Installation of solar streetlights in Barangay Barit, Balindong

The Invitation to Bid requires bids to be received by 27 October 2026 at 11:00 Philippine time (UTC+08:00), and this page shows that receipt deadline. The PhilGEPS closing-date field lists 28 October 2026 at 11:00 (UTC+08:00).

Place
Philippines
Bid receipt deadline
03:00 AM · UTC
Contract value
₱1,261,000
Approved Budget for the Contract; not an award amount.
Lots
1 lot
Classification
Civil Works - Infra Project
Published
October 7, 2026
Philippine Government Electronic Procurement System (PhilGEPS)

Overview

The Lanao del Sur Second District Engineering Office invites bids to install 26 solar streetlights in Barangay Barit, Balindong. The notice describes 60-watt LED fixtures with triple galvanized-steel-pipe posts and concrete pedestals. PhilGEPS identifies one lot, an Approved Budget for the Contract of PHP 1,261,000 and a 30-calendar-day completion period. The invitation requires a similar contract completed within 20 calendar days of bid submission, which is reproduced as written, and at least 60% Filipino ownership for covered partnerships or organizations. The Invitation to Bid requires bid receipt by 27 October 2026 at 11:00 Philippine time (UTC+08:00). This page shows that receipt cutoff and flags PhilGEPS’s conflicting 28 October 11:00 closing date.

Information based on the public notice

What the buyer needs

Installation of one-lot solar streetlighting works at Barangay Barit, Balindong.

  • Bids above PHP 1,261,000 are rejected. The invitation states a similar-contract experience period of “20 Calendar Days” from bid submission. Partnerships or organizations must meet the stated 60% Filipino-ownership condition. Bid security is required under ITB Clause 16.

Lots

1 ·Installation of solar streetlights, Barangay Barit, Balindong

Tender details

Buyer
Ministry of Public Works – BARMM Lanao del Sur 2nd District Engineering Office
Country
Philippines
Procedure
Competitive Bidding (Public Bidding)
Classification
Not stated in the notice
Notice reference
95801
Approved contract budget
PHP 1,261,000.00; bids above the ABC are rejected.
Scope
One lot: 26 units of 60-watt LED solar streetlights with triple galvanized steel-pipe posts and concrete pedestals.
Completion
30 calendar days.
Experience condition
A similar contract completed within “20 Calendar Days” from bid submission, as printed in the invitation.
Eligibility
At least 60% Filipino ownership for stated partnerships or organizations.
Bid document fee
PHP 5,000.
Schedule conflict
Selected bid receipt deadline: 27 October 2026, 11:00 Philippine time (UTC+08:00). The PhilGEPS closing-date field lists 28 October 2026, 11:00.

What to check in the tender documents

  • The PhilGEPS page lists a closing date of 28 October 2026 at 11:00, while the Invitation to Bid requires receipt of bids by 27 October at 11:00. The page does not explain the discrepancy. The “20 Calendar Days” similar-contract condition is unusual. Detailed technical requirements and bid-security terms are in bidding documents not consulted.
Get started with Ziva

Original notice

Read the original description

INSTALLATION OF SOLAR STREET LIGHTS, BRGY. BARIT, BALINDONG, LANAO DEL SUR

Invitation to bid for installation of 26 solar streetlights in Barangay Barit, Balindong, Lanao del Sur. The specified lights are 60-watt LED units with triple galvanized steel-pipe posts and concrete pedestals. Approved Budget for the Contract: PHP 1,261,000.00; one lot; completion within 30 calendar days. Similar-contract experience is described as completed within “20 Calendar Days” from bid submission. Partnerships or organizations require at least 60% Filipino ownership. The invitation states receipt of bids by 27 October 2026 at 11:00 and opening at 13:00. The PhilGEPS portal instead shows closing on 28 October at 11:00. Neither states a timezone.

Official source: Philippine Government Electronic Procurement System (PhilGEPS) ↗

Notice updates

October 20, 2026 · Version 2

Deadline information updated · Summary and analysis updated · Deadline updated · Notice update added

INSTALLATION OF SOLAR STREET LIGHTS, BRGY. BARIT, BALINDONG, LANAO DEL SUR

Invitation to bid for installation of 26 solar streetlights in Barangay Barit, Balindong, Lanao del Sur. The specified lights are 60-watt LED units with triple galvanized steel-pipe posts and concrete pedestals. Approved Budget for the Contract: PHP 1,261,000.00; one lot; completion within 30 calendar days. Similar-contract experience is described as completed within “20 Calendar Days” from bid submission. Partnerships or organizations require at least 60% Filipino ownership. The invitation states receipt of bids by 27 October 2026 at 11:00 and opening at 13:00. The PhilGEPS portal instead shows closing on 28 October at 11:00. Neither states a timezone.

October 14, 2026 · Version 1

Published

INSTALLATION OF SOLAR STREET LIGHTS, BRGY. BARIT, BALINDONG, LANAO DEL SUR

Invitation to bid for installation of 26 solar streetlights in Barangay Barit, Balindong, Lanao del Sur. The specified lights are 60-watt LED units with triple galvanized steel-pipe posts and concrete pedestals. Approved Budget for the Contract: PHP 1,261,000.00; one lot; completion within 30 calendar days. Similar-contract experience is described as completed within “20 Calendar Days” from bid submission. Partnerships or organizations require at least 60% Filipino ownership. The invitation states receipt of bids by 27 October 2026 at 11:00 and opening at 13:00. The PhilGEPS portal instead shows closing on 28 October at 11:00. Neither states a timezone.