Supply, installation and maintenance of a 10 kVA UPS for NTPC Ramagundam
Outcome
The buyer cancelled this procedure. Open tenders like this one are listed below.
The official NTPC portal marks the tender cancelled in its latest corrigendum list.
- Buyer
- NTPC Limited
- Place
- NTPC Ramagundam, India
- Original bid deadline: 17 October 2026 at 10:00 IST (UTC+05:30).
- 04:30 AM · UTC
- Contract value
- Not stated in the notice
- Contract period
- 900 days
- Published
- October 7, 2026
- NTPC eProcurement
Overview
NTPC Limited invited a limited tender for supplying, installing and commissioning a 10 kVA uninterruptible power supply at NTPC Ramagundam, followed by annual maintenance. The portal lists a 900-day work period and 120-day bid validity, but no tender value. Its latest corrigendum list marks the tender cancelled. The original submission deadline was 17 October 2026 at 10:00 India Standard Time, and the opening was scheduled for 19 October. The technical cover includes local-content and other compliance declarations. The detailed specification and maintenance scope are in procurement documents that were not reviewed.
Information based on the public notice
Ask about this tender
What the buyer needs
Supply, installation and commissioning of a 10 kVA UPS for NTPC Ramagundam, followed by annual maintenance. The public detail does not state the UPS specification or annual-maintenance service levels.
- The portal requires declarations on minimum local content, the local-supplier condition, procurement restrictions for bidders from countries sharing a land border with India, and full compliance with bid documents.
Tender details
- Buyer
- NTPC Limited
- Country
India
- Procedure
- Not stated in the notice
- Classification
- Electrical and electronic equipment
- Notice reference
- SbJ18PKQb2CST3Tyzp09l8g==
- Tender ID
- 2026_NTPC_112470_1
- Scope
- 10 kVA UPS supply, installation, commissioning and subsequent annual maintenance
- Work period
- 900 days
- Bid validity
- 120 days
- Portal status
- Cancelled
What to check in the tender documents
- No tender value or detailed UPS specification is stated in the public detail. The technical specification and maintenance terms are in procurement documents that were not reviewed.
Original notice
Read the original description
Supply Installation, Commissioning and Subsequent AMC of 10 KVA UPS for
Official source: NTPC eProcurement ↗
Notice updates
October 17, 2026 · Version 2
Buyer updated · Classification updated · Contract period updated · Deadline information updated · Summary and analysis updated · Tender facts updated · Original notice updated · Deadline updated · Location updated · Source updated · Source notice details updated · Source references updated · Status changed · Notice update added
Supply Installation, Commissioning and Subsequent AMC of 10 KVA UPS for
Supply Installation, Commissioning and Subsequent AMC of 10 KVA UPS forNTPC Ramagundam
October 14, 2026 · Version 1
Published
Supply Installation, Commissioning and Subsequent AMC of 10 KVA UPS for
Supply Installation, Commissioning and Subsequent AMC of 10 KVA UPS forNTPC Ramagundam
https://eprocurentpc.nic.in/nicgep/app?component=%24DirectLink&page=FrontEndListTendersbyDate&service=direct&session=T&sp=SbJ18PKQb2CST3Tyzp09l8g%3D%3D
Source retrieved: 2026-10-17T08:48:49.970559Z