Bielefeld light-rail tunnel track and switch renewal
Outcome
Submissions closed on 28 October 2026. No award has been published yet. Open tenders like this one are listed below.
- Place
- Stadtbahn tunnel between Bielefeld Hauptbahnhof and Sudbrackstraße, Bielefeld 33611
- Offer deadline
- 09:00 AM · UTC
- Contract value
- Not stated in the notice
- Lots
- 1 lot
- Contract period
- Execution begins in calendar week 29 of 2027; completion duration not stated in the notice.
- Published
- September 25, 2026
- Bielefelder Beteiligungs- und Vermögensverwaltungs GmbH (issuer notice via Subreport)
Overview
Bielefelder Beteiligungs- und Vermögensverwaltungs GmbH invites bids for staged renewal of switches and rails in the Bielefeld Stadtbahn tunnel. The work covers lines 1, 2 and 3 and their shared section, including two 49E1 switch assemblies, rails and actuators. There is one contract lot. Execution is scheduled to begin in calendar week 29 of 2027. Offers are due 28 October 2026 at 10:00 CET; German is the required offer language.
Information based on the public notice
Ask about this tender
What the buyer needs
Staged renewal of switches and rails in the Stadtbahn tunnel between the main station and Sudbrackstraße. The affected section includes lines 1, 2 and 3 and a shared section; two 49E1 switch assemblies, rails and actuators are included.
- Submit electronically in German via Subreport. A performance and defects-liability bond is required. The notice refers to a suitability declaration and the tender documents for detailed criteria. Alternative tenders are allowed.
Lots
Gleiserneuerung im Tunnel BA2 (single lot)
Tender details
- Buyer
- Bielefelder Beteiligungs- und Vermögensverwaltungs GmbH
- Country
Germany
- Procedure
- de-open
- Classification
- Railway works · CPV 43 · CPV 44 · CPV 45 · CPV 71
- Notice reference
- ocds-mnwr74-25862450
- Offer deadline
- 2026-10-28 10:00 CET (Bielefeld local time)
- Execution start
- 29th calendar week 2027
What to check in the tender documents
- The notice refers award criteria and further suitability details to separate procurement documents. The notice does not specify the total execution duration or contract value.
Original notice
Read the original description
Gleiserneuerung im Tunnel BA2
Official source: Bielefelder Beteiligungs- und Vermögensverwaltungs GmbH (issuer notice via Subreport) ↗
https://oeffentlichevergabe.de/ui/de/notices/25862450
Source retrieved: 2026-10-14T19:29:29Z