Yamaçtepe drinking-water network and transmission line construction

Outcome

Submissions closed on 20 November 2026. No award has been published yet. Open tenders like this one are listed below.

Place
Gaziantep, Türkiye
20 November 2026 at 14:00 TRT
12:00 PM · UTC
Contract value
Not stated in the notice
Lots
1 lot
Contract period
24 months
Published
October 6, 2026
TED Tenders Electronic Daily

Overview

Open works contract for a drinking-water network and transmission line in Gaziantep, including approximately 132 km of pipelines, three 15,000 m³ reservoirs, and SCADA/automation work.

Information based on the public notice

What the buyer needs

Construction of the Yamaçtepe drinking-water network and transmission line. The official notice describes approximately 132 km of 150, 200, 250, 300, 400, 600 and 800 mm pipelines, three reservoirs of 15,000 m³ each, and SCADA and automation work.

  • Within the last ten years, either one successfully completed similar contract valued at least EUR 15,000,000, or two similar contracts with a combined value of at least EUR 22,500,000.
  • Average annual turnover in construction works over financial years 2021–2025 of at least EUR 10,000,000 or equivalent.
  • At least one similar contract with 90 km of qualifying water/wastewater network of minimum 100 mm diameter, or two contracts totalling 135 km of such network.
  • Electronic submission is not allowed according to the TED field.

Lots

1 ·Construction of Yamaçtepe Drinking Water Network and Transmission Line

Tender details

Buyer
Gaziantep Metropolitan Municipality
Country
Türkiye
Procedure
open
Classification
Water infrastructure · CPV 45231300
Notice reference
689907-2026
Scope
One lot; about 132 km of 150–800 mm pipelines, three reservoirs of 15,000 m³ each, and SCADA/automation
Duration
24 months
Qualification threshold
One similar contract of at least EUR 15 million, or two totalling at least EUR 22.5 million; construction turnover average of at least EUR 10 million
Submission channel
TED states electronic submission is not allowed
Submission deadline
20 November 2026 at 14:00 TRT

What to check in the tender documents

  • No estimated procurement value was returned in the official TED fields. The PDF export returned HTTP 429 with zero bytes. The detailed Works Requirements referred to in the notice were not opened.
Get started with Ziva

Original notice

Read the original description

Construction of Yamaçtepe Drinking Water Network and Transmission Line

Construction of Yamaçtepe Drinking Water Network and Transmission Line Gaziantep Metropolitan Municipality This contract will include: 1 lot of construction of drinking water network and transmission line The works covered under this contract is the Construction of Yamaçtepe Drinking Water Network and Transmission Line, the scope of Works as follows: • Construction of approximately 132 km long drinking water network and transmission lines composed of 150, 200, 250, 300, 400, 600, 800 mm pipelines, • Construction of 3 water reservoirs with 15,000 m3 volume each, • SCADA and automation work. Participation as contractor, management contractor, a joint venture member or subcontractor, within the last ten (10) years (between 1st January 2016 and bid submission deadline) in - at least one (1) contract, with a value of at least fifteen million (15,000,000) Euro, or - two (2) contracts with a total value of at least twenty two million five hundred thousand (22,500,000) Euro. that have been successfully and substantially completed and that are similar to the proposed Works. The similarity shall be based on the physical size, complexity, methods/technology or other characteristics as described in Section VI, Work’s Requirements. The average of annual turnovers in construction works over the past five (5) financial years (2021-2025) shall be a minimum of 10 million (10,000,000) Euro or equivalent. Annual turnovers shall be verified by the documents certified by Certified (Sworn-in) Public Accountant or Tax Authority. For the above or other contracts executed during the period stipulated above, a minimum experience in the following key activities: - complete construction, installation and delivery of a minimum 90 km drinking water transmission main/water distribution network/wastewater collector/wastewater collection network/stormwater network with a minimum diameter of 100 mm under one single contract, or, - complete construction, installation and delivery of a minimum total of 135 km drinking water transmission main/water distribution network/wastewater collector/wastewater collection network/stormwater network with a minimum diameter of 100 mm under two contracts.

Official source: TED Tenders Electronic Daily ↗