New HOA/FBOA 128.2a and 128.3a installation on rail line 2270

Outcome

Submissions closed on 22 October 2026. No award has been published yet. Open tenders like this one are listed below.

Place
Railway line 2270 near kilometre 7.321, Oberhausen, Germany
Offer deadline: 22 October 2026 at 10:00 local time (08:00 UTC)
08:00 AM · UTC
Contract value
Not stated in the notice
Lots
1 lot
Classification
Railway track monitoring installation works
Published
September 28, 2026
Official German eForms notice / DB InfraGO trackside installation works

Overview

DB InfraGO is tendering advance design and construction work for a new double HOA/FBOA installation on the ABS 46/2 Emmerich–Oberhausen project. The installation will initially monitor two existing tracks and must allow a later third-track installation; the existing equipment is to be dismantled after commissioning. Offers are due 22 October 2026 at 10:00 local time (08:00 UTC).

Information based on the public notice

What the buyer needs

Build and plan a new double installation for two existing tracks, allow later expansion for a third track, and remove existing equipment after commissioning.

  • The official notice API provides the offer deadline; electronic submission and other terms are not included in the available notice description.

Lots

LOT-0000 ·ABS 46/2 Emmerich-Oberhausen - BA1b: Neubau HOA 128.2a & 128.3a (Strecke 2270)

Tender details

Buyer
DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)
Country
Germany
Procedure
de-open
Classification
Railway track monitoring installation works · CPV 45351000
Notice reference
ocds-mnwr74-25875498
Scope
Build and plan a new double installation for two existing tracks, allow later expansion for a third track, and remove existing equipment after commissioning.
Deadline
22 October 2026 at 10:00 local time (08:00 UTC).

What to check in the tender documents

  • The notice links to the buyer portal for detailed procurement documents; those documents were not opened.
Get started with Ziva

Original notice

Read the original description

ABS 46/2 Emmerich-Oberhausen - BA1b: Neubau HOA 128.2a & 128.3a (Strecke 2270)

Im Rahmen des dreigleisigen Ausbaus des Projekts ABS 46/2 Emmerich-Oberhausen soll eine neue HOA/FBOA 128.1a, 128.2a & 128.3a bei km 7,321 an der Strecke 2270 gebaut werden. Diese soll die Altanlage bei km 7,020 ersetzen, um so Baufreiheit für das neue dritte Gleis zu erlangen. Die neue HOA/FBOA 128.1a, 128.2a & 128.3a soll bautechnisch zunächst nur an die Bestandsgleise angebunden werden. Dementsprechend wird hiermit nur die HOA/FBOA 128.2a & 128.3a als Doppelanlage für die Überwachung von 2 bestehenden Gleise ausgeschrieben. Wichtig ist aber, dass das BSH und weitere Komponente so gebaut werden, dass diese noch später um die HOA/FBOA 128.1a als Einzelanlage für die Überwachung des dritten Gleises ("Neues Gleis") erweitert werden können. Des Weiteren muss nach erfolgreicher Inbetriebnahme die Altanlage (HOA/FBOA 128.1a/128.2a bei km 7,020) zurückgebaut werden. Für die beschriebenen Arbeiten muss vorab eine Ausführungsplanung erstellt werden. ABS 46/2 Emmerich-Oberhausen - BA1b: Neubau HOA 128.2a & 128.3a (Strecke 2270)

Official source: Official German eForms notice / DB InfraGO trackside installation works ↗