Plastering work for the Eselriet school extension

Outcome

Submissions closed on 28 October 2026. No award has been published yet. Open tenders like this one are listed below.

Place
Effretikon, canton of Zurich
2026-10-28 at 14:00:00 (UTC+01:00)
01:00 PM · UTC
Contract value
Not stated in the notice
Contract period
2027-07-01–2028-01-31
Published
September 17, 2026
SIMAP

Overview

The Eselriet school complex in Effretikon is being expanded with a new building connected to the existing sports hall. The official overview describes classrooms, day care, sports-club accommodation and circulation, while the tender title identifies the procurement as cost group 271 plastering work. German-language offers are due 28 October 2026 at 14:00 (UTC+01:00); variants, consortium bids and subcontractors are allowed, while partial offers are not. Execution is scheduled from 1 July 2027 to 31 January 2028. Detailed plastering scope is in the tender documents.

Information based on the public notice

What the buyer needs

Plastering work (cost group 271) for an extension to the Eselriet school complex in Effretikon. The published overview describes the school extension; detailed plastering quantities and specifications are in tender documents not accessed.

  • Offers in German. Variants, consortia and subcontractors are allowed; partial offers are not.

Tender details

Buyer
City of Illnau-Effretikon, Building Construction Department
Country
Switzerland
Procedure
Open procedure
Classification
Plastering work · 45210000 - Building construction work
Notice reference
44407 · 44407-01
Scope
Plastering work (cost group 271) for an extension to the Eselriet school complex in Effretikon. The published overview describes the school extension; detailed plastering quantities and specifications are in tender documents not accessed.
Tender deadline
2026-10-28 at 14:00:00 (UTC+01:00)
Contract/execution period
2027-07-01-2028-01-31

What to check in the tender documents

  • Detailed technical specifications and award criteria are in tender documents, which were not accessed.
Get started with Ziva

Original notice

Read the original description

Extension of the Eselriet School Facility, Cost Group 271 Plastering Works

Title Extension of the Eselriet School Facility, Cost Group 271 Plastering Works Description The Eselriet school complex is located on the southwestern edge of the settlement area of Effretikon, where the built environment transitions into the surrounding landscape, characterized by forested slopes and agricultural land. The building ensemble, constructed in 1974, features a cohesive architectural design typical of its era. Oriented towards the south and defined by a precise building outline, it integrates harmoniously into its natural setting. Functionally differentiated building wings are arranged around a central schoolyard, forming a unified overall composition. The project involves the extension of the school complex through the construction of a compact new building directly attached to the existing sports hall. The existing structures and the extension will be combined into a coherent and integrated facility. A generous and clearly organized entrance area will be created from Sportplatzstrasse. The new building accommodates the extensive spatial requirements of the school, the day-care facilities, and the local sports clubs under one roof. The access and vertical circulation system enables both interconnected use and independent operation by the various user groups. Two separate entrances open the building and clearly separate the different functions. A main staircase and elevator provide access to all floors and connect all parts of the building. The second and third floors share a consistent floor plan layout. On the second floor, four classrooms and the intermediate group rooms form a learning cluster around a central common area and cloakroom zone. The third floor accommodates therapy and speech therapy facilities, as well as the rooms of the educational support center. The basement houses a multi-purpose room with direct access to the sports hall. A staircase and elevator connect this room to the kitchen and the communal spaces on the ground floor. Publication date 2026-09-18 Offer deadline 2026-10-28T14:00:00+01:00 CPV classification 45210000 — Building construction work Contract/execution period 2027-07-01–2028-01-31 Offer languages de Variants yes Partial offers no Consortium bids yes Subcontractors yes [CURRENT OFFICIAL SIMAP DESCRIPTION DE] Die Schulanlage Eselriet befindet sich am südwestlichen Siedlungsrand von Effretikon beim Übergang zum Landschaftsraum mit seitlichen Waldflanken und Agrarflächen. Das Gebäudeensemble aus dem Jahre 1974 prägt eine einheitliche, zeittypische Gestaltung. Übereck nach Süden ausgerichtet schreibt es sich mit einer präzisen Umrisslinie in den naturnahen Kontext ein. Funktional differenzierte Gebäudetrakte gruppieren sich um den mittigen Pausenplatz zu einer Gesamtform. Das Bauprojekt beabsichtigt die bauliche Erweiterung der Schulanlage mit einem kompakten, direkt an die Turnhalle angebauten Neubau. Bestand und Neubau werden zu einer schlüssigen Anlage zusammengefügt. Von der Sportplatzstrasse her entsteht eine breite und übersichtliche Zugangssituation. Der Neubau vereint das umfangreiche Raumprogramm mit den Räumen für den Schulbetrieb, die Tagesbetreuung und die Sportvereine unter einem Dach. Das Zugangs- und vertikale Erschliessungssystem ermöglicht einen Zusammenschluss als auch den unabhängigen Betrieb der einzelnen Nutzergruppen. Zwei Gebäudeeingänge öffnen den Bau und entflechten die verschiedenen Nutzungen. Eine Haupttreppe mit Lift erschliesst sämtliche Ge-schosse und verbindet alle Gebäudebereiche. Das zweite und dritte Obergeschoss prägt eine einheitliche Grundrissgestaltung. Im zweiten Obergeschoss bilden die vier Klassenzimmer mit dazwischenliegenden Gruppenräumen einen Unterrichtscluster um eine mittige Aufenthalts- und Garderobenzone. Im dritten Obergeschoss sind Therapie und Logopädie wie auch die Räume des Förderzentrums eingerichtet. Im Untergeschoss befindet sich der Mehrzweckraum mit einer direkten Verbindung zur Turnhalle. Treppe und Aufzug verbinden diesen Raum mit der Küche und den Gemeinschaftsräumen im Erdgeschoss.

Official source: SIMAP ↗

Notice updates

November 5, 2026 · Version 2

Summary and analysis updated · Original notice updated · Source notice details updated · Source references updated · Status changed

Extension of the Eselriet School Facility, Cost Group 271 Plastering Works

Title Extension of the Eselriet School Facility, Cost Group 271 Plastering Works Description The Eselriet school complex is located on the southwestern edge of the settlement area of Effretikon, where the built environment transitions into the surrounding landscape, characterized by forested slopes and agricultural land. The building ensemble, constructed in 1974, features a cohesive architectural design typical of its era. Oriented towards the south and defined by a precise building outline, it integrates harmoniously into its natural setting. Functionally differentiated building wings are arranged around a central schoolyard, forming a unified overall composition. The project involves the extension of the school complex through the construction of a compact new building directly attached to the existing sports hall. The existing structures and the extension will be combined into a coherent and integrated facility. A generous and clearly organized entrance area will be created from Sportplatzstrasse. The new building accommodates the extensive spatial requirements of the school, the day-care facilities, and the local sports clubs under one roof. The access and vertical circulation system enables both interconnected use and independent operation by the various user groups. Two separate entrances open the building and clearly separate the different functions. A main staircase and elevator provide access to all floors and connect all parts of the building. The second and third floors share a consistent floor plan layout. On the second floor, four classrooms and the intermediate group rooms form a learning cluster around a central common area and cloakroom zone. The third floor accommodates therapy and speech therapy facilities, as well as the rooms of the educational support center. The basement houses a multi-purpose room with direct access to the sports hall. A staircase and elevator connect this room to the kitchen and the communal spaces on the ground floor. Publication date 2026-09-18 Offer deadline 2026-10-28T14:00:00+01:00 CPV classification 45210000 — Building construction work Contract/execution period 2027-07-01–2028-01-31 Offer languages de Variants yes Partial offers no Consortium bids yes Subcontractors yes [CURRENT OFFICIAL SIMAP DESCRIPTION DE] Die Schulanlage Eselriet befindet sich am südwestlichen Siedlungsrand von Effretikon beim Übergang zum Landschaftsraum mit seitlichen Waldflanken und Agrarflächen. Das Gebäudeensemble aus dem Jahre 1974 prägt eine einheitliche, zeittypische Gestaltung. Übereck nach Süden ausgerichtet schreibt es sich mit einer präzisen Umrisslinie in den naturnahen Kontext ein. Funktional differenzierte Gebäudetrakte gruppieren sich um den mittigen Pausenplatz zu einer Gesamtform. Das Bauprojekt beabsichtigt die bauliche Erweiterung der Schulanlage mit einem kompakten, direkt an die Turnhalle angebauten Neubau. Bestand und Neubau werden zu einer schlüssigen Anlage zusammengefügt. Von der Sportplatzstrasse her entsteht eine breite und übersichtliche Zugangssituation. Der Neubau vereint das umfangreiche Raumprogramm mit den Räumen für den Schulbetrieb, die Tagesbetreuung und die Sportvereine unter einem Dach. Das Zugangs- und vertikale Erschliessungssystem ermöglicht einen Zusammenschluss als auch den unabhängigen Betrieb der einzelnen Nutzergruppen. Zwei Gebäudeeingänge öffnen den Bau und entflechten die verschiedenen Nutzungen. Eine Haupttreppe mit Lift erschliesst sämtliche Ge-schosse und verbindet alle Gebäudebereiche. Das zweite und dritte Obergeschoss prägt eine einheitliche Grundrissgestaltung. Im zweiten Obergeschoss bilden die vier Klassenzimmer mit dazwischenliegenden Gruppenräumen einen Unterrichtscluster um eine mittige Aufenthalts- und Garderobenzone. Im dritten Obergeschoss sind Therapie und Logopädie wie auch die Räume des Förderzentrums eingerichtet. Im Untergeschoss befindet sich der Mehrzweckraum mit einer direkten Verbindung zur Turnhalle. Treppe und Aufzug verbinden diesen Raum mit der Küche und den Gemeinschaftsräumen im Erdgeschoss.

October 11, 2026 · Version 1

Published

Extension of the Eselriet School Facility, Cost Group 271 Plastering Works

Title Extension of the Eselriet School Facility, Cost Group 271 Plastering Works Description The Eselriet school complex is located on the southwestern edge of the settlement area of Effretikon, where the built environment transitions into the surrounding landscape, characterized by forested slopes and agricultural land. The building ensemble, constructed in 1974, features a cohesive architectural design typical of its era. Oriented towards the south and defined by a precise building outline, it integrates harmoniously into its natural setting. Functionally differentiated building wings are arranged around a central schoolyard, forming a unified overall composition. The project involves the extension of the school complex through the construction of a compact new building directly attached to the existing sports hall. The existing structures and the extension will be combined into a coherent and integrated facility. A generous and clearly organized entrance area will be created from Sportplatzstrasse. The new building accommodates the extensive spatial requirements of the school, the day-care facilities, and the local sports clubs under one roof. The access and vertical circulation system enables both interconnected use and independent operation by the various user groups. Two separate entrances open the building and clearly separate the different functions. A main staircase and elevator provide access to all floors and connect all parts of the building. The second and third floors share a consistent floor plan layout. On the second floor, four classrooms and the intermediate group rooms form a learning cluster around a central common area and cloakroom zone. The third floor accommodates therapy and speech therapy facilities, as well as the rooms of the educational support center. The basement houses a multi-purpose room with direct access to the sports hall. A staircase and elevator connect this room to the kitchen and the communal spaces on the ground floor. Publication date 2026-09-18 Offer deadline 2026-10-28T14:00:00+01:00 CPV classification 45210000 — Building construction work Contract/execution period 2027-07-01–2028-01-31 Offer languages de Variants yes Partial offers no Consortium bids yes Subcontractors yes