Fort Lee Vehicle Recovery Range
Outcome
Submissions closed on 13 October 2026. No award has been published yet. Open tenders like this one are listed below.
- Place
- Fort Lee, Virginia, United States
- Offer deadline: 13 October 2026 at 2:00 p.m. EDT (America/New_York).
- 06:00 PM · UTC
- Contract value
- Not stated in the notice
- Classification
- service
- Published
- September 29, 2026
- SAM.gov public contract opportunity notice
Overview
The U.S. Army Corps of Engineers notice seeks construction of 24 concrete turning pads at Fort Lee, with associated site drainage and road alignment or repair. Work is divided into three sequential phases, with access to one phase at a time; phases two and three are options. The description notes that Army training continues in the other phases during construction. SAM.gov reports the notice as Published, although its stated offer deadline, 13 October 2026 at 2:00 p.m. EDT, has passed. The notice is an 8(a) set-aside. It points to an amendment for final drawings and specifications; those files were not accessed. No award or contract value is stated in the available public description.
Information based on the public notice
Ask about this tender
What the buyer needs
Construction of 24 concrete turning pads with drainage and road alignment or repair, sequenced in three phases. Later phases are options, and Army training will occur in the two phases not under construction.
- The notice identifies the procurement as an 8(a) set-aside (SAM.gov code 8A).
- The published description says Amendment 0007 extends the bid due date and bid opening date; the amendment itself was not opened.
Tender details
- Buyer
- U.S. Army Corps of Engineers, Norfolk District
- Country
United States
- Procedure
- Solicitation
- Classification
- NAICS 236220; PSC Y1PZ
- Notice reference
- e8e4f924d1a24c9caed278e399469e4c · W9123626BA006
- Notice ID
- W9123626BA006
- Set-aside
- 8(a) set-aside (SAM.gov code 8A)
- Response deadline
- 13 October 2026 at 2:00 p.m. EDT (America/New_York), equivalent to the canonical 18:00 UTC timestamp
What to check in the tender documents
- The notice references final drawings and specifications and an Amendment 0007 attachment, but those separate files were not accessed.
- The public description does not state a contract value, award result, detailed evaluation criteria, or the submission method.
- SAM.gov reports the notice as Published although its stated response deadline has passed.
Original notice
Read the original description
Fort Lee Vehicle Recovery Range
Official source: SAM.gov public contract opportunity notice ↗
Notice updates
October 16, 2026 · Version 3
Buyer updated · Deadline information updated · Summary and analysis updated · Tender facts updated · Original notice updated · Deadline updated · Location updated · Source updated · Source notice details updated · Source references updated · Status changed · Notice update added
Fort Lee Vehicle Recovery Range
Note: Please see amendment 0006 for the final drawings and specifications. Amendment 0007: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0007, extending the bid due date and bid opening date. The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.
October 12, 2026 · Version 2
Deadline information updated · Summary and analysis updated · Tender facts updated · Original notice updated · Deadline updated · Source references updated
Fort Lee Vehicle Recovery Range
Note: Please see amendment 0006 for the final drawings and specifications. Amendment 0007: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0007, extending the bid due date and bid opening date. The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.
October 12, 2026 · Version 1
Published
Fort Lee Vehicle Recovery Range
https://sam.gov/opp/e8e4f924d1a24c9caed278e399469e4c/view