Seagrass planting for the Ostwind 3 offshore cable route
Outcome
Submissions closed on 5 November 2026. No award has been published yet. Open tenders like this one are listed below.
The 25 October 2026 notice states a request-to-participate deadline of 5 November 2026 at 18:00 CET and an estimated value of EUR 800,000. The deadline has passed.
- Buyer
- 50Hertz Offshore GmbH
- Place
- Ostwind 3 cable route between KP 18.1 and KP 18.4, Greifswald Bodden area, Germany
- Deadline for requests to participate: 5 November 2026 at 18:00 CET. The deadline has passed.
- 05:00 PM · UTC
- Contract value
- €800,000
- Lots
- 1 lot
- Contract period
- 1 April to 31 October 2027. Planting must start by 1 June and be complete by 31 July 2027.
- Published
- October 23, 2026
- German public procurement notice service
Overview
50Hertz Offshore GmbH requests a quotation for seagrass planting along the Ostwind 3 cable route between KP 18.1 and KP 18.4 in the Greifswald Bodden area of Germany. The stated corridor is 325 m long and 7 m wide, about 2,300 m², and the estimated value is EUR 800,000. The execution period is 1 April to 31 October 2027. Planting must start by 1 June and finish by 31 July 2027. Single shoots are preferred, and planted fabric ropes are also to be installed. The deadline for requests to participate was 5 November 2026 at 18:00 CET and has passed.
Information based on the public notice
Ask about this tender
What the buyer needs
Restore seagrass along the specified Ostwind 3 cable route corridor. The notice describes requirements for the substrate, permits, plant material, worksite marking and repeated underwater inspection. Single shoots are preferred, with planted fabric ropes also to be installed.
- Submit a commercial register extract and a declaration that no exclusion grounds under Sections 123 and 124 GWB apply to the applicant or, where relevant, an entity whose capacity is relied upon.
- Provide references from the previous five years covering the listed marine operations, diving, ROV or survey work, seabed installation and environmentally sensitive marine work. The notice permits the experience to be evidenced through one or more projects.
- Provide evidence of relevant experience for proposed key personnel, including project management, marine ecology, diving, ROV or vessel roles. Documented experience gained with previous employers or organizations may be considered.
- Provide valid ISO 9001:2015, ISO 45001:2018 and ISO 14001:2015 certificates or stated equivalents, including SCC where applicable.
- Staff communicating orally or in writing with the buyer must speak German at CEFR level C1 or higher.
- Declare total turnover and turnover in the relevant business area for 2023, 2024 and 2025.
- To express interest, contact the buyer by email and provide the requested company details and the names and contact details of people who need Ariba access.
- The stated maximum is one contract renewal.
- Lack of direct seagrass-restoration experience does not automatically disqualify an applicant where relevant marine capability, qualified personnel and suitable methods are demonstrated.
Lots
LOT-0000 ·Seagrass planting for the Ostwind 3 offshore cable route between KP 18.1 and KP 18.4
Tender details
- Buyer
- 50Hertz Offshore GmbH
- Country
Germany
- Procedure
- neg-w-call
- Classification
- Water, waste and environmental services · CPV 77310000
- Notice reference
- ocds-mnwr74-3a14c7e0-db43-45a3-8d7c-d5e358d8e7e3
- Lot
- One lot, Los 1
- Place of performance
- Ostwind 3 cable route between KP 18.1 and KP 18.4, Greifswald Bodden area, Germany
- Work area
- 325 m by 7 m, approximately 2,300 m²
- Estimated value
- EUR 800,000; the VAT basis is not stated
- Execution period
- 1 April to 31 October 2027
- Planting window
- Start no later than 1 June 2027 and complete by 31 July 2027
- Planting methods
- Single shoots are preferred; planted fabric ropes are also to be installed. Suitable ropes are supplied by an assigned manufacturer.
- Requests to participate
- 5 November 2026 at 18:00 CET; deadline has passed
- Award criteria
- Evaluation price 50%, contract 10%, concepts 40%; further details are referred to in an annex.
What to check in the tender documents
- The notice refers to an annex for further details of the award criteria; those details are not reproduced in the notice text.
- No award result is stated.
Original notice
Read the original description
Planting of Seagrass for Ostwind 3 Offshore project between KP18.1-18.4
Official source: German public procurement notice service ↗
Notice updates
November 6, 2026 · Version 2
Classification updated · Contract period updated · Deadline information updated · Summary and analysis updated · Tender facts updated · Original notice updated · Deadline updated · Location updated · Source updated · Source notice details updated · Source references updated · Status changed · Notice update added
Planting of Seagrass for Ostwind 3 Offshore project between KP18.1-18.4
The main target for this operation is the planting of seagrass, either as a single plant or/and as a rope consisting plants. Employer is requesting the Bidder to submit a quotation for the execution of seagrass planting works. The designated location for the seagrass planting is at Ostwind 3 cable route between KP18.1 – 18.4, which is a 325m long and 7m wide (about 2300m²) corridor. Seagrass planting will require the following pre-requisites and follow-ups: A consolidated coarse sediment layer of approx. 20 - 30 cm thickness (engineered material), An execution plan, prepared early enough to achieve the permit in time A permit by authorities (STALU VP, WSA Ostsee), Sufficient plant material seagrass shoots (subject to availability, see details below) to be suitable for planting a harbor nearby (either Thiessow (8km), Freest (11km) or Lubmin (15km)) shall be used for hand-over of seagrass shoots/geotextile ropes with seagrass from Third Party supplier In case it is required the work area per operational day shall be first marked by rods/subsurface buoys attached to small ground weights prior to planting to allow for correct planting spatially and regarding shoot density/m². In case of non-fins-diving solutions it can be done different. shifting of work site day by day shall be enabled by installation of a remote-controlled sub-surface marker buoy with release system on last position of executed work, respectively work executed on previous days shall be inspected by means of underwater video (ROV or UW-drone) repeatedly General assumptions about the task: Total impact area to be restored will be ~2.300m² Work can be executed by divers in accordance with the requirements of DGUV Regel 101-023. Alternatively work can be executed by ROV, if the Contractor can proof the suitability of the technology by references Seagrass planting shall start (latest) on 1st of June 2027 and has to be completed by 31st of July 2027. Employer considers two alternative planting methods: (1) planting of single shoots (2) Installation of rotable fabric ropes with incorporated shoots Suitable ropes ready for installation will be provided by an assigned manufacturer. Single shoot planting planting is the preferred procedure, but rope installation shall be implemented in parallel too. If you are interested in participating in the described procedure, please contact us by e-mail (andre.forbrig@50hertz.com) and express your interest in participating. With the expression of interest, we need the following information from you in order to be able to add you to the project in Ariba: - Full name of the company: - Address of the company: - V.A.T. Number: - Tax Number: - Commercial register number: In addition, I need the contact details of the people who you should have access to the Ariba system: - Name - E-mail address - Phone number --- Current official MAIN --- /notice_identifier: 1c446cb8-e83b-4a1a-9a61-a868bbf636f0 /original_notice_identifier: ff52fc1b-1d87-420e-9ddb-45218ccc77be /notice_version: 01 /publication_date: 2026-10-25T09:10:05.810294Z /change_date: 2026-10-25T09:10:05.810294Z /ted_publication/submittedAt: 2026-10-23T10:08:04.662594+02:00 /ted_publication/publicationDate: 2026-10-26+01:00 /ted_publication/publicationId: 741002-2026 /notice_type/value: cn-standard /notice_type/listName: competition /notice_subtype/value: 17 /notice_subtype/listName: notice-subtype /title: Planting of Seagrass for Ostwind 3 Offshore project between KP18.1-18.4 /original_description: The main target for this operation is the planting of seagrass, either as a single plant or/and as a rope consisting plants. Employer is requesting the Bidder to submit a quotation for the execution of seagrass planting works. The designated location for the seagrass planting is at Ostwind 3 cable route between KP18.1 – 18.4, which is a 325m long and 7m wide (about 2300m²) corridor. Seagrass planting will require the following pre-requisites and follow-ups: A consolidated coarse sediment layer of approx. 20 - 30 cm thickness (engineered material), An execution plan, prepared early enough to achieve the permit in time A permit by authorities (STALU VP, WSA Ostsee), Sufficient plant material seagrass shoots (subject to availability, see details below) to be suitable for planting a harbor nearby (either Thiessow (8km), Freest (11km) or Lubmin (15km)) shall be used for hand-over of seagrass shoots/geotextile ropes with seagrass from Third Party supplier In case it is required the work area per operational day shall be first marked by rods/subsurface buoys attached to small ground weights prior to planting to allow for correct planting spatially and regarding shoot density/m². In case of non-fins-diving solutions it can be done different. shifting of work site day by day shall be enabled by installation of a remote-controlled sub-surface marker buoy with release system on last position of executed work, respectively work executed on previous days shall be inspected by means of underwater video (ROV or UW-drone) repeatedly General assumptions about the task: Total impact area to be restored will be ~2.300m² Work can be executed by divers in accordance with the requirements of DGUV Regel 101-023. Alternatively work can be executed by ROV, if the Contractor can proof the suitability of the technology by references Seagrass planting shall start (latest) on 1st of June 2027 and has to be completed by 31st of July 2027. Employer considers two alternative planting methods: (1) planting of single shoots (2) Installation of rotable fabric ropes with incorporated shoots Suitable ropes ready for installation will be provided by an assigned manufacturer. Single shoot planting planting is the preferred procedure, but rope installation shall be implemented in parallel too. If you are interested in participating in the described procedure, please contact us by e-mail (andre.forbrig@50hertz.com) and express your interest in participating. With the expression of interest, we need the following information from you in order to be able to add you to the project in Ariba: - Full name of the company: - Address of the company: - V.A.T. Number: - Tax Number: - Commercial register number: In addition, I need the contact details of the people who you should have access to the Ariba system: - Name - E-mail address - Phone number /language: en /buyer/name: 50Hertz Offshore GmbH /buyer/role: buyer /contract_type: services /estimated_value/value: 800000 /estimated_value/currencyID: EUR /classification/mainClassificationCode/value: 77310000 /classification/mainClassificationCode/listName: cpv /classification/additionalClassificationCode: [] /place_of_performance/0/placePerformanceCountrySubdivision/value: DE80N /place_of_performance/0/placePerformanceCountrySubdivision/listName: nuts-lvl3 /place_of_performance/0/placePerformanceCountryCode/value: DEU /place_of_performance/0/placePerformanceCountryCode/listName: country /place_of_performance/0/placePerformanceAdditionalInformation: Boddenzone KP18.1 - KP18.4. (Greifswald) /lot/id: LOT-0000 /lot/title: Planting of Seagrass for Ostwind 3 Offshore project between KP18.1-18.4 /lot/internal_identifier: Los 1 /lot/estimated_value/value: 800000 /lot/estimated_value/currencyID: EUR /lot/duration/durationStartDate: 2027-04-01+02:00 /lot/duration/durationEndDate: 2027-10-31+02:00 /lot/duration/renewalMaximum: 1 /submission_deadline: 2026-11-05T18:00:00+01:00 /additional_information_deadline: 2026-10-25T12:00:00+01:00 /submission_platform: https://www.ariba.com /award_criteria/awardCriteriaComplicated: Die Zuschlagskriterien setzen sich wie folgt zusammen: 50% - "Wertungspreis" 10% - "Vertrag" 40% - "Konzepte" Weitere Details können der Anlage "ACO-ENV-SGP-Zuschlagskriterien" entnommen werden. /selection_criteria/0/selectionCriteriaType/value: slc-suit-reg-trade /selection_criteria/0/selectionCriteriaType/listName: selection-criterion /selection_criteria/0/selectionCriteriaDescription: Übermittlung eines Auszugs aus dem Handelsregister /selection_criteria/1/selectionCriteriaType/value: slc-stand-other /selection_criteria/1/selectionCriteriaType/listName: selection-criterion /selection_criteria/1/selectionCriteriaDescription: Hiermit erklären wir, dass auf unser Unternehmen und im Falle der Eignungsleihe bei dem leihenden Unternehmen keine Ausschlussgründe gemäß §§ 123, 124 GWB bestehen. /selection_criteria/2/selectionCriteriaType/value: slc-abil-ref-work /selection_criteria/2/selectionCriteriaType/listName: selection-criterion /selection_criteria/2/selectionCriteriaDescription: Auslieferung des ordnungsgemäß ausgefüllten Formulars "Technical and Professional Capability (References)". Der Bieter ist nicht verpflichtet, alle Qualifikationsanforderungen innerhalb eines einzelnen Referenzprojekts nachzuweisen. Die erforderliche Erfahrung kann durch ein oder mehrere Referenzprojekte nachgewiesen werden, vorausgesetzt, der Gesamtsatz der Referenzen zeigt die Fähigkeit des Bieters, die Arbeiten durchzuführen. Marineoperationen Nachweis der folgenden Erfahrung durch ein oder mehrere Referenzprojekte, die in den letzten fünf (5) Jahren abgeschlossen wurden und eine oder mehrere der folgenden Dienstleistungen umfassen: Marinearbeiten in Küsten- und/oder Offshore-Gewässern Tauch-, ROV- und/oder Vermessungsoperationen Installationsarbeiten am Meeresboden Durchführung von Arbeiten in umweltbewussten Meeresumgebungen Tauchdienste Nachweis der folgenden Erfahrung durch ein oder mehrere Referenzprojekte, die in den letzten fünf (5) Jahren abgeschlossen wurden und eine oder mehrere der folgenden Dienstleistungen umfassen: Kommerzielle Taucharbeiten in Meeresumgebungen Tauchoperationen, die gemäß anerkannten Tauchstandards (z. B. DGUV oder gleichwertig) durchgeführt werden Tauchmanagement und Aufsicht Schiffsbetrieb Nachweis der folgenden Erfahrung durch ein oder mehrere Referenzprojekte, die in den letzten fünf (5) Jahren abgeschlossen wurden und eine oder mehrere der folgenden Dienstleistungen umfassen: Bereitstellung und Betrieb geeigneter Arbeitsschiffe Durchführung von Arbeiten in flachen Küstengewässern Mobilisierung und Positionierung von Schiffen und Ausrüstung während maritimer Operationen Umwelt- und ökologische Maßnahmen Nachweis von Erfahrung in Umwelt-, ökologischen und/oder Lebensraumwiederherstellungsprojekten durch ein oder mehrere Referenzprojekte, die in den letzten fünf (5) Jahren abgeschlossen wurden. Relevante Projekte können unter anderem Folgendes umfassen: Wiederherstellung oder Umpflanzung von Seegras Lebensraumwiederherstellungsmaßnahmen Muschelriff oder Riffrestaurierung Natura-2000-Entschädigungsmaßnahmen Wissenschaftliche, Pilot- oder Demonstrationsprojekte im Bereich der Meeresökologie Das Fehlen direkter Erfahrung in der Renaturierung von Seegras disqualifiziert einen Bieter nicht automatisch, vorausgesetzt, der Bieter zeigt relevante marine operative Fähigkeiten und verfügt über ausreichend qualifiziertes Personal sowie Methoden zur Durchführung der Arbeiten. Qualifiziertes Personal Demonstration der folgenden Erfahrungen durch die vorgeschlagenen Schlüsselpersonen, die in den letzten fünf (5) Jahren an vergleichbaren Projekten teilgenommen haben: Projektleiter (Meeresoperationen und/oder Meeresökologie) Meeresökologe und/oder Meeresbiologe Manager für Tauchbetrieb ROV-Spezialist und/oder Schiffskapitän Die Erfahrung des vorgeschlagenen Schlüsselpersonals kann zusätzlich zu den Unternehmensreferenzprojekten berücksichtigt werden. Die von Schlüsselpersonen während ihrer Anstellung bei früheren Arbeitgebern oder Organisationen gesammelten Erfahrungen können anerkannt werden, sofern ihre Beteiligung am jeweiligen Referenzprojekt ausreichend dokumentiert wird. /selection_criteria/3/selectionCriteriaType/value: slc-sche-qu-cert-indep /selection_criteria/3/selectionCriteriaType/listName: selection-criterion /selection_criteria/3/selectionCriteriaDescription: Nachweis über den Besitz einer gültigen ISO 9001:2015-Zertifizierung oder gleichwertig /selection_criteria/4/selectionCriteriaType/value: slc-abil-staff-qual /selection_criteria/4/selectionCriteriaType/listName: selection-criterion /selection_criteria/4/selectionCriteriaDescription: Das für die Auftragsausführung relevante Personal, das in mündlichen oder schriftlichen Kontakt zum Auftraggeber tritt, beherrscht die deutsche Sprache mindestens auf der Niveaustufe C1 des Gemeinsamen Europäischen Referenzrahmens für Sprache. /selection_criteria/5/selectionCriteriaType/value: slc-stand-to-spec /selection_criteria/5/selectionCriteriaType/listName: selection-criterion /selection_criteria/5/selectionCriteriaDescription: Es ist eine Erklärung über den Gesamtumsatz sowie den Umsatz in dem Tätigkeitsbereich des hier zu vergebenden Auftrags für die Jahre 2023, 2024 und 2025 abzugeben /selection_criteria/6/selectionCriteriaType/value: slc-sche-qu-cert-indep /selection_criteria/6/selectionCriteriaType/listName: selection-criterion /selection_criteria/6/selectionCriteriaDescription: Nachweis über den Besitz einer gültigen ISO 45001:2018-Zertifizierung oder gleichwertig (wie SCC) /selection_criteria/7/selectionCriteriaType/value: slc-sche-env-cert-indep /selection_criteria/7/selectionCriteriaType/listName: selection-criterion /selection_criteria/7/selectionCriteriaDescription: Nachweis über den Besitz einer gültigen ISO 14001:2015-Zertifizierung oder gleichwertig /additional_information/0/value: In compliance with the principles of transparency and equal treatment, the Client may request applicants to submit missing company-related documents, in particular self-declarations, information, certificates or other evidence. Applicants are not entitled to a subsequent request for documents. /additional_information/0/languageId: DEU /additional_information/1/value: In compliance with the principles of transparency and equal treatment, the Client may request applicants to submit missing company-related documents, in particular self-declarations, information, certificates or other evidence. Applicants are not entitled to a subsequent request for documents. /additional_information/1/languageId: ENG
October 14, 2026 · Version 1
Published
Planting of Seagrass for Ostwind 3 Offshore project between KP18.1-18.4
The main target for this operation is the planting of seagrass, either as a single plant or/and as a rope consisting plants. Employer is requesting the Bidder to submit a quotation for the execution of seagrass planting works. The designated location for the seagrass planting is at Ostwind 3 cable route between KP18.1 – 18.4, which is a 325m long and 7m wide (about 2300m²) corridor. Seagrass planting will require the following pre-requisites and follow-ups: A consolidated coarse sediment layer of approx. 20 - 30 cm thickness (engineered material), An execution plan, prepared early enough to achieve the permit in time A permit by authorities (STALU VP, WSA Ostsee), Sufficient plant material seagrass shoots (subject to availability, see details below) to be suitable for planting a harbor nearby (either Thiessow (8km), Freest (11km) or Lubmin (15km)) shall be used for hand-over of seagrass shoots/geotextile ropes with seagrass from Third Party supplier In case it is required the work area per operational day shall be first marked by rods/subsurface buoys attached to small ground weights prior to planting to allow for correct planting spatially and regarding shoot density/m². In case of non-fins-diving solutions it can be done different. shifting of work site day by day shall be enabled by installation of a remote-controlled sub-surface marker buoy with release system on last position of executed work, respectively work executed on previous days shall be inspected by means of underwater video (ROV or UW-drone) repeatedly General assumptions about the task: Total impact area to be restored will be ~2.300m² Work can be executed by divers in accordance with the requirements of DGUV Regel 101-023. Alternatively work can be executed by ROV, if the Contractor can proof the suitability of the technology by references Seagrass planting shall start (latest) on 1st of June 2027 and has to be completed by 31st of July 2027. Employer considers two alternative planting methods: (1) planting of single shoots (2) Installation of rotable fabric ropes with incorporated shoots Suitable ropes ready for installation will be provided by an assigned manufacturer. Single shoot planting planting is the preferred procedure, but rope installation shall be implemented in parallel too. If you are interested in participating in the described procedure, please contact us by e-mail (andre.forbrig@50hertz.com) and express your interest in participating. With the expression of interest, we need the following information from you in order to be able to add you to the project in Ariba: - Full name of the company: - Address of the company: - V.A.T. Number: - Tax Number: - Commercial register number: In addition, I need the contact details of the people who you should have access to the Ariba system: - Name - E-mail address - Phone number
https://oeffentlichevergabe.de/ui/de/notices/1c446cb8-e83b-4a1a-9a61-a868bbf636f0
Source retrieved: 2026-11-04T04:41:35.873135Z