Conversion of classrooms into an inclusive learning resource centre with solar power
Outcome
Submissions closed on 27 October 2026. No award has been published yet. Open tenders like this one are listed below.
- Place
- Location not stated
- 27 Oct 2026 at 09:00, timezone not stated
- Time not stated
- Contract value
- Not stated in the notice
- Lots
- 1 lot
- Classification
- School facility construction
- Published
- October 5, 2026
- official_notice_html
Overview
The Department of Education Division of La Union invites bids to convert seven classrooms at Balaoan Central School into a prototype Inclusive Learning Resource Center with a 16 kW hybrid solar PV system. PhilGEPS shows a single-lot civil-works invitation, a stated delivery period of 120 (unit not specified), and a bid-validity period of 120 days. Its page separately shows a line-item description for rehabilitation of a different school in Tanglag, creating a material project-description discrepancy. The page lists an approved contract budget of 8,630,321.90 and a bid-form fee of 10,000, with no currency label. Bid closing is 27 October 2026 at 09:00; timezone is not stated.
Information based on the public notice
Ask about this tender
What the buyer needs
Convert seven classrooms at Balaoan Central School into a prototype inclusive learning resource center and install a 16 kW hybrid solar PV energy system, as stated in the invitation title. The page’s separate line-item description refers to a different rehabilitation project at Tanglag Elementary School.
Lots
1 ·Single lot
Tender details
- Buyer
- Department of Education, Division of La Union
- Country
Philippines
- Procedure
- Competitive Bidding (Public Bidding)
- Classification
- School facility construction
- Notice reference
- 93184 · 93184; control number 260311
- Project named in invitation
- Seven-classroom inclusive learning resource center with a 16 kW hybrid solar PV system at Balaoan Central School
- Page discrepancy
- Line-item description names rehabilitation of a different school at Tanglag
- Approved contract budget
- 8,630,321.90; currency not stated
- Bid-form fee
- 10,000; currency not stated
- Bid closing
- 27 Oct 2026, 09:00; timezone not stated
What to check in the tender documents
- The public page gives conflicting project descriptions for the invitation and line item; the underlying documents were not opened.
- The currency of the approved budget and bid-form fee is not stated.
- The timezone for the 09:00 closing time and the unit for the 120 delivery-period figure are not stated.
- Detailed construction specifications and qualification requirements are not available in the notice text captured here.
Original notice
Read the original description
PROPOSED CONVERSION OF SEVEN (7) CLASSROOM INTO PROTOTYPE INCLUSIVE LEARNING RESOURCE CENTER with 16KW HYBRID SOLAR PV ENERGY SYSTEM AT BALAOAN CENTRAL SCHOOL
Official source: official_notice_html ↗
https://philgeps.gov.ph/Indexes/viewLiveTenderDetails/93184/OPEN_MORE
Source retrieved: 2026-10-14T01:55:21.277200Z