Construction of the Andrijevci interchange on the A5 motorway

The exact EOJN notice gives 20 October 2026 at 11:00, without a timezone. TED gives 20 October with +02 metadata but no clock. The canonical snapshot separately records 19 October at 22:00 UTC. The public deadline is shown at date precision; no time conversion is asserted.
Time not stated
Contract value
Not stated in the notice
Classification
Not stated in the notice
Published
September 29, 2026

Hrvatske autoceste and EOJN RH (Croatian Electronic Public Procurement Classifieds)

Overview

Hrvatske autoceste d.o.o. is procuring works to construct the Andrijevci interchange on the A5 motorway between Beli Manastir, Osijek and Svilaj. The exact buyer's page links to EOJN tender 89822 and matches control number 1-400-2026-486. EOJN identifies an open works procedure and shows an estimated-value figure of 7,500,000.00, but the retrieved field does not state currency or VAT basis. The exact portal gives a submission cutoff of 20 October 2026 at 11:00 without a timezone; TED confirms the date but its returned field gives no clock. No detailed technical requirements or award criteria were available in the public notice fields retrieved.

Information based on the public notice

What the buyer needs

Construction works for the Andrijevci interchange on the A5 motorway; the public notice fields identify the project but do not provide technical detail.

Tender details

Buyer
Hrvatske autoceste d.o.o.
Country
Croatia
Procedure
Open procedure for works
Classification
45233100
Notice reference
672095-2026
Procurement control number
1-400-2026-486
Scope
Construction of the Andrijevci interchange on the A5 motorway
Estimated-value field
7,500,000.00; currency and VAT basis are not stated in the retrieved field
Submission cutoff
20 October 2026 at 11:00 on EOJN without a stated timezone; date-only cutoff used

What to check in the tender documents

  • The currency and VAT basis for the EOJN estimated-value figure are not stated in the retrieved field.
  • Detailed technical requirements, participation conditions, award criteria and contract duration were not available in the retrieved public notice fields.
  • The EOJN portal prints 11:00 without a timezone; TED confirms the calendar date but gives no clock. The unchanged available notice information separately records 19 October 2026 at 22:00 UTC.
Get started with Ziva

Original notice

Read the original description

Izgradnja Čvora Andrijevci, autocesta A5 Beli Manastir – Osijek – Svilaj

Izgradnja Čvora Andrijevci, autocesta A5 Beli Manastir– Osijek – Svilaj

Official source: Hrvatske autoceste and EOJN RH (Croatian Electronic Public Procurement Classifieds) ↗