Feumet reservoir conversion: pipeline works

Gemeinde Maur - TiefbauSwitzerlandClosed

Outcome

Submissions closed on 3 November 2026. No award has been published yet. Open tenders like this one are listed below.

Place
Maur, canton of Zurich
Submission deadline: 2026-11-03T10:00:00+01:00
09:00 AM · UTC
Contract value
Not stated in the notice
Classification
Construction and civil works
Published
October 5, 2026
SIMAP

Overview

The Municipality of Maur is tendering buried water pipelines and connections serving the Feumet reservoir and the Maur and Egg supply zones. The notice describes several transport routes, reservoir outlets and a spring line, with approximate pipe lengths and diameters. Operating pressure reaches 24.3 bar on one route and 19.3 bar on another. Pipes, fittings and thrust restraints must be designed and installed to PN 25, apart from the stated hydrant and house connection exceptions. The offer deadline has passed.

Information based on the public notice

What the buyer needs

Construction of buried water transport and distribution pipelines, reservoir outlets and a spring line connected to the Feumet reservoir system. Approximate lengths and pipe diameters are specified in the public description.

  • Use PN 25 for all pipes, fittings and thrust restraints, except the hydrant and house connections after the pressure-reduction chamber.
  • Variants and partial offers are not permitted.

Tender details

Buyer
Gemeinde Maur - Tiefbau
Country
Switzerland
Procedure
open
Classification
Construction and civil works · CPV 45232150
Notice reference
45002 · 45002-01
Operating pressure
Up to 24.3 bar on the Feumet to Hell route and 19.3 bar on the Feumet to Tobelstrasse route
Pipe specification
PN 25 is required, subject to the stated hydrant and house connection exceptions
Offer deadline
3 November 2026 at 10:00 CET (UTC+01:00)

What to check in the tender documents

  • The public notice does not state an estimated contract value or detailed qualification criteria.
Get started with Ziva

Original notice

Read the original description

Umbau Reservoir Feumet - Rohrleitungsbau

Umbau Reservoir Feumet - Rohrleitungsbau Bauvorhaben: Das Reservoir Feumet dient als Druckhaltung für die Zone Maur / Uessikon. Im Reservoir befindet sich das Stufenpumwerk Forch für die Belieferung der Zone Aesch / Forch (WV Maur) über die Transportleitung Feumet - Tobelstrasse und das Stufenpumpwerk Egg für die Belieferung der Zone Radrain (WV Egg) und Zone Eggstrasse (WV Maur) über die Transportleitung Feumet - Hell. Der Fliessdruck beträgt im Pumpbetrieb in der Transportleitung bis zu 24.3 bar (Transportleitung Feumet - Hell) bzw. 19.3 (Transportleitung Feumet - Tobelstrasse). Sämtliche Leitungen, Formstücke und Schubsicherungen (exkl. Hydrant und Hausanschlüsse nach Druckreduktionssschacht) sind daher zwingend in der Ausführungsvariane PN 25 einzurechnen und auszuführen! Die Formstücke TMH BLS F und EU Formstücke sind nicht lagernd bei Herstellern und haben lange Lieferfristen. Bei Auftragsvergabe sind die entsprechenden Formstücke sich rechtzeitig zu zusichern. Hauptmengen: Transport-/ Erschliessungsleitung - Transportleitung Feumet - Hell (Eggstrasse): ca. 100 m G ø 100/125mm + ca. 1'200m G ø 200mm - Transportleitung Feumet - Tobelstrasse (Eggstrasse): ca. 1'100 m G ø 200mm - Transportleitung Feumet - Tobelstrasse (Hellstrasse): ca. 540 m G ø 200mm - Reservoirableitung Feumet 1: ca. 125 m G ø 200mm - Reservoirableitung Feumet 2: ca. 125 m G ø 200mm - Quellleitung: ca. 80m PE ø 90mm Hydranten 2 Stück Hausanschlüsse 2 Stück PE50, L = 50m Official notice title: Umbau Reservoir Feumet - Rohrleitungsbau Description of the procurement: Bauvorhaben: Das Reservoir Feumet dient als Druckhaltung für die Zone Maur / Uessikon. Im Reservoir befindet sich das Stufenpumwerk Forch für die Belieferung der Zone Aesch / Forch (WV Maur) über die Transportleitung Feumet - Tobelstrasse und das Stufenpumpwerk Egg für die Belieferung der Zone Radrain (WV Egg) und Zone Eggstrasse (WV Maur) über die Transportleitung Feumet - Hell. Der Fliessdruck beträgt im Pumpbetrieb in der Transportleitung bis zu 24.3 bar (Transportleitung Feumet - Hell) bzw. 19.3 (Transportleitung Feumet - Tobelstrasse). Sämtliche Leitungen, Formstücke und Schubsicherungen (exkl. Hydrant und Hausanschlüsse nach Druckreduktionssschacht) sind daher zwingend in der Ausführungsvariane PN 25 einzurechnen und auszuführen! Die Formstücke TMH BLS F und EU Formstücke sind nicht lagernd bei Herstellern und haben lange Lieferfristen. Bei Auftragsvergabe sind die entsprechenden Formstücke sich rechtzeitig zu zusichern. Hauptmengen: Transport-/ Erschliessungsleitung - Transportleitung Feumet - Hell (Eggstrasse): ca. 100 m G ø 100/125mm + ca. 1'200m G ø 200mm - Transportleitung Feumet - Tobelstrasse (Eggstrasse): ca. 1'100 m G ø 200mm - Transportleitung Feumet - Tobelstrasse (Hellstrasse): ca. 540 m G ø 200mm - Reservoirableitung Feumet 1: ca. 125 m G ø 200mm - Reservoirableitung Feumet 2: ca. 125 m G ø 200mm - Quellleitung: ca. 80m PE ø 90mm Hydranten 2 Stück Hausanschlüsse 2 Stück PE50, L = 50m Execution notes: None Extension options: None Variants: no Partial offers: no Publication date: 2026-10-06 Offer deadline: 2026-11-03T10:00:00+01:00 Offer validity through: 2027-02-28 Submission requirements: None Document availability: 2026-10-06 Document availability: 2026-10-20 Consortium bids: not_specified Subcontractors: not_specified Qualification criteria location: yes Award criteria location: criteria_in_documents Procurement office: Gemeinde Maur - Tiefbau Procurement office telephone: +41433661396 Functional procurement mailbox: hanspeter.bislin@maur.ch

Official source: SIMAP ↗

Notice updates

November 6, 2026 · Version 4

Deadline information updated · Summary and analysis updated · Tender facts updated · Original notice updated · Deadline updated · Location updated · Source notice details updated · Source references updated · Status changed

Umbau Reservoir Feumet - Rohrleitungsbau

Umbau Reservoir Feumet - Rohrleitungsbau Bauvorhaben: Das Reservoir Feumet dient als Druckhaltung für die Zone Maur / Uessikon. Im Reservoir befindet sich das Stufenpumwerk Forch für die Belieferung der Zone Aesch / Forch (WV Maur) über die Transportleitung Feumet - Tobelstrasse und das Stufenpumpwerk Egg für die Belieferung der Zone Radrain (WV Egg) und Zone Eggstrasse (WV Maur) über die Transportleitung Feumet - Hell. Der Fliessdruck beträgt im Pumpbetrieb in der Transportleitung bis zu 24.3 bar (Transportleitung Feumet - Hell) bzw. 19.3 (Transportleitung Feumet - Tobelstrasse). Sämtliche Leitungen, Formstücke und Schubsicherungen (exkl. Hydrant und Hausanschlüsse nach Druckreduktionssschacht) sind daher zwingend in der Ausführungsvariane PN 25 einzurechnen und auszuführen! Die Formstücke TMH BLS F und EU Formstücke sind nicht lagernd bei Herstellern und haben lange Lieferfristen. Bei Auftragsvergabe sind die entsprechenden Formstücke sich rechtzeitig zu zusichern. Hauptmengen: Transport-/ Erschliessungsleitung - Transportleitung Feumet - Hell (Eggstrasse): ca. 100 m G ø 100/125mm + ca. 1'200m G ø 200mm - Transportleitung Feumet - Tobelstrasse (Eggstrasse): ca. 1'100 m G ø 200mm - Transportleitung Feumet - Tobelstrasse (Hellstrasse): ca. 540 m G ø 200mm - Reservoirableitung Feumet 1: ca. 125 m G ø 200mm - Reservoirableitung Feumet 2: ca. 125 m G ø 200mm - Quellleitung: ca. 80m PE ø 90mm Hydranten 2 Stück Hausanschlüsse 2 Stück PE50, L = 50m Official notice title: Umbau Reservoir Feumet - Rohrleitungsbau Description of the procurement: Bauvorhaben: Das Reservoir Feumet dient als Druckhaltung für die Zone Maur / Uessikon. Im Reservoir befindet sich das Stufenpumwerk Forch für die Belieferung der Zone Aesch / Forch (WV Maur) über die Transportleitung Feumet - Tobelstrasse und das Stufenpumpwerk Egg für die Belieferung der Zone Radrain (WV Egg) und Zone Eggstrasse (WV Maur) über die Transportleitung Feumet - Hell. Der Fliessdruck beträgt im Pumpbetrieb in der Transportleitung bis zu 24.3 bar (Transportleitung Feumet - Hell) bzw. 19.3 (Transportleitung Feumet - Tobelstrasse). Sämtliche Leitungen, Formstücke und Schubsicherungen (exkl. Hydrant und Hausanschlüsse nach Druckreduktionssschacht) sind daher zwingend in der Ausführungsvariane PN 25 einzurechnen und auszuführen! Die Formstücke TMH BLS F und EU Formstücke sind nicht lagernd bei Herstellern und haben lange Lieferfristen. Bei Auftragsvergabe sind die entsprechenden Formstücke sich rechtzeitig zu zusichern. Hauptmengen: Transport-/ Erschliessungsleitung - Transportleitung Feumet - Hell (Eggstrasse): ca. 100 m G ø 100/125mm + ca. 1'200m G ø 200mm - Transportleitung Feumet - Tobelstrasse (Eggstrasse): ca. 1'100 m G ø 200mm - Transportleitung Feumet - Tobelstrasse (Hellstrasse): ca. 540 m G ø 200mm - Reservoirableitung Feumet 1: ca. 125 m G ø 200mm - Reservoirableitung Feumet 2: ca. 125 m G ø 200mm - Quellleitung: ca. 80m PE ø 90mm Hydranten 2 Stück Hausanschlüsse 2 Stück PE50, L = 50m Execution notes: None Extension options: None Variants: no Partial offers: no Publication date: 2026-10-06 Offer deadline: 2026-11-03T10:00:00+01:00 Offer validity through: 2027-02-28 Submission requirements: None Document availability: 2026-10-06 Document availability: 2026-10-20 Consortium bids: not_specified Subcontractors: not_specified Qualification criteria location: yes Award criteria location: criteria_in_documents Procurement office: Gemeinde Maur - Tiefbau Procurement office telephone: +41433661396 Functional procurement mailbox: hanspeter.bislin@maur.ch

October 20, 2026 · Version 3

Classification updated

Umbau Reservoir Feumet - Rohrleitungsbau

Umbau Reservoir Feumet - Rohrleitungsbau Bauvorhaben: Das Reservoir Feumet dient als Druckhaltung für die Zone Maur / Uessikon. Im Reservoir befindet sich das Stufenpumwerk Forch für die Belieferung der Zone Aesch / Forch (WV Maur) über die Transportleitung Feumet - Tobelstrasse und das Stufenpumpwerk Egg für die Belieferung der Zone Radrain (WV Egg) und Zone Eggstrasse (WV Maur) über die Transportleitung Feumet - Hell. Der Fliessdruck beträgt im Pumpbetrieb in der Transportleitung bis zu 24.3 bar (Transportleitung Feumet - Hell) bzw. 19.3 (Transportleitung Feumet - Tobelstrasse). Sämtliche Leitungen, Formstücke und Schubsicherungen (exkl. Hydrant und Hausanschlüsse nach Druckreduktionssschacht) sind daher zwingend in der Ausführungsvariane PN 25 einzurechnen und auszuführen! Die Formstücke TMH BLS F und EU Formstücke sind nicht lagernd bei Herstellern und haben lange Lieferfristen. Bei Auftragsvergabe sind die entsprechenden Formstücke sich rechtzeitig zu zusichern. Hauptmengen: Transport-/ Erschliessungsleitung - Transportleitung Feumet - Hell (Eggstrasse): ca. 100 m G ø 100/125mm + ca. 1'200m G ø 200mm - Transportleitung Feumet - Tobelstrasse (Eggstrasse): ca. 1'100 m G ø 200mm - Transportleitung Feumet - Tobelstrasse (Hellstrasse): ca. 540 m G ø 200mm - Reservoirableitung Feumet 1: ca. 125 m G ø 200mm - Reservoirableitung Feumet 2: ca. 125 m G ø 200mm - Quellleitung: ca. 80m PE ø 90mm Hydranten 2 Stück Hausanschlüsse 2 Stück PE50, L = 50m

October 20, 2026 · Version 2

Buyer updated

Umbau Reservoir Feumet - Rohrleitungsbau

Umbau Reservoir Feumet - Rohrleitungsbau Bauvorhaben: Das Reservoir Feumet dient als Druckhaltung für die Zone Maur / Uessikon. Im Reservoir befindet sich das Stufenpumwerk Forch für die Belieferung der Zone Aesch / Forch (WV Maur) über die Transportleitung Feumet - Tobelstrasse und das Stufenpumpwerk Egg für die Belieferung der Zone Radrain (WV Egg) und Zone Eggstrasse (WV Maur) über die Transportleitung Feumet - Hell. Der Fliessdruck beträgt im Pumpbetrieb in der Transportleitung bis zu 24.3 bar (Transportleitung Feumet - Hell) bzw. 19.3 (Transportleitung Feumet - Tobelstrasse). Sämtliche Leitungen, Formstücke und Schubsicherungen (exkl. Hydrant und Hausanschlüsse nach Druckreduktionssschacht) sind daher zwingend in der Ausführungsvariane PN 25 einzurechnen und auszuführen! Die Formstücke TMH BLS F und EU Formstücke sind nicht lagernd bei Herstellern und haben lange Lieferfristen. Bei Auftragsvergabe sind die entsprechenden Formstücke sich rechtzeitig zu zusichern. Hauptmengen: Transport-/ Erschliessungsleitung - Transportleitung Feumet - Hell (Eggstrasse): ca. 100 m G ø 100/125mm + ca. 1'200m G ø 200mm - Transportleitung Feumet - Tobelstrasse (Eggstrasse): ca. 1'100 m G ø 200mm - Transportleitung Feumet - Tobelstrasse (Hellstrasse): ca. 540 m G ø 200mm - Reservoirableitung Feumet 1: ca. 125 m G ø 200mm - Reservoirableitung Feumet 2: ca. 125 m G ø 200mm - Quellleitung: ca. 80m PE ø 90mm Hydranten 2 Stück Hausanschlüsse 2 Stück PE50, L = 50m

October 11, 2026 · Version 1

Published

Umbau Reservoir Feumet - Rohrleitungsbau

Umbau Reservoir Feumet - Rohrleitungsbau Bauvorhaben: Das Reservoir Feumet dient als Druckhaltung für die Zone Maur / Uessikon. Im Reservoir befindet sich das Stufenpumwerk Forch für die Belieferung der Zone Aesch / Forch (WV Maur) über die Transportleitung Feumet - Tobelstrasse und das Stufenpumpwerk Egg für die Belieferung der Zone Radrain (WV Egg) und Zone Eggstrasse (WV Maur) über die Transportleitung Feumet - Hell. Der Fliessdruck beträgt im Pumpbetrieb in der Transportleitung bis zu 24.3 bar (Transportleitung Feumet - Hell) bzw. 19.3 (Transportleitung Feumet - Tobelstrasse). Sämtliche Leitungen, Formstücke und Schubsicherungen (exkl. Hydrant und Hausanschlüsse nach Druckreduktionssschacht) sind daher zwingend in der Ausführungsvariane PN 25 einzurechnen und auszuführen! Die Formstücke TMH BLS F und EU Formstücke sind nicht lagernd bei Herstellern und haben lange Lieferfristen. Bei Auftragsvergabe sind die entsprechenden Formstücke sich rechtzeitig zu zusichern. Hauptmengen: Transport-/ Erschliessungsleitung - Transportleitung Feumet - Hell (Eggstrasse): ca. 100 m G ø 100/125mm + ca. 1'200m G ø 200mm - Transportleitung Feumet - Tobelstrasse (Eggstrasse): ca. 1'100 m G ø 200mm - Transportleitung Feumet - Tobelstrasse (Hellstrasse): ca. 540 m G ø 200mm - Reservoirableitung Feumet 1: ca. 125 m G ø 200mm - Reservoirableitung Feumet 2: ca. 125 m G ø 200mm - Quellleitung: ca. 80m PE ø 90mm Hydranten 2 Stück Hausanschlüsse 2 Stück PE50, L = 50m