Repair and rehabilitation of the Silk Cocoon Production Hub
Outcome
Submissions closed on 16 October 2026. No award has been published yet. Open tenders like this one are listed below.
- Place
- Nueva Vizcaya State University, Philippines
- Quotation closing date
- 01:00 AM · UTC
- Contract value
- Not stated in the notice
- Lots
- 1 lot
- Contract period
- Works duration: 60 calendar days after receipt of PO/NTP; the RFQ separately states delivery within 30 calendar days.
- Published
- October 8, 2026
- PhilGEPS Modernized Government e-Procurement System
Overview
The Philippine Textile Research Institute invited quotations for one lot to repair and rehabilitate the 80-square-metre Silk Cocoon Production Hub at Nueva Vizcaya State University. The current official PhilGEPS page marks the notice closed and shows 16 October 2026 at 09:00 without a timezone; the leased snapshot separately records 01:00 UTC. The page displays an approved-budget amount of 839,029.84 but gives no currency, so no currency is assigned. The formal RFQ requests a signed quotation and documentary requirements, delivery within 30 calendar days and 45-day price validity. Works duration is separately 60 calendar days after receipt of PO/NTP. No award is shown.
Information based on the public notice
Ask about this tender
What the buyer needs
One lot of civil works: repair and rehabilitation of the named 80 sqm facility, including earthworks/civil, structural, architectural and electrical work, delivery, labor and installation.
- Submit the signed RFQ and specified documents; the RFQ requests the lowest price and shortest delivery period. Use the stated ProcMIS channel and follow the listed disqualification conditions. Include applicable taxes and costs, state brand/model and provide specifications or brochures.
Lots
1 ·Repair and rehabilitation of the Silk Cocoon Production Hub (80sqm)
Tender details
- Buyer
- Philippine Textile Research Institute
- Country
Philippines
- Procedure
- Small Value Procurement
- Classification
- Not stated in the notice
- Notice reference
- 96451
- Displayed approved budget
- 839,029.84; currency not stated.
- Status and deadline
- Closed. 16 October 2026 at 09:00 as displayed, timezone unstated; available notice information separately says 01:00 UTC.
- Delivery and works duration
- Delivery within 30 calendar days; works duration 60 calendar days after receipt of PO/NTP.
- Price validity and warranty
- 45 calendar days; one year for equipment and six months for supplies/materials from PTRI acceptance.
- Award
- No award shown.
What to check in the tender documents
- The displayed closing time has no stated timezone and is not reconciled with the canonical UTC instant. The displayed budget amount has no stated currency. The separate merged project PDF and AAE/plan were not opened. No award details are shown.
Original notice
Read the original description
PR No. 2609-1259 One (1) Lot Repair and Rehabilitation of Silk Cocoon Production Hub (80sqm)
Official source: PhilGEPS Modernized Government e-Procurement System ↗
Notice updates
October 16, 2026 · Version 2
Buyer updated · Contract period updated · Summary and analysis updated · Tender facts updated · Original notice updated · Source notice details updated · Source references updated · Status changed
PR No. 2609-1259 One (1) Lot Repair and Rehabilitation of Silk Cocoon Production Hub (80sqm)
PHILGEPS LIVE TENDER DETAIL (official HTML text; selected direct personal contact spans redacted) PS-PhilGEPS HOME ABOUT ANNOUNCEMENT TRAINING SERVICES OPEN DATA LOGIN SIGN UP Date: Modernized Government e-Procurement System PS-PhilGEPS Bid Notice Details Back Print View Item History Notice Reference Number :96451 Status : Closed Bid Validity Period (in Days): 60 Control Number: 26091259 Lot Type: Single Lot Approved Budget of the Contract: 839,029.84 Procurement Mode: Small Value Procurement Classification: Civil Works - Infra Project Applicable Procurement Rules: Implementing Rules and Regulations Funding Source: Regular Agency Fund (01000000) Delivery/Project Location: Nueva Vizcaya Business Category: Building and facility maintenance and repair services Delivery Period: 60 Client Agency: PHILIPPINE TEXTILE RESEARCH INSTITUTE Contact Person: [PERSONAL CONTACT REDACTED] Created By: CARLO BAHIL Date created: 08-Oct-2026 03:14 PM PHILIPPINE TEXTILE RESEARCH INSTITUTE Gen. Santos Ave., Bicutan Taguig City, Metro Manila, NCR Request for Quotation PR No. 2609-1259 One (1) Lot Repair and Rehabilitation of Silk Cocoon Production Hub (80sqm) Project Name: PR No. 2609-1259 One (1) Lot Repair and Rehabilitation of Silk Cocoon Production Hub (80sqm) Budget : 839029.84 Check item status Description: PR No. 2609-1259 One (1) Lot Repair and Rehabilitation of Silk Cocoon Production Hub (80sqm) The Department of Science and Technology - Philippine Textile Research Institute (DOST-PTRI) announces an open procurement opportunity and invites interested and qualified suppliers to submit their quotations for this project. Please refer to the attached RFQ Form for detailed Specifications/Terms of Reference/Scope of Work A.Requirements for Submission: 1. Documentary Requirements: (To be submitted on or before the specified deadline) Duly Filled-Out Request For Quotation (RFQ) Form Mayor’s Permit 2026 mPhilGEPS Proof of Registration (Red/Platinum) Latest Income Tax Return PCAB License (For Infra) 2. Post-Evaluation Requirement (Winning Bidder, for SVP with ABC above PHP 50,000): Notarized Omnibus Sworn Statement (to be submitted within 5 calendar days upon request) B.Instructions for Submission: 1. All quotations together with the required documentary requirements must be submitted on or before the indicated Closing Date and Time through any of the following modes: BIDS MUST BE SUBMITTED using our Procurement Management Information System (ProcMIS) through the link below: https://bit.ly/ProcMIS-SupplierLogin Bidders may register thru this link: https://procmis.dost-ptri.com/supplier/ 2. Quotations shall be automatically disqualified and will not proceed to technical evaluation under any of the following conditions: Quotations with incomplete documentary requirements (except suppliers who already submitted updated legal documents for the current year.) Quotations received beyond the deadline Quotations sent through unofficial email accounts or e-platforms (e.g., personal emails, Facebook Messenger) Improperly accomplished RFQ Form Quotations from suppliers with pending or unperformed deliveries beyond the original contract delivery terms C. Important Reminders: Quoted prices must be VAT-inclusive, covering all applicable taxes, fees, duties (if any), delivery/freight charges, installation costs, and any other incidental expenses. All bidders must specify the brand/model (if applicable) and provide detailed specifications or submit a brochure of the offered item(s). Delivery terms must be stated in calendar days, not working days. Payment Terms: No required down payment / No Cash-on-Delivery (COD). Delivery Destination: As specified in the Request for Quotation (RFQ) Form Delivery Requirement: All items must be delivered in person to the specified delivery location. Deliveries through any courier or third-party delivery platforms are not allowed. We encourage all qualified and interested suppliers to participate in this procurement activity. For inquiries and clarifications, please contact: [PERSONAL CONTACT REDACTED] Viber: [PERSONAL CONTACT REDACTED] bacsecretariat@ptri.dost.gov.ph We look forward to your participation. Scope of work: 1 lot Repair and Rehabilitation of Silk Cocoon Production Hub (80sqm) Location: Nueva Vizcaya State University Scope of Works: - Earthworks & Civil Works - Structural Works -Architectural Works -Electrical Works - Inclusive of delivery, labor, and installation -VAT inclusive Duration: 60 calendar days upon receipt of PO/NTP Note: See attached AAE and plan Line Item Details Item No. UNSPSC Lot Name Lot Description Quantity Unit of Measure 1 72100000 Building and facility maintenance and repair services PR No. 2609-1259 One (1) Lot Repair and Rehabilitation of Silk Cocoon Production Hub (80sqm) 1 Lot Schedule of activity: View all activity Published Date: 09-Oct-2026 12:00 AM Closing Date: 16-Oct-2026 09:00 AM Date Last updated: 16-Oct-2026 01:01 AM Documents: Preview Bid Form Fee: 0 Bid Supplements: 0 Invited Observers: View Number of Downloads: 0 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party. GOVERMENT AGENCY LINKS TERMS & CONDITIONS PRIVACY POLICY DISCLAIMER NOTICE CONTACT US Copyright © 2023 Procurement Service - PhilGEPS. All rights reserved. FORMAL REQUEST FOR QUOTATION (official one-page PDF; complete text extraction, visually checked) FAD-PS Form No. 02 Rev. 0/03-08-26 Department of Science and Technology PHILIPPINE TEXTILE RESEARCH INSTITUTE General Santos Avenue, Bicutan, Taguig City Telephone No. 8372071 Local 2373 & 2366; Telefax No. 8370744 Request for Quotation Date 29-Sep-2026 Quotation No. 1166-26 Company Name: _____________________________ PR No. 2609-1259 Address: ___________________________________ End-user RDD-NFUS Please quote your lowest price on the item/s listed below, subject to the General Conditions on the last page, stating the shortest time of delivery and submit your quotation duly signed by your representative not later than 3 CALENDAR DAYS in the return envelope attached herewith. CARLO M. BAHIL ADMINISTRATIVE OFFICER III NOTE: 1. ALL ENTRIES MUST BE TYPEWRITTEN. 2. DELIVERY PERIOD MUST BE WITHIN 30 CALENDAR DAYS. 3. WARRANTY SHALL BE FOR A PERIOD OF, FROM THE ACCEPTANCE BY THE PTRI: a. ONE (1) YEAR FOR EQUIPMENT b. SIX (6) MONTHS FOR SUPPLIES & MATERIALS 4. PRICE VALIDITY SHALL BE FOR A PERIOD OF 45 CALENDAR DAYS 5. PhilGEPS REGISTRATION CERTIFICATE SHALL BE ATTACHED UPON SUBMISSION OF THE QUOTATION. 6. BIDDERS SHALL SUBMIT ORIGINAL BROCHURES SHOWING CERTIFICATIONS OF THE PRODUCT BEING OFFERED. ITEM NO. ITEM AND DESCRIPTION QTY UNIT PRICE 1 Repair and Rehabilitation of Silk Cocoon Production Hub (80sqm) 1 lot Location: Nueva Vizcaya State University Scope of Works: - Earthworks & Civil Works - Structural Works -Architectural Works -Electrical Works - Inclusive of delivery, labor, and installation -VAT inclusive Duration: 60 calendar days upon receipt of PO/NTP Note: See attached AAE and plan Brand and Model: Delivery Period: Warranty: Price Validity: After having carefully read and accepted your General Conditions, I/We quote you on the item at prices noted above. Printed Name / Signature Tel. No. / Cellphone No. E-mail Address Date
October 12, 2026 · Version 1
Published
PR No. 2609-1259 One (1) Lot Repair and Rehabilitation of Silk Cocoon Production Hub (80sqm)
PR No. 2609-1259 One (1) Lot Repair and Rehabilitation of Silk Cocoon Production Hub (80sqm) The Department of Science and Technology - Philippine Textile Research Institute (DOST-PTRI) announces an open procurement opportunity and invites interested and qualified suppliers to submit their quotations for this project. Please refer to the attached RFQ Form for detailed Specifications/Terms of Reference/Scope of Work A.Requirements for Submission: 1. Documentary Requirements: (To be submitted on or before the specified deadline) Duly Filled-Out Request For Quotation (RFQ) Form Mayor’s Permit 2026 mPhilGEPS Proof of Registration (Red/Platinum) Latest Income Tax Return PCAB License (For Infra) 2. Post-Evaluation Requirement (Winning Bidder, for SVP with ABC above PHP 50,000): Notarized Omnibus Sworn Statement (to be submitted within 5 calendar days upon request) B.Instructions for Submission: 1. All quotations together with the required documentary requirements must be submitted on or before the indicated Closing Date and Time through any of the following modes: BIDS MUST BE SUBMITTED using our Procurement Management Information System (ProcMIS) through the link below: https://bit.ly/ProcMIS-SupplierLogin Bidders may register thru this link: https://procmis.dost-ptri.com/supplier/ 2. Quotations shall be automatically disqualified and will not proceed to technical evaluation under any of the following conditions: Quotations with incomplete documentary requirements (except suppliers who already submitted updated legal documents for the current year.) Quotations received beyond the deadline Quotations sent through unofficial email accounts or e-platforms (e.g., personal emails, Facebook Messenger) Improperly accomplished RFQ Form Quotations from suppliers with pending or unperformed deliveries beyond the original contract delivery terms C. Important Reminders: Quoted prices must be VAT-inclusive, covering all applicable taxes, fees, duties (if any), delivery/freight charges, installation costs, and any other incidental expenses. All bidders must specify the brand/model (if applicable) and provide detailed specifications or submit a brochure of the offered item(s). Delivery terms must be stated in calendar days, not working days. Payment Terms: No required down payment / No Cash-on-Delivery (COD). Delivery Destination: As specified in the Request for Quotation (RFQ) Form Delivery Requirement: All items must be delivered in person to the specified delivery location. Deliveries through any courier or third-party delivery platforms are not allowed. We encourage all qualified and interested suppliers to participate in this procurement activity. Scope of work: 1 lot Repair and Rehabilitation of Silk Cocoon Production Hub (80sqm) Location: Nueva Vizcaya State University Scope of Works: - Earthworks & Civil Works - Structural Works -Architectural Works -Electrical Works - Inclusive of delivery, labor, and installation -VAT inclusive Duration: 60 calendar days upon receipt of PO/NTP
https://philgeps.gov.ph/Indexes/viewLiveTenderDetails/96451/OPEN_MORE
Source retrieved: 2026-10-16T08:50:40.100260Z