarbeiten, Stopf -und Richtarbeiten, Schweißarbeiten, Stopfgang nach techn. Notwendigkeit, Entsorgung. Los 2: Erdarbeiten, Neubau Gleisquerungen, Neubau Betonkabelkanal, Kabelverlegung, Neubau Signalfundament. Weichenneubau (Los 1), Kabeltiefbau (Los 2) Strecke 4600 km 0,00 bis 4,90 Plochingen

Official source: oeffentlichevergabe.de, Germany’s public procurement notice portal ↗