Renewal of the retaining wall at Werlau railway line

Outcome

Submissions closed on 2 November 2026. No award has been published yet. Open tenders like this one are listed below.

Place
56329 Sankt Goar, DEB, DEU
Canonical deadline: 2 November 2026 at 12:00 UTC. Official detail could not be retrieved to confirm any local-time presentation.
12:00 PM · UTC
Contract value
Not stated in the notice
Classification
Railway retaining-wall renewal
Published
October 4, 2026
DB InfraGO AG ? Geschäftsbereich Fahrweg (Bukr 16)

Overview

DB InfraGO AG’s notice concerns renewal of the retaining wall beside railway line 2630, from kilometre 124.041 to 124.221 on the left-hand side of the track, as a like-for-like replacement structure. The published description says the wall is in poor structural condition and its renewal is intended to secure long-term availability of the line. The record identifies the location as 56329 Sankt Goar and shows the procedure as open. The official detail page could not be retrieved after repeated attempts, so the published description does not provide verified information about the construction method, quantities, value, eligibility conditions, award criteria or submission channel. The deadline is 2 November 2026 at 12:00 UTC.

Information based on the public notice

What the buyer needs

Like-for-like replacement of the retaining wall beside railway line 2630 from km 124.041 to 124.221 on the left of the track, near Sankt Goar. The description attributes the renewal to poor structural condition and the objective of maintaining long-term route availability.

Tender details

Buyer
DB InfraGO AG ? Geschäftsbereich Fahrweg (Bukr 16)
Country
Germany
Procedure
de-open
Classification
Railway retaining-wall renewal · CPV 45000000
Notice reference
ocds-mnwr74-25851510
Railway section
Line 2630, km 124.041 to 124.221, left side of track
Location
56329 Sankt Goar, DEB, DEU
Procedure status
Open
Deadline
2 November 2026 at 12:00 UTC

What to check in the tender documents

  • The official notice detail page reset the HTTPS connection on repeated attempts and could not be retrieved. Construction method, quantities, estimated value, qualification requirements, award criteria, submission channel and opening terms are not available in the notice description.
Get started with Ziva

Original notice

Read the original description

Erneuerung der Stützmauer Werlau

Die Stützwand an der Strecke 2630 von km 124,041 bis 124,221 links der Bahn ist bedarfsgerecht als 1:1-Ersatzneubau zu erneuern. Aufgrund des schlechten baulichen Zustandes der Stützwand wurde seitens DB InfraGO AG beschlossen diese zu erneuern und dadurch die zukünftige Verfügbarkeit der Strecke dauerhaft zu gewährleisten. Erneuerung der Stützmauer Werlau

Official source: DB InfraGO AG ? Geschäftsbereich Fahrweg (Bukr 16) ↗