800 MHz niobium superconducting radiofrequency cavities

CERNSwitzerlandOpen
Buyer
CERN
Place
CERN, Geneva, Switzerland
Submission deadline
Not available
Contract value
Not stated in the notice
Contract period
Bare cavities are expected by the end of 2028 and dressed cavities by the end of 2029.
Published
April 9, 2026
CERN forthcoming tendering procedures

Overview

CERN seeks six 6-cell and six simplified 1-cell 800 MHz niobium superconducting radiofrequency cavities for the FCC electron-positron collider study. The notice anticipates delivery of bare cavities by the end of 2028 and dressed cavities by the end of 2029. Suppliers need experience in multicell niobium cavity fabrication and preparation, clean-room assembly, pressure equipment up to PED Category I, precision half-cell forming and welding, and radiofrequency performance. The estimated range is CHF 400,000–1.5 million; an invitation to tender was estimated for February 2027.

Information based on the public notice

What the buyer needs

Supply of twelve 800 MHz niobium superconducting radiofrequency cavities for the FCCee study: six 6-cell cavities and six simplified 1-cell cavities.

  • Multicell niobium cavity fabrication and surface preparation; clean-room assembly; PED 2014/68/EU Category I pressure equipment; half-cell shaping and welding; specified RF frequency and field flatness.

Tender details

Buyer
CERN
Country
Switzerland
Procedure
Invitation to Tender
Classification
Electrical and electronic equipment
Notice reference
MS-5176/SY/FCC
Scope
CERN seeks six 6-cell and six simplified 1-cell 800 MHz niobium superconducting radiofrequency cavities for the FCC electron-positron collider study. The notice anticipates delivery of bare cavities by the end of 2028 and dressed cavities by the end of 2029. Suppliers need experience in multicell niobium cavity fabrication and preparation, clean-room assembly, pressure equipment up to PED Category I, precision half-cell forming and welding, and radiofrequency performance. The estimated range is CHF 400,000–1.5 million; an invitation to tender was estimated for February 2027.
Key fact
Twelve 800 MHz niobium superconducting RF cavities: six 6-cell and six 1-cell units. · Experience in niobium cavity fabrication and treatment, clean-room assembly, PED Category I equipment, precision welding and RF testing. · Estimated cost range: CHF 400,000–1.5 million. · Bare cavities expected by end-2028; dressed cavities by end-2029. Invitation to tender estimated February 2027.

What to check in the tender documents

  • No submission deadline, evaluation criteria or detailed contractual terms are stated in the available notice text.
Get started with Ziva

Original notice

Read the original description

Supply of six 6-Cell and six 1-Cell 800 MHz Niobium Superconducting Radiofrequency Cavities for FCCee study.

Supply of six 6-Cell and six 1-Cell 800 MHz Niobium Superconducting Radiofrequency Cavities for FCCee study. CERN intends to place a contract for the supply of six 800 MHz 6-Cell Niobium Superconducting Radiofrequency (Nb SRF) Cavities and six "simplified" 800 MHz 1-Cell Nb SRF Cavities for the FCCee Study. The bare and dressed cavities are expected to be delivered by end of 2028 and 2029, respectively. Interested firms shall have a proven experience and competence in (1) fabrication of multicell superconducting radiofrequency cavities from bulk niobium; (2) surface preparation of bulk niobium superconducting cavities, including chemical treatment and heat treatment; (3) clean room assembly of superconducting radiofrequency cavities; (4) manufacturing and testing of pressure equipment up to Category I in accordance with the EU Pressure Equipment Directive (PED 2014/68/EU); (5) Shaping and welding of elliptical half-cells from 500 mm diameter niobium discs, with a shape accuracy of ?0.3 mm; and (6) Achieving a resonant frequency within ?0.1 MHz and field flatness above 95% on elliptical multicell SRF cavities. Estimated cost range: 400k - 1.5M CHF Procedure stage: Market Survey; next step (estimated): Invitation to Tender 02/2027

Official source: CERN forthcoming tendering procedures ↗

Notice updates

October 22, 2026 · Version 2

Contract period updated · Summary and analysis updated · Tender facts updated · Original notice updated · Source notice details updated · Source references updated

Supply of six 6-Cell and six 1-Cell 800 MHz Niobium Superconducting Radiofrequency Cavities for FCCee study.

Supply of six 6-Cell and six 1-Cell 800 MHz Niobium Superconducting Radiofrequency Cavities for FCCee study. CERN intends to place a contract for the supply of six 800 MHz 6-Cell Niobium Superconducting Radiofrequency (Nb SRF) Cavities and six "simplified" 800 MHz 1-Cell Nb SRF Cavities for the FCCee Study. The bare and dressed cavities are expected to be delivered by end of 2028 and 2029, respectively. Interested firms shall have a proven experience and competence in (1) fabrication of multicell superconducting radiofrequency cavities from bulk niobium; (2) surface preparation of bulk niobium superconducting cavities, including chemical treatment and heat treatment; (3) clean room assembly of superconducting radiofrequency cavities; (4) manufacturing and testing of pressure equipment up to Category I in accordance with the EU Pressure Equipment Directive (PED 2014/68/EU); (5) Shaping and welding of elliptical half-cells from 500 mm diameter niobium discs, with a shape accuracy of ?0.3 mm; and (6) Achieving a resonant frequency within ?0.1 MHz and field flatness above 95% on elliptical multicell SRF cavities. Estimated cost range: 400k - 1.5M CHF Procedure stage: Market Survey; next step (estimated): Invitation to Tender 02/2027

October 17, 2026 · Version 1

Published

Supply of six 6-Cell and six 1-Cell 800 MHz Niobium Superconducting Radiofrequency Cavities for FCCee study.

Supply of six 6-Cell and six 1-Cell 800 MHz Niobium Superconducting Radiofrequency Cavities for FCCee study. CERN intends to place a contract for the supply of six 800 MHz 6-Cell Niobium Superconducting Radiofrequency (Nb SRF) Cavities and six "simplified" 800 MHz 1-Cell Nb SRF Cavities for the FCCee Study. The bare and dressed cavities are expected to be delivered by end of 2028 and 2029, respectively. Interested firms shall have a proven experience and competence in (1) fabrication of multicell superconducting radiofrequency cavities from bulk niobium; (2) surface preparation of bulk niobium superconducting cavities, including chemical treatment and heat treatment; (3) clean room assembly of superconducting radiofrequency cavities; (4) manufacturing and testing of pressure equipment up to Category I in accordance with the EU Pressure Equipment Directive (PED 2014/68/EU); (5) Shaping and welding of elliptical half-cells from 500 mm diameter niobium discs, with a shape accuracy of ?0.3 mm; and (6) Achieving a resonant frequency within ?0.1 MHz and field flatness above 95% on elliptical multicell SRF cavities. Estimated cost range: 400k - 1.5M CHF Procedure stage: Market Survey; next step (estimated): Invitation to Tender 09/2026