GPU cluster expansion – PR1267570-2140-I
Outcome
Submissions closed on 3 November 2026. No award has been published yet. Open tenders like this one are listed below.
- Place
- Germany
- TED: 3 November 2026, +01, date only; no time is given. Canonical snapshot separately: 2 November 2026 at 23:00 UTC.
- Time not stated
- Contract value
- Not stated in the notice
- Contract period
- The notice specifies five years for the DGX support/software subscription and the two on-demand engineering service periods; the overall contract term is not stated.
- Published
- October 4, 2026
- Exact official TED Search API notice 685488-2026 and leased canonical snapshot
Overview
Fraunhofer-Gesellschaft seeks an integrated GPU cluster that fits its existing Nvidia DGX and storage environment. The notice lists one DGX B300 system, eight five-year NVIDIA AI Enterprise subscriptions, onsite support, installation, validation, handover and initial training, followed by 24×7×365 helpdesk support. Two on-demand engineering services are specified at 75 hours each over five years, without guaranteed take-up of the maximum volume. Listed award criteria are delivery information, service concept and price; no weights are stated. TED gives a date-only deadline of 3 November 2026 (+01); the leased available notice information separately gives 2 November at 23:00 UTC.
Information based on the public notice
Ask about this tender
What the buyer needs
Integrated supply and services for a GPU compute-cluster expansion, including hardware/software, installation and commissioning-related support.
Tender details
- Buyer
- Fraunhofer-Gesellschaft - Einkauf B12
- Country
Germany
- Procedure
- open
- Classification
- CPV 48820000
- Notice reference
- 685488-2026
- TED notice
- 685488-2026; published 5 October 2026 (+02), date precision
- TED procedure identifier
- 0ae091d9-d2a0-462d-a5a7-d0f581c11bf8
- Integrated solution
- GPU-based compute cluster must integrate with the existing Nvidia DGX landscape and storage environment.
- Hardware
- 1 × DGX B300 P4387 PSU System, 2304GB Full, standard support, EDU, 5 years.
- Software
- 8 × NVIDIA AI Enterprise subscriptions per GPU, EDU, 5 years.
- Service
- 1 × onsite 8x5x4 service for DGX B300 PSU 2304GB.
- Services through acceptance
- Kickoff, project management, pre-installation workshop, on-site hardware/software installation, validation and tests, handover/documentation, and 8 hours of initial training for up to 8 people.
- Post-acceptance service
- Helpdesk 24×7×365.
- On-demand professional services
- 75 hours NVIDIA Professional System Engineer and 75 hours NetApp Professional System Engineer over 5 years, called off on effort basis; the maximum volume is not guaranteed to be taken up.
- Award criteria named
- Delivery information; service concept; price. No weights are shown in the accessible fields.
- TED deadline
- 3 November 2026 (+01), date only; no time stated
- Available notice information deadline
- 2 November 2026, 23:00 UTC; shown separately because TED gives date-only precision
- Canonical CPV
- 48820000
What to check in the tender documents
- No monetary value, criterion weights, formal lot count, or award is stated in the accessible official notice fields. The overall contract period is not stated, although several listed items and services specify five years. TED direct HTML, PDF and XML returned HTTP 429.
Original notice
Read the original description
GPU-Cluster Erweiterung - PR1267570-2140-I
Official source: Exact official TED Search API notice 685488-2026 and leased canonical snapshot ↗
https://ted.europa.eu/en/notice/-/detail/685488-2026
Source retrieved: 2026-10-13T11:26:24.285838Z