A14 motorway, early bridge BW 102Ü construction, section L9 at km 4+100

Outcome

Submissions closed on 3 November 2026. No award has been published yet. Open tenders like this one are listed below.

Place
A14 motorway, L9 section, Germany
Offer deadline: 3 November 2026, 09:00 German time (UTC+01:00).
08:00 AM · UTC
Contract value
Not stated in the notice
Lots
1 lot
Contract period
18 months
Published
September 28, 2026
Official eForms public procurement notice

Overview

DEGES is procuring construction of bridge BW 102Ü on the A14, including execution planning. The single works lot covers a 41.5 m steel-composite bridge over the A14, shallow foundations, about 3,500 m³ of topsoil work, 58,000 m³ of earthworks (including about 54,000 m³ of soil supply), 13,000 m² of traffic surfaces and 83 tonnes of steelwork. The contract is expected to last 18 months. Lowest price is the sole award criterion; offers are due 3 November 2026 at 09:00 German time (08:00 UTC).

Information based on the public notice

What the buyer needs

  • Qualification evidence includes proof that exclusion grounds under §§ 123–124 GWB do not apply and, where relevant, evidence of self-cleaning under § 125 GWB. Offers are electronic and in German; variants and multiple main bids are not permitted.

Lots

LOT-0000 ·Bridge BW 102Ü over the A14

Tender details

Buyer
DEGES Deutsche Einheit Fernstraßenplanungs- und -bau GmbH
Country
Germany
Procedure
Open procedure under VOB/A EU
Classification
Bridge construction · 45221111 · 45233221 · 45233290 · 45233124
Notice reference
ocds-mnwr74-a079b575-a1b1-4f24-ae2f-fff63a32ab5e
Contract type
Works
Deadline
Offer deadline: 3 November 2026, 09:00 German time (UTC+01:00).
Contract period
18 months

What to check in the tender documents

  • The notice does not state an estimated value.
Get started with Ziva

Original notice

Read the original description

A14, Los 2.3.1 vorgez. BW 102Ü L9 Strecke km 4+100

A14, Los 2.3.1 vorgez. BW 102Ü L9 Strecke km 4+100 A14, Los 2.3.1 vorgez. BW 102Ü L9 Strecke km 4+100 Brücke BW 102Ü Neubau der Brücke (einschließlich der Erstellung der Ausführungsplanung) Ü-Bauwerk: Stahlverbundträger über die A14 mit folgenden Abmessungen: Stützweite: 41,5 m Breite zw. Geländern: 10,6 m Gründung: Flachgründung Mit folgenden Hauptmassen: Ca. 3.500 m³ Oberbodenarbeiten ca. 58.000 m³ Erdarbeiten davon ca. 54.000 m³ Bodenlieferung ca. 13.000 m² Verkehrsflächen ca. 83 t Stahlkonstruktion