Heating system renewal at Schulhaus Rüterwis, Zollikerberg

Gemeinde ZollikonSwitzerlandClosed

Outcome

Submissions closed on 23 October 2026. No award has been published yet. Open tenders like this one are listed below.

Place
Zollikerberg, canton of Zurich
23 October 2026 at 14:00 CEST (UTC+02:00)
12:00 PM · UTC
Contract value
Not stated in the notice
Contract period
Stated contract period: 1 January to 31 December 2027. The contract duration may continue until the works are fully performed.
Published
October 2, 2026
SIMAP

Overview

SIMAP marks this tender closed. The stated deadline was 23 October 2026 at 14:00 CEST (UTC+02:00). The works cover complete renewal of energy generation and heating at Schulhaus Rüterwis, including four brine-to-water heat pumps totaling 260 kW, a 400 kW gas peak-load boiler, distribution equipment, a heat pump for Building G, hot-water heater replacements, ventilation, insulation and dismantling. Consortia and partial offers are not permitted; subcontracting and variants are permitted.

Information based on the public notice

What the buyer needs

Complete renewal of the energy-generation and heating systems at Schulhaus Rüterwis, including four brine-to-water heat pumps totaling 260 kW connected to a borehole field with PVT regeneration; a 400 kW gas peak-load boiler; storage, pressure maintenance, substations and district heating pipes; an air-to-water heat pump for Building G; replacement domestic hot-water heaters; emergency ventilation; insulation; and dismantling.

  • The source snapshot marks the notice closed; the published offer deadline was 23 October 2026 at 14:00 CEST (UTC+02:00).
  • Consortia are not permitted; subcontractors are permitted.
  • Partial offers are not permitted; variants are permitted.
  • No site visit is planned. Offers must remain valid through 11 May 2027.
  • Qualification and award criteria are specified in the tender documents; detailed criteria and estimated contract value are not stated in the public notice.

Tender details

Buyer
Gemeinde Zollikon
Country
Switzerland
Procedure
open
Classification
Construction and civil works · CPV 45331000
Notice reference
45314 · 45314-01
Offer deadline
23 October 2026 at 14:00 CEST (UTC+02:00)
Scope
Complete renewal of the energy-generation and heating systems at Schulhaus Rüterwis, including four brine-to-water heat pumps totaling 260 kW connected to a borehole field with PVT regeneration; a 400 kW gas peak-load boiler; storage, pressure maintenance, substations and district heating pipes; an air-to-water heat pump for Building G; replacement domestic hot-water heaters; emergency ventilation; insulation; and dismantling.
Execution period
1 January to 17 September 2027
Contract period
1 January to 31 December 2027; may continue until full performance
Lifecycle status
Closed in the current leased SIMAP snapshot

What to check in the tender documents

  • The detailed qualification and award criteria are in the tender documents; no estimated contract value is stated in the public notice.
Get started with Ziva

Original notice

Read the original description

Gesamterneuerung Energieerzeugung, Heizungsanlagen, Schulhaus Rüterwis, Zollikerberg

Heizungsanlagen: 4 Sole/Wasser-Wärmepumpen (total 260 kW) mit Anbindung an Erdsondenfeld und PVT-Regeneration, Gas-Spitzenlastkessel 400 kW, Speicher, Druckhaltung, Unterstationen und Fernleitungen, Luft/Wasser-Wärmepumpe Haus G, Ersatz Brauchwarmwassererwärmer, Havarielüftung, Dämmungen und Demontagen

Official source: SIMAP ↗

Notice updates

October 23, 2026 · Version 3

Contract period updated · Deadline information updated · Summary and analysis updated · Tender facts updated · Original notice updated · Deadline updated · Location updated · Source notice details updated · Source references updated · Status changed · Notice update added

Gesamterneuerung Energieerzeugung, Heizungsanlagen, Schulhaus Rüterwis, Zollikerberg

Heizungsanlagen: 4 Sole/Wasser-Wärmepumpen (total 260 kW) mit Anbindung an Erdsondenfeld und PVT-Regeneration, Gas-Spitzenlastkessel 400 kW, Speicher, Druckhaltung, Unterstationen und Fernleitungen, Luft/Wasser-Wärmepumpe Haus G, Ersatz Brauchwarmwassererwärmer, Havarielüftung, Dämmungen und Demontagen

October 20, 2026 · Version 2

Classification updated

Gesamterneuerung Energieerzeugung, Heizungsanlagen, Schulhaus Rüterwis, Zollikerberg

Heizungsanlagen: 4 Sole/Wasser-Wärmepumpen (total 260 kW) mit Anbindung an Erdsondenfeld und PVT-Regeneration, Gas-Spitzenlastkessel 400 kW, Speicher, Druckhaltung, Unterstationen und Fernleitungen, Luft/Wasser-Wärmepumpe Haus G, Ersatz Brauchwarmwassererwärmer, Havarielüftung, Dämmungen und Demontagen

October 11, 2026 · Version 1

Published

Gesamterneuerung Energieerzeugung, Heizungsanlagen, Schulhaus Rüterwis, Zollikerberg

Heizungsanlagen: 4 Sole/Wasser-Wärmepumpen (total 260 kW) mit Anbindung an Erdsondenfeld und PVT-Regeneration, Gas-Spitzenlastkessel 400 kW, Speicher, Druckhaltung, Unterstationen und Fernleitungen, Luft/Wasser-Wärmepumpe Haus G, Ersatz Brauchwarmwassererwärmer, Havarielüftung, Dämmungen und Demontagen