Earthwork and trenching for the airport substation upgrade
Outcome
Submissions closed on 14 October 2026. No award has been published yet. Open tenders like this one are listed below.
- Place
- San Francisco, California, United States
- RFQ application deadline
- Time not stated
- Contract value
- $600,000
- Lots
- 1 lot
- Classification
- Earthwork and trenching
- Published
- September 24, 2026
- San Francisco Airport / OpenGov
Overview
San Francisco Airport listed trade package TP 08 for earthwork and trenching within its Airport Substation Transformer Upgrade Project. The work includes excavation, backfill and subgrade preparation, shoring for below-grade structures, and installation of precast trenches, conduit and vaults near existing structures. The airport must remain operational throughout construction, which is to be phased around airport utilities and a protected San Francisco garter snake habitat. The stated estimated cost is USD 600,000. The RFQ application deadline was 14 October 2026 at 3:00 PM; the notice does not state a timezone. The public project page returned HTTP 403 during this review.
Information based on the public notice
Ask about this tender
What the buyer needs
Earthwork and trenching trade package TP 08: excavation, backfill, subgrade preparation and shoring; precast trenches, conduit and vaults adjacent to existing structures. Work must be phased to keep the airport operating and protect utilities and a sensitive habitat.
- The notice directs trade-package bidders to Webcor’s prequalification requirements. The design-builder information link is provided in the notice but was inaccessible during this review.
Lots
TP-08 ·Earthwork/trenching
Tender details
- Buyer
- San Francisco Airport (Construction)
- Country
United States
- Procedure
- Trade Package Advertisement
- Classification
- Earthwork and trenching
- Notice reference
- 307216
- Estimated trade-package cost
- USD 600,000
- RFQ application deadline
- 14 October 2026, 3:00 PM (timezone not stated)
What to check in the tender documents
- The official project page could not be read in this review (HTTP 403). Detailed prequalification criteria, bid documents, contract terms and final award are not established by the available public notice text.
- The deadline clock time is stated but no timezone is provided.
Original notice
Read the original description
Trade Package - Airport Substation Transformer Upgrade Project - TP 08 - Earthwork/Trenching
Official source: San Francisco Airport / OpenGov ↗
Notice updates
October 16, 2026 · Version 2
Buyer updated · Classification updated · Deadline information updated · Summary and analysis updated · Tender facts updated · Original notice updated · Deadline updated · Location updated · Source updated · Source notice details updated · Source references updated · Status changed
Trade Package - Airport Substation Transformer Upgrade Project - TP 08 - Earthwork/Trenching
Design-Builder Firm Name: Webcor Project Overview: The Airport Substation Transformer Upgrade Project (Project) will replace the two existing Airport Substation transformers with three new 55-MVA transformers (one will serve as a backup), the existing switchgear equipment, and other supporting electrical systems. This contract will increase capacity and improve power supply reliability and redundancy for power supply scenarios outside of normal perations. The Project is one of the two substations that provides power to the Airport, which is a campus operational twenty-four (24) hours a day throughout the year. The Airport shall remain operational at all times during the project's implementation. The Project is also located on the West of Bayshore (WOB) property owned by the Airport. The WOB property contains major utilities, water pump stations, and a biologically sensitive habitat that supports endangered species. The Airport is implementing a long-term Recovery Action Plan for the San Francisco garter snake. Services will need to be implemented in phases, and all the requirements to ensure no disruption to Airport Operations and avoid and minimize impacts to the WOB San Francisco Garter Snake Recovery Action Plan during construction should be applied. Trade Package No.: TP-08 Trade Package Title: Earthwork/trenching Description of the Trade Package Scope of Work: Excavation, backfill and subgrade preparation including shoring for below grade structures, precast trench and conduit. Scope includes furnishing and installation of below grade precast vaults adjacent to existing structures. Trade Package Bid Due Date and Time: RFQ APPLICATION DEADLINE Wednesday October 14, 2026, at 3:00 PM Main Trades of the Trade Package: Earthwork/trenching Estimated Cost: $600k CMD LBE Participation Requirement: 100% Design-Builder requirements or prequalification criteria: Please see Webcor prequalification requirements in the Design Builder Weblink below. Contact for Trade Package information: Leila Lilazi; Email: llilazi@webcor.com Design-Builder web link to the Trade Package or more information: https://app.buildingconnected.com/opportunities/6ab5dc88c1d44533bb98a39b/info
October 14, 2026 · Version 1
Published
Trade Package - Airport Substation Transformer Upgrade Project - TP 08 - Earthwork/Trenching
Design-Builder Firm Name: Webcor Project Overview: The Airport Substation Transformer Upgrade Project (Project) will replace the two existing Airport Substation transformers with three new 55-MVA transformers (one will serve as a backup), the existing switchgear equipment, and other supporting electrical systems. This contract will increase capacity and improve power supply reliability and redundancy for power supply scenarios outside of normal perations. The Project is one of the two substations that provides power to the Airport, which is a campus operational twenty-four (24) hours a day throughout the year. The Airport shall remain operational at all times during the project's implementation. The Project is also located on the West of Bayshore (WOB) property owned by the Airport. The WOB property contains major utilities, water pump stations, and a biologically sensitive habitat that supports endangered species. The Airport is implementing a long-term Recovery Action Plan for the San Francisco garter snake. Services will need to be implemented in phases, and all the requirements to ensure no disruption to Airport Operations and avoid and minimize impacts to the WOB San Francisco Garter Snake Recovery Action Plan during construction should be applied. Trade Package No.: TP-08 Trade Package Title: Earthwork/trenching Description of the Trade Package Scope of Work: Excavation, backfill and subgrade preparation including shoring for below grade structures, precast trench and conduit. Scope includes furnishing and installation of below grade precast vaults adjacent to existing structures. Trade Package Bid Due Date and Time: RFQ APPLICATION DEADLINE Wednesday October 14, 2026, at 3:00 PM Main Trades of the Trade Package: Earthwork/trenching Estimated Cost: $600k CMD LBE Participation Requirement: 100% Design-Builder requirements or prequalification criteria: Please see Webcor prequalification requirements in the Design Builder Weblink below. Design-Builder web link to the Trade Package or more information: https://app.buildingconnected.com/opportunities/6ab5dc88c1d44533bb98a39b/info
https://procurement.opengov.com/portal/sfoconstruction/projects/307216
Source retrieved: 2026-10-16T08:23:28.158020Z