Cupang River downstream flood control structure, Antipolo City

Outcome

Submissions closed on 28 October 2026. No award has been published yet. Open tenders like this one are listed below.

Place
Philippines
28 October 2026 at 02:00 UTC (canonical record)
02:00 AM · UTC
Contract value
Not stated in the notice
Classification
Civil Works - Infra Project
Published
October 8, 2026
PhilGEPS — Department of Public Works and Highways

Overview

The Department of Public Works and Highways, Rizal 1st Engineering District, lists project 27DN0033 under the FY 2027 DPWH infrastructure program. It concerns construction of a flood control structure on the downstream Cupang River reach from station 01+779 to station 02+239 in Barangay Cupang, Antipolo City, Rizal, Second District. The project is categorized as civil infrastructure works and competitive public bidding. The available notice information marks it open and gives a submission deadline of 28 October 2026 at 02:00 UTC. The official PhilGEPS detail page timed out during this review; engineering specifications, quantities, budget, eligibility and bid submission conditions remain unavailable.

Information based on the public notice

What the buyer needs

Construction of the specified flood control structure on the downstream Cupang River reach, as part of the FY 2027 flood management infrastructure program.

Tender details

Buyer
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - RIZAL 1ST ED
Country
Philippines
Procedure
Competitive Bidding (Public Bidding)
Classification
Not stated in the notice
Notice reference
97179
Project
27DN0033 — flood control structure on the downstream Cupang River, stations 01+779 to 02+239
Deadline
28 October 2026, 02:00 UTC

What to check in the tender documents

  • The official PhilGEPS detail page timed out. Detailed engineering specifications, quantities, estimated project cost, eligibility and qualification requirements, bid security, submission procedure and evaluation criteria could not be verified.
Get started with Ziva

Original notice

Read the original description

27DN0033 FY 2027 DPWH INFRASTRUCTURE PROGRAM - ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CUPANG RIVER (DOWNSTREAM), STA 01+779 - STA 02+239, BARANGAY CUPANG, ANTIPOLO CITY, RIZAL (SECOND DISTRICT)

Not stated in the notice

Official source: PhilGEPS — Department of Public Works and Highways ↗