Bilbao Southern Railway Bypass, Phase 1, Durañona–Burtxako section
Outcome
Submissions closed on 2 November 2026. No award has been published yet. Open tenders like this one are listed below.
- Buyer
- Euskal Trenbide Sarea
- Place
- Bizkaia, Spain (NUTS ES213)
- Official TED deadline: 2 November 2026, 12:00 +02:00 (10:00 UTC). The Euskadi profile prints 12:00 without an offset; the leased canonical timestamp is 11:00 UTC, one hour later.
- 10:00 AM · UTC
- Contract value
- €77,910,723.34
- The exact TED notice gives EUR 77,910,723.34 as estimated value; its VAT treatment is unstated. The Euskadi profile separately lists EUR 64,925,602.78 excluding VAT and EUR 78,559,979.36 including 21% VAT.
- Contract period
- 39 months; no extensions
- Published
- October 2, 2026
- Euskadi official public procurement profile, expediente P20028210
Overview
The official profile confirms an open works tender for the Bilbao Southern Railway Bypass. The exact TED notice identifies the estimated value as EUR 77,910,723.34, separately from the EUR 64,925,602.78 pre-tax budget and EUR 78,559,979.36 including 21% VAT. The project is not divided into lots, runs for 39 months, and uses multiple award criteria. TED gives the deadline as 2 November 12:00 +02:00 (10:00 UTC); the leased timestamp is 11:00 UTC and conflicts by one hour.
Information based on the public notice
Ask about this tender
What the buyer needs
Open public works procurement for railway tunnel and structural works in Bizkaia. The profile reports no lot division, a 39-month term, no extensions, no award resolution and no contract record.
- Electronic submission is required; offers may be in Spanish or Basque and remain valid for two months. Minimum turnover and comparable project experience requirements are stated in the public profile.
Tender details
- Buyer
- Euskal Trenbide Sarea
- Country
Spain
- Procedure
- Open procedure
- Classification
- Railway construction · CPV 45221242 · NUTS ES213
- Notice reference
- 20463742
- Exact notice identity
- The official Euskadi profile for expediente P20028210 matches the leased title, contracting authority Euskal Trenbide Sarea and buyer entity. The page records the open submission stage and latest publication 2 October 2026 at 13:02.
- Works scope
- Construction of phase 1 of the Bilbao Southern Railway Bypass, section Durañona–Burtxako. The page identifies railway tunnel platform works and structures.
- Status and procedure
- Open procedure; the official page says “Abierto / Plazo de presentación” (open / submission period). No award resolution or contract information is displayed.
- Estimated value
- EUR 77,910,723.34 is shown as estimated value. Its VAT treatment is not specified.
- Budget and VAT
- The contract budget is EUR 64,925,602.78 excluding VAT and EUR 78,559,979.36 including VAT, with VAT shown as 21%. These are separate from the stated estimated value.
- Structure and term
- The procurement is not divided into lots, has no extensions, and is scheduled for 39 months. Variants, options and unit pricing are not accepted.
- Award criteria
- Multiple criteria: price 31%; technical memorandum 49%; assigned technicians’ experience 8%; quality control 4%; gender equality in the team 4%; extension of the works guarantee 4%.
- Qualification
- Minimum annual turnover EUR 32,500,000 excluding VAT in the highest-turnover year of the last three. At least one comparable rail-infrastructure platform/tunnel project worth EUR 20,000,000 or more within the last ten years is required.
- Security
- No provisional guarantee; definitive guarantee 5% of the awarded amount excluding VAT.
- Deadline
- TED gives the exact deadline as 2 November 2026, 12:00 +02:00 (10:00 UTC). The Euskadi profile prints 12:00 without a zone; the canonical leased timestamp 11:00 UTC conflicts by one hour.
- Opening schedule
- Capacity/qualification opening is estimated for 2 November 12:30; qualitative-judgment opening is estimated for 2 November 13:00; formula opening is 4 December 11:00. The page does not state timezones.
- Submission
- Electronic submission; bids may be submitted in Spanish or Basque. Bid validity is two months.
What to check in the tender documents
- The leased deadline is one hour later than the exact TED notice deadline. The VAT treatment of the estimated-value field is unspecified. The raw Euskadi profile is preserved unchanged; the public-text derivative omits the supporting-file inventory and one public meeting-access line.
Original notice
Read the original description
Obra de la Variante Sur Ferroviaria de Bilbao. Fase 1. Tramo: Durañona-Burtxako
Official source: Euskadi official public procurement profile, expediente P20028210 ↗
https://www.contratacion.euskadi.eus/webkpe00-kpeperfi/es/contenidos/anuncio_contratacion/expjaso742777/es_doc/index.html
Source retrieved: 2026-10-13T13:55:44.299843Z