Building 674 control-system optimisation, phase 3

GEKA mbHGermanyClosed
23 October 2026; the official buyer-local time was not verified
Time not stated
Contract value
Not stated in the notice
Classification
Building automation and control systems
Published
October 9, 2026

Datenservice Öffentlicher Einkauf

Overview

GEKA mbH seeks works to remodel the measurement, control and regulation (MSR) systems in project BA 674. The notice title identifies this as phase 3 of an energy-optimisation project, and the available description says “Umbau der MSR-Technik.” The official notice detail could not be retrieved, so the buildings, equipment, quantities, eligibility requirements and exact submission arrangements are not available in the published source extract. The available notice information gives a submission date of 23 October 2026; no buyer-local clock time was independently verified.

Information based on the public notice

What the buyer needs

Remodelling of the MSR control systems for BA 674, described as phase 3 of energy optimisation.

Tender details

Buyer
GEKA mbH
Country
Germany
Procedure
de-open
Classification
Building automation and control systems · CPV 43 · CPV 44 · CPV 45 · CPV 71
Notice reference
ocds-mnwr74-25913020
Scope
Remodelling of the MSR control systems for BA 674, described as phase 3 of energy optimisation.
Submission deadline
23 October 2026; the official buyer-local time was not verified

What to check in the tender documents

  • The detailed official notice could not be retrieved; building-level works, quantities, qualifications and submission method are not available.
Get started with Ziva

Original notice

Read the original description

BA 674 Energieoptmierung Phase 3 MSR Technk

Umbau der MSR-Technik BA 674 Energieoptmierung Phase 3 MSR Technk

Official source: Datenservice Öffentlicher Einkauf ↗