Lot 2 dismantling, site installation and masonry for Buildings 200–201 envelope renovation (DO-35426/SCE)

CERNSwitzerlandUpcoming
Buyer
CERN
Place
Switzerland
Submission deadline
Not available
Contract value
Not stated in the notice
Classification
Construction and civil works
Published
October 11, 2026
CERN Procurement — forthcoming needs

Overview

CERN plans Lot 2 works for the envelope renovation of Buildings 200–201 at the Swiss Meyrin site. Scope includes dismantling non-contaminated materials, site fencing and facilities, non-contaminated waste disposal, and concrete-wall carbonation treatment. Works are expected to finish by October 2027. Firms should have building-renovation, dismantling, masonry and concrete-repair experience, including carbonation treatment. Estimated cost is CHF 200,000–400,000; a price enquiry is forecast for November 2026. No submission deadline is stated.

Information based on the public notice

What the buyer needs

Planned dismantling, site installation and masonry/concrete works for the renovation of the Buildings 200–201 envelope.

  • Proven experience in building renovation, dismantling, masonry and concrete repair, including concrete-carbonation treatment.

Tender details

Buyer
CERN
Country
Switzerland
Procedure
Price Enquiry
Classification
Construction and civil works · CERN-PROCUREMENT-CODE 01020101
Notice reference
DO-35426/SCE
Estimated cost range
CHF 200,000–400,000
Expected works completion
October 2027
Next procedure stage (estimated)
Price enquiry, November 2026

What to check in the tender documents

  • No submission deadline or detailed price-enquiry documents are stated.
Get started with Ziva

Original notice

Read the original description

Provision of Lot 2 -Dismantling, Site Installation, and Masonry Works for Renovation of the Building Envelope of Buildings 200-201 on the Swiss part of CERN's Meyrin site.

CERN intends to place a contract for provision of Lot 2 - dismantling, site installation, and masonry works for renovation of the building envelope of Buildings 200-201 on the Swiss part of CERN's Meyrin site, including dismantling (non-contaminated materials), installation of site fencing, site facilities, non-contaminated waste disposal, treatment of carbonation in concrete walls. The works are expected to be completed by October 2027. Interested firms shall have a proven experience and competence in building renovation, dismantling, masonry and concrete repair works, including the treatment of concrete carbonation. Estimated cost range: 200k - 400k CHF Procedure stage: Announcement; next step (estimated): Price Enquiry 11/2026

Official source: CERN Procurement — forthcoming needs ↗