Civil works for the Feumet reservoir conversion

Gemeinde Maur - TiefbauSwitzerlandClosed

Outcome

Submissions closed on 3 November 2026. No award has been published yet. Open tenders like this one are listed below.

The current official source detail and available notice information were checked on 5 November 2026. The procedure is closed. The official submission deadline was 2026-11-03 at 10:00 UTC+01:00.

Place
Maur, canton of Zurich
2026-11-03T10:00:00+01:00
09:00 AM · UTC
Contract value
Not stated in the notice
Classification
Construction and civil works
Published
October 5, 2026
SIMAP

Overview

The project renews water mains from Feumet reservoir to the Hellstrasse-Eggstrasse junction and rebuilds Eggstrasse, including drainage and sewer networks. The notice lists two 1.1 km G200 transport mains, hydrants and service connections, ducting, manholes, foul and stormwater sewers, road drainage and about 3,900 m² of road works. A utility operator also plans ducting over about 240 m. The open procedure closes 3 November 2026 at 10:00 CET. Detailed criteria and value are not stated in the public fields.

Information based on the public notice

What the buyer needs

The project renews water mains from Feumet reservoir to the Hellstrasse-Eggstrasse junction and rebuilds Eggstrasse, including drainage and sewer networks.

Tender details

Buyer
Gemeinde Maur - Tiefbau
Country
Switzerland
Procedure
Open procedure
Classification
Construction and civil works · CPV 45231000
Notice reference
44989 · 44989-01
Submission deadline
2026-11-03T10:00:00+01:00
Location
8124 Maur, ZH, CH

What to check in the tender documents

  • Detailed award criteria and contract value are not stated in the public notice.
Get started with Ziva

Original notice

Read the original description

Umbau Reservoir Feumet - Tiefbauarbeiten Eggstrasse

Bauvorhaben: Das Reservoir Feumet dient als Druckhaltung für die Zone Maur / Uessikon. Im Reservoir befindet sich das Stufenpumwerk Forch für die Belieferung der Zone Aesch / Forch (WV Maur) über die Transportleitung Feumet - Tobelstrasse und das Stufenpumpwerk Egg für die Belieferung der Zone Radrain (WV Egg) und Zone Eggstrasse (WV Maur) über die Transportleitung Feumet – Hell (Betriebsdruck bis 20bar!). Die Wasserversorgung der Gemeinde Maur und Egg saniert die alten Transportleitung ab dem Reservoir Feuemt bis zur Kreuzung Hellstrasse – Eggstrasse im Jahr 2027. Von den ca. 1’100m befindet sich ca. 350m im Kulturland und 800m in der Eggstrasse. Aufgrund des Zustands der Eggstrasse und den umfangreichen Werkleitungsarbeiten hat die Gemeinde Maur entschieden im Projektperimeter die Fahrbahn zu sanieren und die ebenfalls sanierungsbedürftigen Strassenentwässerungen und Kanalisationen zu ersetzen. Anfrage bei Drittwerken hat ergeben, dass die EKZ in einem Abschnitt von ca. 240m im Kulturland ebenfalls Ausbaudarf hat. Hauptmengen: Wasser Transportleitung Feumet - Hell G200, L = 1’100m, 2 Hydranten G100/ 125 (Hydrantenleitung), L = 100m Hausanschlüsse PE 50mm, 2 Stk., L = 50m KSR PE 90mm, L= 1’100m Kabelzugschächte 5 Stk. Transportleitung Feumet - Tobelstrasse G200, L = 1’100m KSR PE 90mm, L= 1’100m EKZ Rohrblock 2-lagig, L = 240m Kanalisationen Schmutzabwasserkanalisation Kontrollschächte NW 1000/600 mm 14 St. Kanalisation SBR 300 mm ca. 770 m Kanalisation HA PP DN 160 mm ca. 10 m Regenabwasserkanalisation / Strassenentwässerung Kontrollschächte NW 1000/600 mm 8 St. Strassenabläufe NW 700 mm 4 St. Kanalisation SBR NW 400 mm ca. 10 m Kanalisation SBR NW 300 mm ca. 520 m Kanalisation PP NW 250 mm ca. 5 m Kanalisation PP DN 160 mm ca. 30 m Kanalisation PP Si DN 160 mm ca. 15 m Fahrbahn Strassenbau Fläche ca. 3’900 m2 Belagsersatz ACT 22 S 9 cm und AC 8 S 3 cm Ersatz Fundationsschicht Strasse min. 50 cm Ersatz der Fahrbahnabschlüsse mit Randsteinen 200 m Belagsrand 1330 m

Official source: SIMAP ↗

Notice updates

November 5, 2026 · Version 3

Deadline information updated · Summary and analysis updated · Tender facts updated · Deadline updated · Source notice details updated · Source references updated · Status changed · Notice update added

Umbau Reservoir Feumet - Tiefbauarbeiten Eggstrasse

Bauvorhaben: Das Reservoir Feumet dient als Druckhaltung für die Zone Maur / Uessikon. Im Reservoir befindet sich das Stufenpumwerk Forch für die Belieferung der Zone Aesch / Forch (WV Maur) über die Transportleitung Feumet - Tobelstrasse und das Stufenpumpwerk Egg für die Belieferung der Zone Radrain (WV Egg) und Zone Eggstrasse (WV Maur) über die Transportleitung Feumet – Hell (Betriebsdruck bis 20bar!). Die Wasserversorgung der Gemeinde Maur und Egg saniert die alten Transportleitung ab dem Reservoir Feuemt bis zur Kreuzung Hellstrasse – Eggstrasse im Jahr 2027. Von den ca. 1’100m befindet sich ca. 350m im Kulturland und 800m in der Eggstrasse. Aufgrund des Zustands der Eggstrasse und den umfangreichen Werkleitungsarbeiten hat die Gemeinde Maur entschieden im Projektperimeter die Fahrbahn zu sanieren und die ebenfalls sanierungsbedürftigen Strassenentwässerungen und Kanalisationen zu ersetzen. Anfrage bei Drittwerken hat ergeben, dass die EKZ in einem Abschnitt von ca. 240m im Kulturland ebenfalls Ausbaudarf hat. Hauptmengen: Wasser Transportleitung Feumet - Hell G200, L = 1’100m, 2 Hydranten G100/ 125 (Hydrantenleitung), L = 100m Hausanschlüsse PE 50mm, 2 Stk., L = 50m KSR PE 90mm, L= 1’100m Kabelzugschächte 5 Stk. Transportleitung Feumet - Tobelstrasse G200, L = 1’100m KSR PE 90mm, L= 1’100m EKZ Rohrblock 2-lagig, L = 240m Kanalisationen Schmutzabwasserkanalisation Kontrollschächte NW 1000/600 mm 14 St. Kanalisation SBR 300 mm ca. 770 m Kanalisation HA PP DN 160 mm ca. 10 m Regenabwasserkanalisation / Strassenentwässerung Kontrollschächte NW 1000/600 mm 8 St. Strassenabläufe NW 700 mm 4 St. Kanalisation SBR NW 400 mm ca. 10 m Kanalisation SBR NW 300 mm ca. 520 m Kanalisation PP NW 250 mm ca. 5 m Kanalisation PP DN 160 mm ca. 30 m Kanalisation PP Si DN 160 mm ca. 15 m Fahrbahn Strassenbau Fläche ca. 3’900 m2 Belagsersatz ACT 22 S 9 cm und AC 8 S 3 cm Ersatz Fundationsschicht Strasse min. 50 cm Ersatz der Fahrbahnabschlüsse mit Randsteinen 200 m Belagsrand 1330 m

October 18, 2026 · Version 2

Classification updated

Umbau Reservoir Feumet - Tiefbauarbeiten Eggstrasse

Bauvorhaben: Das Reservoir Feumet dient als Druckhaltung für die Zone Maur / Uessikon. Im Reservoir befindet sich das Stufenpumwerk Forch für die Belieferung der Zone Aesch / Forch (WV Maur) über die Transportleitung Feumet - Tobelstrasse und das Stufenpumpwerk Egg für die Belieferung der Zone Radrain (WV Egg) und Zone Eggstrasse (WV Maur) über die Transportleitung Feumet – Hell (Betriebsdruck bis 20bar!). Die Wasserversorgung der Gemeinde Maur und Egg saniert die alten Transportleitung ab dem Reservoir Feuemt bis zur Kreuzung Hellstrasse – Eggstrasse im Jahr 2027. Von den ca. 1’100m befindet sich ca. 350m im Kulturland und 800m in der Eggstrasse. Aufgrund des Zustands der Eggstrasse und den umfangreichen Werkleitungsarbeiten hat die Gemeinde Maur entschieden im Projektperimeter die Fahrbahn zu sanieren und die ebenfalls sanierungsbedürftigen Strassenentwässerungen und Kanalisationen zu ersetzen. Anfrage bei Drittwerken hat ergeben, dass die EKZ in einem Abschnitt von ca. 240m im Kulturland ebenfalls Ausbaudarf hat. Hauptmengen: Wasser Transportleitung Feumet - Hell G200, L = 1’100m, 2 Hydranten G100/ 125 (Hydrantenleitung), L = 100m Hausanschlüsse PE 50mm, 2 Stk., L = 50m KSR PE 90mm, L= 1’100m Kabelzugschächte 5 Stk. Transportleitung Feumet - Tobelstrasse G200, L = 1’100m KSR PE 90mm, L= 1’100m EKZ Rohrblock 2-lagig, L = 240m Kanalisationen Schmutzabwasserkanalisation Kontrollschächte NW 1000/600 mm 14 St. Kanalisation SBR 300 mm ca. 770 m Kanalisation HA PP DN 160 mm ca. 10 m Regenabwasserkanalisation / Strassenentwässerung Kontrollschächte NW 1000/600 mm 8 St. Strassenabläufe NW 700 mm 4 St. Kanalisation SBR NW 400 mm ca. 10 m Kanalisation SBR NW 300 mm ca. 520 m Kanalisation PP NW 250 mm ca. 5 m Kanalisation PP DN 160 mm ca. 30 m Kanalisation PP Si DN 160 mm ca. 15 m Fahrbahn Strassenbau Fläche ca. 3’900 m2 Belagsersatz ACT 22 S 9 cm und AC 8 S 3 cm Ersatz Fundationsschicht Strasse min. 50 cm Ersatz der Fahrbahnabschlüsse mit Randsteinen 200 m Belagsrand 1330 m

October 11, 2026 · Version 1

Published

Umbau Reservoir Feumet - Tiefbauarbeiten Eggstrasse

Bauvorhaben: Das Reservoir Feumet dient als Druckhaltung für die Zone Maur / Uessikon. Im Reservoir befindet sich das Stufenpumwerk Forch für die Belieferung der Zone Aesch / Forch (WV Maur) über die Transportleitung Feumet - Tobelstrasse und das Stufenpumpwerk Egg für die Belieferung der Zone Radrain (WV Egg) und Zone Eggstrasse (WV Maur) über die Transportleitung Feumet – Hell (Betriebsdruck bis 20bar!). Die Wasserversorgung der Gemeinde Maur und Egg saniert die alten Transportleitung ab dem Reservoir Feuemt bis zur Kreuzung Hellstrasse – Eggstrasse im Jahr 2027. Von den ca. 1’100m befindet sich ca. 350m im Kulturland und 800m in der Eggstrasse. Aufgrund des Zustands der Eggstrasse und den umfangreichen Werkleitungsarbeiten hat die Gemeinde Maur entschieden im Projektperimeter die Fahrbahn zu sanieren und die ebenfalls sanierungsbedürftigen Strassenentwässerungen und Kanalisationen zu ersetzen. Anfrage bei Drittwerken hat ergeben, dass die EKZ in einem Abschnitt von ca. 240m im Kulturland ebenfalls Ausbaudarf hat. Hauptmengen: Wasser Transportleitung Feumet - Hell G200, L = 1’100m, 2 Hydranten G100/ 125 (Hydrantenleitung), L = 100m Hausanschlüsse PE 50mm, 2 Stk., L = 50m KSR PE 90mm, L= 1’100m Kabelzugschächte 5 Stk. Transportleitung Feumet - Tobelstrasse G200, L = 1’100m KSR PE 90mm, L= 1’100m EKZ Rohrblock 2-lagig, L = 240m Kanalisationen Schmutzabwasserkanalisation Kontrollschächte NW 1000/600 mm 14 St. Kanalisation SBR 300 mm ca. 770 m Kanalisation HA PP DN 160 mm ca. 10 m Regenabwasserkanalisation / Strassenentwässerung Kontrollschächte NW 1000/600 mm 8 St. Strassenabläufe NW 700 mm 4 St. Kanalisation SBR NW 400 mm ca. 10 m Kanalisation SBR NW 300 mm ca. 520 m Kanalisation PP NW 250 mm ca. 5 m Kanalisation PP DN 160 mm ca. 30 m Kanalisation PP Si DN 160 mm ca. 15 m Fahrbahn Strassenbau Fläche ca. 3’900 m2 Belagsersatz ACT 22 S 9 cm und AC 8 S 3 cm Ersatz Fundationsschicht Strasse min. 50 cm Ersatz der Fahrbahnabschlüsse mit Randsteinen 200 m Belagsrand 1330 m