Design and installation of office partitions in Lusaka

Outcome

Submissions closed on 20 October 2026. No award has been published yet.

The World Bank listing gives 16 October 2026 at 14:00 CAT; the RFQ text gives 20 October 2026 at 14:00 CAT. This page shows the deadline stated in the RFQ text.

Place
Zambia
Quotation submission deadline
12:00 PM · UTC
Contract value
$190,000
Estimated value in the listing; tax treatment is not stated.
Classification
Construction and civil works
Published
October 9, 202
World Bank procurement notice API

Overview

Zambia’s Ministry of Local Government and Rural Development invites quotations to design, supply and install office partitions and carry out associated electrical, finishing and reinstatement work for the Zambia Devolution Support Programme offices in Lusaka. The RFQ text states a cutoff of 20 October 2026 at 14:00 CAT (UTC+02:00); the World Bank listing gives 16 October 2026 at 14:00 CAT, so this page shows the RFQ-text cutoff and identifies the discrepancy. The listing estimates the procurement at USD 190,000; tax treatment is not stated. An optional site visit was scheduled for 12 October 2026 at 10:00, with no time zone stated.

Information based on the public notice

What the buyer needs

Design, supply and installation of office partition systems and associated electrical and finishing works at the programme offices in Lusaka.

Tender details

Buyer
Ministry of Local Government and Rural Development
Country
Zambia
Procedure
Request for Quotations
Classification
Construction and civil works · WORLD_BANK P178492
Notice reference
OP00474274
Quotation deadline
20 October 2026 at 14:00 CAT (UTC+02:00); the World Bank listing separately gives 16 October 2026 at 14:00 CAT.
Estimated value
USD 190,000 estimated value in the World Bank listing; tax treatment not stated.

Original notice

Read the original description

Partitioning ZDSP offices

MINISTRY OF LOCAL GOVERNMENT AND RURAL DEVELOPMENT ZAMBIA DEVOLUTION SUPPORT PROGRAMME (ZDSP) REQUEST FOR QUOTATIONS FOR SMALL WORKS PROJECT ID: P178492 DESIGN, SUPPLY AND INSTALLATION OF OFFICE PARTITIONS AND ASSOCIATED OFFICE WORKS FOR THE ZAMBIA DEVOLUTION SUPPORT PROGRAMME (ZDSP) RFQ Reference No.: ZM-MLGRD-568070-CW-RFQ Date of Issue: 1 October, 2026 Deadline for Submission of Quotations: 20th October, 2026 SECTION I – REQUEST FOR QUOTATIONS The Government of the Republic of Zambia, through the Ministry of Local Government and Rural Development (MLGRD) , is implementing the Zambia Devolution Support Programme (ZDSP) with support from the World Bank. The Ministry intends to procure the Design, Supply and Installation of Office Partitions and Associated Office Works for the Zambia Devolution Support Programme (ZDSP) . You are hereby invited to submit a quotation for the execution and completion of the Works described in this Request for Quotations. The Works generally comprise the assessment and measurement of the existing office space, preparation of partitioning layouts/designs, supply and installation of partition systems, associated electrical and finishing works, and making good of affected areas. The Works shall be executed at: Ministry of Local Government and Rural Development / Zambia Devolution Support Programme offices, 6th Floor. The Contractor shall be responsible for verifying site conditions and measurements before submitting its quotation. 1. Site Visit Interested firms are encouraged to undertake a site visit to inspect the proposed work areas and familiarize themselves with the existing conditions. The site visit shall be held on: Date: 12th October, 2026 Time: 10:00hours Venue: Ministry of Local Government and Rural Development The cost of the site visit shall be borne by the prospective Contractor. Any clarification arising from the site visit shall be submitted to the Procuring Entity in writing. 2. Submission of Quotations Quotations shall be submitted to: The Head Procurement/Procurement Specialist Zambia Devolution Support Programme Ministry of Local Government and Rural Development Lusaka, Zambia The quotation must be clearly marked: "QUOTATION – DESIGN, SUPPLY AND INSTALLATION OF OFFICE PARTITIONS AND ASSOCIATED OFFICE WORKS – ZDSP – RFQ No. [INSERT]" Quotations must be received no later than:20th October, 2026 at 14:00 hours, Central African Time (CAT). Late quotations shall not be considered. SECTION II – INSTRUCTIONS TO QUOTERS 1. Scope of Works The Contractor shall undertake the design, supply, installation and completion of office partitioning and associated works as specified in this RFQ. The Works shall include, but shall not necessarily be limited to: Site inspection and verification of dimensions; Preparation of proposed partitioning layout/design; Supply and installation of office partition systems; Supply and installation of doors and associated hardware; Electrical modifications necessitated by the partitioning works; Relocation or adjustment of lighting points, switches and sockets, where required; Data/telephone point adjustments, where required; Ceiling and floor interface works; Painting and finishing; Making good of surfaces affected by the Works; Removal and disposal of construction waste; Cleaning of the work area upon completion; Testing and commissioning of relevant installations; and Rectification of defects identified during inspection and within the applicable defects liability period. The Contractor shall provide all labour, supervision, materials, tools, equipment, transport and other resources necessary for satisfactory completion of the Works. 2. Design Responsibility The Contractor shall verify the existing site conditions and dimensions before commencing the Works. Where drawings or layouts are provided by the Client, these shall be treated as indicative unless expressly stated otherwise. The Contractor shall identify any discrepancies affecting the execution of the Works. The Contractor shall submit the proposed partitioning layout/design to the Client for approval before commencing installation. No material alteration to the approved design shall be undertaken without prior written approval from the Client. 3. Specifications and Standards All materials and workmanship shall be of good quality and fit for purpose and shall comply with applicable Zambian standards and regulations. Where applicable, materials and installations shall comply with relevant international standards and manufacturers' specifications. The Contractor shall ensure that all electrical works are undertaken by suitably qualified personnel and comply with applicable electrical safety requirements. SECTION V – COMPLETION PERIOD The Works shall be completed within: [Insert number] calendar days/weeks from the date specified in the Letter of Acceptance/Contract or the commencement date communicated by the Client. The Contractor shall submit a simple work programme indicating: Mobilisation; Site measurement; Design/layout approval; Procurement of materials; Installation; Electrical/data works; Finishing; Testing; and Handover. SECTION VI – CONTRACTOR'S QUALIFICATION REQUIREMENTS The Contractor shall demonstrate that it has the capacity and experience to undertake the Works. The Contractor shall provide: 1. Legal Registration Certificate of incorporation/registration; Valid tax clearance certificate; Relevant business licence/registration; Valid National Council for Construction (NCC) registration; Relevant professional registration/licences for specialized works, where applicable NAPSA/Workers Compensation. 2. Similar Experience The Contractor shall provide evidence of having successfully completed at least [two/three] similar office partitioning, office renovation or related small works contracts during the last [five] years . For each assignment, provide: Client; Description of works; Contract value; Location; Completion date; and Client contact/reference. 3. Personnel The Contractor shall provide details of key personnel proposed for the Works, including: Site Supervisor/Foreman; Qualified electrician, where applicable; and Other relevant skilled personnel. 4. Equipment and Resources The Contractor shall demonstrate access to the equipment, tools and resources required for the Works. SECTION VII – EVALUATION OF QUOTATIONS Quotations shall be evaluated in accordance with the applicable procurement requirements. The evaluation shall consider: Compliance with the requirements of the RFQ; Responsiveness to the technical requirements; Contractor eligibility and qualification requirements; Experience in similar Works; Completeness of the quotation and Price Schedule; and Evaluated quotation price. The Client reserves the right to verify information submitted by Contractors. The contract will be awarded to the substantially responsive quotation offering the lowest evaluated cost , subject to the applicable procurement requirements and availability of funds. SECTION VIII – VALIDITY OF QUOTATIONS Quotations shall remain valid for a period of: 90 days from the quotation submission deadline. SECTION IX – PAYMENT Payments shall be made against satisfactory completion of agreed milestones and submission of appropriate documentation. Unless otherwise agreed in the Contract, a proposed payment structureshall be: | Milestone | Percentage | Mobilisation and approved design/layout | 20% | Delivery and substantial installation of partitions | 35% | Completion of associated electrical, data and finishing works | 25% | Final inspection, rectification and handover | 15% | Retention | 5% | Total | 100% Payment shall be subject to satisfactory verification and acceptance of the relevant Works by the Department of Rural Development. SECTION X – DEFECTS LIABILITY The Contractor shall be responsible for rectifying, at its own cost, defects arising from defective workmanship or materials during the defects liability period. The defects liability period shall be: 6 months from the date of practical completion/handover. Manufacturer warranties shall be passed to the Client where applicable. SECTION XI – OCCUPATIONAL HEALTH AND SAFETY The Contractor shall comply with all applicable occupational health and safety requirements. The Contractor shall: Provide appropriate personal protective equipment; Maintain a safe working environment; Protect staff and visitors from construction hazards; Properly manage construction materials and waste; Ensure electrical works are safely isolated where necessary; Maintain appropriate housekeeping; and Immediately report accidents and incidents to the Client. The Works shall be undertaken in a manner that minimizes disruption to the normal operations of the Ministry. Where works are undertaken in occupied offices, the Contractor shall coordinate working hours and access arrangements with the Client. SECTION XII – ENVIRONMENTAL AND SOCIAL REQUIREMENTS The Contractor shall undertake the Works in a manner that minimizes adverse environmental and social impacts. The Contractor shall: Properly dispose of construction waste; Prevent unnecessary damage to existing facilities; Minimize dust, noise and disruption; Maintain safe access routes; Avoid obstruction of emergency exits; Use materials safely; Protect workers and building occupants; and Comply with applicable national environmental, labour and occupational health and safety requirements. SECTION XIII – FRAUD AND CORRUPTION The Contractor shall comply with the World Bank's applicable requirements relating to fraud and corruption. The Contractor shall not engage in corrupt, fraudulent, collusive, coercive or obstructive practices in connection with the procurement or execution of the Contract. The Client and/or the World Bank shall have the applicable rights to inspect and audit relevant records and accounts in accordance with the applicable procurement and contractual requirements. SECTION XIV – CONFIDENTIALITY The Contractor shall maintain confidentiality regarding information obtained during the execution of the Works and shall not disclose such information to third parties without prior authorization from the Client, except where disclosure is required by law. SECTION XVI – FORM OF QUOTATION Date: ______________________ To: The Ministry of Local Government and Rural Development Zambia Devolution Support Programme We, the undersigned, having examined the Request for Quotations for: Design, Supply and Installation of Office Partitions and Associated Office Works hereby offer to execute and complete the Works in conformity with the RFQ requirements for the total price of: ZMW __________________________ Amount in words: __________________________________________ We confirm that: Our quotation shall remain valid for [insert] days from the submission deadline; We have examined the site and/or familiarized ourselves with the site conditions; We have examined and understood the RFQ requirements; We have included all labour, materials, transport, equipment, overheads and other costs necessary to complete the Works; We have disclosed any actual or potential conflict of interest; We are eligible to participate in the procurement; The information provided in our quotation is true and accurate; and We undertake to execute the Works in accordance with the requirements of the RFQ if awarded the Contract. Name of Firm: ______________________________ Authorized Representative: ____________________ Position: ___________________________________ Signature: __________________________________ Date: ______________________________________ Company Stamp: ______________________________ SECTION XVII – CHECKLIST FOR QUOTERS The Quoter should ensure that the submission contains: | No. | Requirement | Included | 1 | Signed quotation | | 2 | Completed Price Schedule/BOQ | | 3 | Company registration documents | | 4 | Tax clearance certificate | | 5 | NCC registration, where applicable | | 6 | Evidence of similar works | | 7 | Client references | | 8 | Proposed completion period | | 9 | Proposed work programme | | 10 | Key personnel details | | 11 | Confirmation of quotation validity | | 12 | Confirmation of site inspection/site conditions | | 13 | Signed declaration regarding conflict of interest | | 14 | Other documents specified in the RFQ | SECTION XVIII – EMPLOYER'S PARTICULARS Employer: Ministry of Local Government and Rural Development Zambia Devolution Support Programme Project: Zambia Devolution Support Programme Project ID: P178492 Contract: Design, Supply and Installation of Office Partitions and Associated Office Works Contract Manager: Ministry of Local Government and Rural Development AND Submission Deadline: 20th October, 2026 Opening/Evaluation Date: 21st October, 2026 Expected Commencement Date: 9th November, 2026 Completion Period: 60 days Defects Liability Period: 6 months

Official source: World Bank procurement notice API ↗

Notice updates

October 23, 2026 · Version 3

Deadline information updated · Summary and analysis updated · Tender facts updated · Original notice updated · Deadline updated · Status changed · Notice update added

Partitioning ZDSP offices

MINISTRY OF LOCAL GOVERNMENT AND RURAL DEVELOPMENT ZAMBIA DEVOLUTION SUPPORT PROGRAMME (ZDSP) REQUEST FOR QUOTATIONS FOR SMALL WORKS PROJECT ID: P178492 DESIGN, SUPPLY AND INSTALLATION OF OFFICE PARTITIONS AND ASSOCIATED OFFICE WORKS FOR THE ZAMBIA DEVOLUTION SUPPORT PROGRAMME (ZDSP) RFQ Reference No.: ZM-MLGRD-568070-CW-RFQ Date of Issue: 1 October, 2026 Deadline for Submission of Quotations: 20th October, 2026 SECTION I – REQUEST FOR QUOTATIONS The Government of the Republic of Zambia, through the Ministry of Local Government and Rural Development (MLGRD) , is implementing the Zambia Devolution Support Programme (ZDSP) with support from the World Bank. The Ministry intends to procure the Design, Supply and Installation of Office Partitions and Associated Office Works for the Zambia Devolution Support Programme (ZDSP) . You are hereby invited to submit a quotation for the execution and completion of the Works described in this Request for Quotations. The Works generally comprise the assessment and measurement of the existing office space, preparation of partitioning layouts/designs, supply and installation of partition systems, associated electrical and finishing works, and making good of affected areas. The Works shall be executed at: Ministry of Local Government and Rural Development / Zambia Devolution Support Programme offices, 6th Floor. The Contractor shall be responsible for verifying site conditions and measurements before submitting its quotation. 1. Site Visit Interested firms are encouraged to undertake a site visit to inspect the proposed work areas and familiarize themselves with the existing conditions. The site visit shall be held on: Date: 12th October, 2026 Time: 10:00hours Venue: Ministry of Local Government and Rural Development The cost of the site visit shall be borne by the prospective Contractor. Any clarification arising from the site visit shall be submitted to the Procuring Entity in writing. 2. Submission of Quotations Quotations shall be submitted to: The Head Procurement/Procurement Specialist Zambia Devolution Support Programme Ministry of Local Government and Rural Development Lusaka, Zambia The quotation must be clearly marked: "QUOTATION – DESIGN, SUPPLY AND INSTALLATION OF OFFICE PARTITIONS AND ASSOCIATED OFFICE WORKS – ZDSP – RFQ No. [INSERT]" Quotations must be received no later than:20th October, 2026 at 14:00 hours, Central African Time (CAT). Late quotations shall not be considered. SECTION II – INSTRUCTIONS TO QUOTERS 1. Scope of Works The Contractor shall undertake the design, supply, installation and completion of office partitioning and associated works as specified in this RFQ. The Works shall include, but shall not necessarily be limited to: Site inspection and verification of dimensions; Preparation of proposed partitioning layout/design; Supply and installation of office partition systems; Supply and installation of doors and associated hardware; Electrical modifications necessitated by the partitioning works; Relocation or adjustment of lighting points, switches and sockets, where required; Data/telephone point adjustments, where required; Ceiling and floor interface works; Painting and finishing; Making good of surfaces affected by the Works; Removal and disposal of construction waste; Cleaning of the work area upon completion; Testing and commissioning of relevant installations; and Rectification of defects identified during inspection and within the applicable defects liability period. The Contractor shall provide all labour, supervision, materials, tools, equipment, transport and other resources necessary for satisfactory completion of the Works. 2. Design Responsibility The Contractor shall verify the existing site conditions and dimensions before commencing the Works. Where drawings or layouts are provided by the Client, these shall be treated as indicative unless expressly stated otherwise. The Contractor shall identify any discrepancies affecting the execution of the Works. The Contractor shall submit the proposed partitioning layout/design to the Client for approval before commencing installation. No material alteration to the approved design shall be undertaken without prior written approval from the Client. 3. Specifications and Standards All materials and workmanship shall be of good quality and fit for purpose and shall comply with applicable Zambian standards and regulations. Where applicable, materials and installations shall comply with relevant international standards and manufacturers' specifications. The Contractor shall ensure that all electrical works are undertaken by suitably qualified personnel and comply with applicable electrical safety requirements. SECTION V – COMPLETION PERIOD The Works shall be completed within: [Insert number] calendar days/weeks from the date specified in the Letter of Acceptance/Contract or the commencement date communicated by the Client. The Contractor shall submit a simple work programme indicating: Mobilisation; Site measurement; Design/layout approval; Procurement of materials; Installation; Electrical/data works; Finishing; Testing; and Handover. SECTION VI – CONTRACTOR'S QUALIFICATION REQUIREMENTS The Contractor shall demonstrate that it has the capacity and experience to undertake the Works. The Contractor shall provide: 1. Legal Registration Certificate of incorporation/registration; Valid tax clearance certificate; Relevant business licence/registration; Valid National Council for Construction (NCC) registration; Relevant professional registration/licences for specialized works, where applicable NAPSA/Workers Compensation. 2. Similar Experience The Contractor shall provide evidence of having successfully completed at least [two/three] similar office partitioning, office renovation or related small works contracts during the last [five] years . For each assignment, provide: Client; Description of works; Contract value; Location; Completion date; and Client contact/reference. 3. Personnel The Contractor shall provide details of key personnel proposed for the Works, including: Site Supervisor/Foreman; Qualified electrician, where applicable; and Other relevant skilled personnel. 4. Equipment and Resources The Contractor shall demonstrate access to the equipment, tools and resources required for the Works. SECTION VII – EVALUATION OF QUOTATIONS Quotations shall be evaluated in accordance with the applicable procurement requirements. The evaluation shall consider: Compliance with the requirements of the RFQ; Responsiveness to the technical requirements; Contractor eligibility and qualification requirements; Experience in similar Works; Completeness of the quotation and Price Schedule; and Evaluated quotation price. The Client reserves the right to verify information submitted by Contractors. The contract will be awarded to the substantially responsive quotation offering the lowest evaluated cost , subject to the applicable procurement requirements and availability of funds. SECTION VIII – VALIDITY OF QUOTATIONS Quotations shall remain valid for a period of: 90 days from the quotation submission deadline. SECTION IX – PAYMENT Payments shall be made against satisfactory completion of agreed milestones and submission of appropriate documentation. Unless otherwise agreed in the Contract, a proposed payment structureshall be: | Milestone | Percentage | Mobilisation and approved design/layout | 20% | Delivery and substantial installation of partitions | 35% | Completion of associated electrical, data and finishing works | 25% | Final inspection, rectification and handover | 15% | Retention | 5% | Total | 100% Payment shall be subject to satisfactory verification and acceptance of the relevant Works by the Department of Rural Development. SECTION X – DEFECTS LIABILITY The Contractor shall be responsible for rectifying, at its own cost, defects arising from defective workmanship or materials during the defects liability period. The defects liability period shall be: 6 months from the date of practical completion/handover. Manufacturer warranties shall be passed to the Client where applicable. SECTION XI – OCCUPATIONAL HEALTH AND SAFETY The Contractor shall comply with all applicable occupational health and safety requirements. The Contractor shall: Provide appropriate personal protective equipment; Maintain a safe working environment; Protect staff and visitors from construction hazards; Properly manage construction materials and waste; Ensure electrical works are safely isolated where necessary; Maintain appropriate housekeeping; and Immediately report accidents and incidents to the Client. The Works shall be undertaken in a manner that minimizes disruption to the normal operations of the Ministry. Where works are undertaken in occupied offices, the Contractor shall coordinate working hours and access arrangements with the Client. SECTION XII – ENVIRONMENTAL AND SOCIAL REQUIREMENTS The Contractor shall undertake the Works in a manner that minimizes adverse environmental and social impacts. The Contractor shall: Properly dispose of construction waste; Prevent unnecessary damage to existing facilities; Minimize dust, noise and disruption; Maintain safe access routes; Avoid obstruction of emergency exits; Use materials safely; Protect workers and building occupants; and Comply with applicable national environmental, labour and occupational health and safety requirements. SECTION XIII – FRAUD AND CORRUPTION The Contractor shall comply with the World Bank's applicable requirements relating to fraud and corruption. The Contractor shall not engage in corrupt, fraudulent, collusive, coercive or obstructive practices in connection with the procurement or execution of the Contract. The Client and/or the World Bank shall have the applicable rights to inspect and audit relevant records and accounts in accordance with the applicable procurement and contractual requirements. SECTION XIV – CONFIDENTIALITY The Contractor shall maintain confidentiality regarding information obtained during the execution of the Works and shall not disclose such information to third parties without prior authorization from the Client, except where disclosure is required by law. SECTION XVI – FORM OF QUOTATION Date: ______________________ To: The Ministry of Local Government and Rural Development Zambia Devolution Support Programme We, the undersigned, having examined the Request for Quotations for: Design, Supply and Installation of Office Partitions and Associated Office Works hereby offer to execute and complete the Works in conformity with the RFQ requirements for the total price of: ZMW __________________________ Amount in words: __________________________________________ We confirm that: Our quotation shall remain valid for [insert] days from the submission deadline; We have examined the site and/or familiarized ourselves with the site conditions; We have examined and understood the RFQ requirements; We have included all labour, materials, transport, equipment, overheads and other costs necessary to complete the Works; We have disclosed any actual or potential conflict of interest; We are eligible to participate in the procurement; The information provided in our quotation is true and accurate; and We undertake to execute the Works in accordance with the requirements of the RFQ if awarded the Contract. Name of Firm: ______________________________ Authorized Representative: ____________________ Position: ___________________________________ Signature: __________________________________ Date: ______________________________________ Company Stamp: ______________________________ SECTION XVII – CHECKLIST FOR QUOTERS The Quoter should ensure that the submission contains: | No. | Requirement | Included | 1 | Signed quotation | | 2 | Completed Price Schedule/BOQ | | 3 | Company registration documents | | 4 | Tax clearance certificate | | 5 | NCC registration, where applicable | | 6 | Evidence of similar works | | 7 | Client references | | 8 | Proposed completion period | | 9 | Proposed work programme | | 10 | Key personnel details | | 11 | Confirmation of quotation validity | | 12 | Confirmation of site inspection/site conditions | | 13 | Signed declaration regarding conflict of interest | | 14 | Other documents specified in the RFQ | SECTION XVIII – EMPLOYER'S PARTICULARS Employer: Ministry of Local Government and Rural Development Zambia Devolution Support Programme Project: Zambia Devolution Support Programme Project ID: P178492 Contract: Design, Supply and Installation of Office Partitions and Associated Office Works Contract Manager: Ministry of Local Government and Rural Development AND Submission Deadline: 20th October, 2026 Opening/Evaluation Date: 21st October, 2026 Expected Commencement Date: 9th November, 2026 Completion Period: 60 days Defects Liability Period: 6 months

October 20, 2026 · Version 2

Buyer updated · Classification updated · Summary and analysis updated · Deadline updated · Source updated · Source notice details updated · Source references updated · Notice update added

Partitioning ZDSP offices

MINISTRY OF LOCAL GOVERNMENT AND RURAL DEVELOPMENT ZAMBIA DEVOLUTION SUPPORT PROGRAMME (ZDSP) REQUEST FOR QUOTATIONS FOR SMALL WORKS PROJECT ID: P178492   DESIGN, SUPPLY AND INSTALLATION OF OFFICE PARTITIONS AND ASSOCIATED OFFICE WORKS FOR THE ZAMBIA DEVOLUTION SUPPORT PROGRAMME (ZDSP) RFQ Reference No.: ZM-MLGRD-568070-CW-RFQ Date of Issue: 1 October, 2026 Deadline for Submission of Quotations: 20th October, 2026                     SECTION I – REQUEST FOR QUOTATIONS The Government of the Republic of Zambia, through the Ministry of Local Government and Rural Development (MLGRD) , is implementing the Zambia Devolution Support Programme (ZDSP) with support from the World Bank. The Ministry intends to procure the Design, Supply and Installation of Office Partitions and Associated Office Works for the Zambia Devolution Support Programme (ZDSP) . You are hereby invited to submit a quotation for the execution and completion of the Works described in this Request for Quotations. The Works generally comprise the assessment and measurement of the existing office space, preparation of partitioning layouts/designs, supply and installation of partition systems, associated electrical and finishing works, and making good of affected areas. The Works shall be executed at: Ministry of Local Government and Rural Development / Zambia Devolution Support Programme offices, 6th Floor. The Contractor shall be responsible for verifying site conditions and measurements before submitting its quotation. 1. Site Visit Interested firms are encouraged to undertake a site visit to inspect the proposed work areas and familiarize themselves with the existing conditions. The site visit shall be held on: Date:  12th October, 2026 Time: 10:00hours Venue: Ministry of Local Government and Rural Development The cost of the site visit shall be borne by the prospective Contractor. Any clarification arising from the site visit shall be submitted to the Procuring Entity in writing. 2. Submission of Quotations Quotations shall be submitted to: The Head Procurement/Procurement Specialist Zambia Devolution Support Programme Ministry of Local Government and Rural Development Lusaka, Zambia Email: Gretchen.Mushinge@mlgrd.gov.zm The quotation must be clearly marked: "QUOTATION – DESIGN, SUPPLY AND INSTALLATION OF OFFICE PARTITIONS AND ASSOCIATED OFFICE WORKS – ZDSP – RFQ No. [INSERT]" Quotations must be received no later than:20th October, 2026 at 14:00 hours, Central African Time (CAT). Late quotations shall not be considered.

October 11, 2026 · Version 1

Published

Partitioning ZDSP offices

MINISTRY OF LOCAL GOVERNMENT AND RURAL DEVELOPMENT ZAMBIA DEVOLUTION SUPPORT PROGRAMME (ZDSP) REQUEST FOR QUOTATIONS FOR SMALL WORKS PROJECT ID: P178492   DESIGN, SUPPLY AND INSTALLATION OF OFFICE PARTITIONS AND ASSOCIATED OFFICE WORKS FOR THE ZAMBIA DEVOLUTION SUPPORT PROGRAMME (ZDSP) RFQ Reference No.: ZM-MLGRD-568070-CW-RFQ Date of Issue: 1 October, 2026 Deadline for Submission of Quotations: 20th October, 2026                     SECTION I – REQUEST FOR QUOTATIONS The Government of the Republic of Zambia, through the Ministry of Local Government and Rural Development (MLGRD) , is implementing the Zambia Devolution Support Programme (ZDSP) with support from the World Bank. The Ministry intends to procure the Design, Supply and Installation of Office Partitions and Associated Office Works for the Zambia Devolution Support Programme (ZDSP) . You are hereby invited to submit a quotation for the execution and completion of the Works described in this Request for Quotations. The Works generally comprise the assessment and measurement of the existing office space, preparation of partitioning layouts/designs, supply and installation of partition systems, associated electrical and finishing works, and making good of affected areas. The Works shall be executed at: Ministry of Local Government and Rural Development / Zambia Devolution Support Programme offices, 6th Floor. The Contractor shall be responsible for verifying site conditions and measurements before submitting its quotation. 1. Site Visit Interested firms are encouraged to undertake a site visit to inspect the proposed work areas and familiarize themselves with the existing conditions. The site visit shall be held on: Date:  12th October, 2026 Time: 10:00hours Venue: Ministry of Local Government and Rural Development The cost of the site visit shall be borne by the prospective Contractor. Any clarification arising from the site visit shall be submitted to the Procuring Entity in writing. 2. Submission of Quotations Quotations shall be submitted to: The Head Procurement/Procurement Specialist Zambia Devolution Support Programme Ministry of Local Government and Rural Development Lusaka, Zambia Email: Gretchen.Mushinge@mlgrd.gov.zm The quotation must be clearly marked: "QUOTATION – DESIGN, SUPPLY AND INSTALLATION OF OFFICE PARTITIONS AND ASSOCIATED OFFICE WORKS – ZDSP – RFQ No. [INSERT]" Quotations must be received no later than:20th October, 2026 at 14:00 hours, Central African Time (CAT). Late quotations shall not be considered.