Design and construction of DK60 sections and the Łąck bypass near Gostynin–Płock
Outcome
Submissions closed on 28 October 2026. No award has been published yet. Open tenders like this one are listed below.
- Place
- Gostynin–Płock and Łąck, Poland (Płock County)
- Deadline for receipt of tenders
- 10:30 AM · UTC
- Contract value
- Not stated in the notice
- Lots
- 1 lot
- Contract period
- 36 months
- Published
- October 8, 2026
- Tenders Electronic Daily (TED), Publications Office of the European Union
Overview
Poland’s General Directorate for National Roads and Motorways invites an open procedure for one formal lot covering two road sections: design and construction/reconstruction of DK60 near Gostynin–Płock at the stated kilometre ranges, plus design and construction of the Łąck bypass. Associated works include access roads, pedestrian/cycle infrastructure, bridges, drainage, environmental measures, utility relocations, lighting and traffic systems. The notice gives only a value threshold above EUR 20 million, not an exact estimated amount. The works period is 36 months. Award weights are price 55% and three quality criteria totalling 45%. Electronic Polish bids and PLN 1.2 million bid security are required. A change notice moved the deadline from 16 to 28 October 2026; TED now states 11:30 UTC+01, conflicting with the leased snapshot cutoff of 27 October 23:00 UTC.
Information based on the public notice
Ask about this tender
What the buyer needs
Design and construction of a single-carriageway G-class road on two separated DK60 sections near Gostynin–Płock (approximately km 52+357–55+737 and km 59+011–61+900) and design/build of the Łąck bypass between approximately km 55+737 and 59+011. Associated works include local/access roads, walking and cycling infrastructure, engineering structures, drainage/retention, environmental protection, utility relocations, lighting, traffic systems, ground strengthening, restoration and completion documentation.
- Average annual revenue of at least PLN 40m over the last three financial years and funds or credit capacity of at least PLN 10m.
- Recent completed experience with a G-class single-carriageway road project of at least PLN 60m net and the specified A/I bridge works, including length/span requirements; a single project may meet several bridge conditions.
- One construction manager with at least 12 months of the stated relevant project experience. Provide financial statements or equivalent, a bank/credit-union letter, work references/completion evidence and a personnel list.
- Electronic submission in Polish; PLN 1.2m bid security; variants and electronic catalogues are not allowed.
Lots
LOT-0001 ·Projekt, budowa i przebudowa drogi krajowej nr 60 na odcinku Gostynin-Płock w podziale na dwa odcinki: Odcinek 1. Projekt, budowa i przebudowa drogi krajowej nr 60 na odcinku Gostynin-Płock od km ok. 52+357 do km ok. 55+737 oraz od km ok. 59+011 do km ok. 61+900; Odcinek 2. Projekt i budowa obwodnicy Łącka.
Tender details
- Buyer
- Generalna Dyrekcja Dróg Krajowych i Autostrad
- Country
Poland
- Procedure
- open
- Classification
- CPV 45000000 · CPV 45233000 · CPV 45200000 · CPV 45220000 · CPV 45221120 · CPV 45221121 · CPV 45231000 · CPV 45100000 · CPV 45232000 · CPV 45233100 · CPV 45233140 · CPV 45314000 · CPV 45316000 · CPV 45316210 · CPV 71240000 · CPV 71220000 · CPV 71320000 · CPV 71322000 · CPV 77300000 · CPV 71330000 · CPV 71420000 · CPV 31527260 · CPV 34922100 · CPV 44423400 · CPV 32570000
- Notice reference
- 698564-2026
- Buyer and procedure
- Generalna Dyrekcja Dróg Krajowych i Autostrad; open procedure; TED notice 698564-2026; internal reference OWA.D-3.2411.23.2026.
- Scope and formal lot
- One formal lot LOT-0001 covering DK60 sections at approx. km 52+357–55+737 and 59+011–61+900 plus the Łąck bypass, km approx. 55+737–59+011.
- Estimated value
- Notice states only that estimated value exceeds EUR 20,000,000; no exact amount is given.
- Eligibility: financial capacity
- Average annual revenue at least PLN 40,000,000 over the last three financial years; funds or credit capacity at least PLN 10,000,000.
- Eligibility: experience
- Within the last 10 years: completed G-class single-carriageway road works of at least PLN 60m net, plus specified class A/I bridge experience including a bridge at least 50m long and one with a theoretical span at least 50m.
- Award criteria
- Price 55%; extended quality guarantee for acoustic screens/power installations/support structures 20%; extended guarantee for bridges and specified components 20%; use of recovered asphalt planings on the site 5%.
- Submission and security
- Electronic offers in Polish; electronic catalogues and variants prohibited; PLN 1,200,000 bid security; offer validity 120 days.
- Current deadline and amendment
- Amended TED notice: 28 October 2026 11:30 UTC+01 (10:30 UTC); opening at 12:00 UTC+01. Change notice says cutoff moved from 16 to 28 October. Leased available notice information states 27 October 2026 23:00 UTC, which conflicts.
What to check in the tender documents
- No exact estimated contract value or price schedule is stated; only a threshold above EUR 20m.
- The amended notice’s 28 October 11:30 UTC+01 cutoff conflicts with the leased snapshot timestamp. Confirm the controlling time in the buyer platform.
- Detailed technical design requirements and contract conditions are in the procurement specification, which was not accessed.
Original notice
Read the original description
Projekt, budowa i przebudowa drogi krajowej nr 60 na odcinku Gostynin-Płock w podziale na dwa odcinki: Odcinek 1. Projekt, budowa i przebudowa drogi krajowej nr 60 na odcinku Gostynin-Płock od km ok. 52+357 do km ok. 55+737 oraz od km ok. 59+011 do km ok. 61+900; Odcinek 2. Projekt i budowa obwodnicy Łącka.
Official source: Tenders Electronic Daily (TED), Publications Office of the European Union ↗