Electrical equipment for the new Ponta Delgada substation
Outcome
Submissions closed on 19 October 2026. No award has been published yet. Open tenders like this one are listed below.
This notice amends the earlier procedure announcement; the stated change concerns submission conditions and updated procurement documents.
- Place
- Portugal
- Submission deadline (time zone not stated)
- Time not stated
- Contract value
- Not stated in the notice
- Classification
- Electrical substation equipment
- Published
- September 27, 2026
- Diário da República, 2.ª série, Parte L — Contratos Públicos
Overview
EEM is procuring the supply, installation and commissioning of medium-voltage equipment, automation systems and supervisory control and data acquisition systems for the new 30/6.6 kV Ponta Delgada substation. The scope includes the equipment, systems, materials, installation and testing needed to make the substation operational under the execution design. The notice sets a €1,975,000 base budget excluding VAT, a 570-day contract term and a 2% guarantee. Offers are assessed on price (60%) and quality (40%). Submission is electronic through VORTAL; variants are not allowed. The published cutoff is 19 October 2026 at 23:59, with no timezone stated.
Information based on the public notice
Ask about this tender
What the buyer needs
Supply, installation and commissioning of medium-voltage equipment, automation and supervisory control/data acquisition systems for the new 30/6.6 kV substation at Ponta Delgada, including necessary equipment, materials, installation and tests.
- A 2% performance guarantee is required. The offer must remain binding for 90 days from the submission deadline. Variant offers are not permitted; electronic catalogues are permitted. Electronic submission is through VORTAL.
Tender details
- Buyer
- EEM - Empresa de Electricidade da Madeira, SA
- Country
Portugal
- Procedure
- Concurso público
- Classification
- Electrical substation equipment · CPV 31682540-7
- Notice reference
- incm-419973726-a24c249f20b94a2b19609755f7175e8083618989f46847a615828c1e18ce94ac
- Base budget (excluding VAT)
- €1,975,000.00
- Contract term
- 570 days
- Submission deadline
- 19 October 2026, 23:59 as printed; no timezone is stated
- Award criteria
- Price 60%; quality 40%
- Lots
- No lots
What to check in the tender documents
- The notice prints the submission time as 23:59 but does not identify its timezone. The procurement documents were not reviewed.
Original notice
Read the original description
Fornecimento, Montagem e Comissionamento de Equipamentos Elétricos MT/SA/SPCC da Nova Subestação da Ponta Delgada 30/6,6 kV
Official source: Diário da República, 2.ª série, Parte L — Contratos Públicos ↗
https://files.diariodarepublica.pt/cp_hora/2026/09/188/419973726.pdf
Source retrieved: 2026-10-14T02:30:42.547728Z