Office re-layout works: RFQ, partitions, finishes and electrical work

14 October 2026, 05:00 UTC (canonical snapshot)
05:00 AM · UTC
Contract value
₱755,283.19
Contract period
30 days upon receipt of the Notice to Proceed.
Published
October 8, 2026

PhilGEPS

Overview

TIEZA requests quotations for the supply, delivery, installation and demolition needed to re-layout its Construction Management Department office in Metro Manila. The stated ABC is PHP 755,283.19. The RFQ covers glass and drywall partitions, ceiling and floor finishes, and electrical work. Submit a signed quotation in a sealed envelope by 14 October 2026 at 13:00 Philippine Standard Time, with the listed permit, tax, PhilGEPS and notarized authority documents. Prices must be in Philippine pesos, include applicable taxes and charges, and stay within the ABC. Quotations are valid for 30 days; delivery is due within 30 days after the Notice to Proceed.

Information based on the public notice

What the buyer needs

This is a small-value procurement RFQ for office re-layout works, with an integrated quotation schedule describing the requested materials and work. The notice states the ABC, delivery location and period, submission method and deadline, documentation requirements, quotation conditions and compliance-based award rule.

  • Submit a signed quotation by the stated deadline in a sealed envelope, in person to TIEZA Procurement Management Division at the stated office address.
  • Provide a valid current Mayor’s Permit, or proof of application if expired.
  • Provide an Income/Business Tax Return for projects with ABC above PHP 500,000.
  • Provide a PhilGEPS Registration Number.
  • Provide a notarized Omnibus Sworn Statement and, where applicable, Secretary’s Certificate, Board/Partnership Resolution, or Special Power of Attorney authorizing the representative.
  • Keep the quotation valid for 30 calendar days from submission; quote in Philippine pesos inclusive of taxes, duties and levies and do not exceed the ABC. Alterations must be signed or initialed by the bidder or authorized representative.

Tender details

Buyer
TOURISM INFRASTRUCTURE AND ENTERPRISE ZONE AUTHORITY
Country
Philippines
Procedure
Not stated in the notice
Classification
Not stated in the notice
Notice reference
13280507
Contract budget
PHP 755,283.19 ABC; not an award value.
Submission deadline
14 October 2026, 13:00 Philippine Standard Time (UTC+08:00), equivalent to 05:00 UTC.
Delivery location
Metro Manila; TIEZA Main Office, Double Dragon Tower 1, 7th Floor, Pasay City.
Required documents
Signed quotation; current Mayor’s Permit or proof of application if expired; tax return where ABC exceeds PHP 500,000; PhilGEPS Registration Number; notarized Omnibus Sworn Statement and applicable authorization.
Award basis
Lowest compliant quotation for goods/infrastructure; highest-rated compliant offer for consulting services.

What to check in the tender documents

  • No quotation submissions, evaluation outcome, winning supplier or award value is stated in this notice.
Get started with Ziva

Original notice

Read the original description

SUPPLY, DELIVERY, INSTALLATION AND DEMOLITION FOR THE RE-LAYOUT OF CONSTRUCTION MANAGEMENT DEPARTMENT OFFICE AS PER PR NO. 26-03-0117

Help printableBidNoticeAbstract Bid Notice Abstract Request for Quotation (RFQ) Reference Number 13280507 Procuring Entity TOURISM INFRASTRUCTURE AND ENTERPRISE ZONE AUTHORITY Title SUPPLY, DELIVERY, INSTALLATION AND DEMOLITION FOR THE RE-LAYOUT OF CONSTRUCTION MANAGEMENT DEPARTMENT OFFICE AS PER PR NO. 26-03-0117 Area of Delivery Metro Manila Solicitation Number: TIEZA-152-2026 Trade Agreement: Implementing Rules and Regulations Procurement Mode: Negotiated Procurement - Small Value Procurement (Sec. 34) Classification: Goods Category: Fixtures Approved Budget for the Contract: PHP 755,283.19 Delivery Period: 30 Day/s Client Agency: Contact Person: [personal contact name redacted] BAC Secretariat 7th Floor, Tower 1, Double Dragon Plaza, Double Dragon Meridian Park, Macapagal Ave. cor. EDSA Extension, Bay Area, Pasay City. Pasay City Metro Manila Philippines [telephone redacted] [telephone redacted] [email redacted] Status Closed Associated Components 3 Bid Supplements 0 Document Request List 2 Date Published 09/10/2026 Last Updated / Time 09/10/2026 00:00 AM Closing Date / Time 14/10/2026 13:00 PM Description REQUEST FOR QUOTATION SMALL VALUE PROCUREMENT Name of Company : Address : Contact No. / Email : Project Title : SUPPLY, DELIVERY, INSTALLATION AND DEMOLITION FOR THE RE-LAYOUT OF CONSTRUCTION MANAGEMENT DEPARTMENT OFFICE AS PER PR NO. 26-03-0117 Approved Budget for the Contract : PHP 755,283.19 End-User : CONSTRUCTION MANAGEMENT DEPARTMENT Please quote your best offer for the item/s described below, subject to the Terms and Conditions provided. Submit your quotation duly signed by you or your duly authorized representative not later than 14 October 2026, 1:00pm Philippine Standard Time, together with the following documents of your company in a SEALED ENVELOPE and shall be submitted face-to-face to the Procurement Management Division, Tourism Infrastructure and Enterprise Zone Authority (TIEZA) 7th Floor, Tower 1, Double Dragon Meridian Tower, Diosdado Macapagal Ave. cor. EDSA Extension, Pasay City. 1. Valid and current Mayor’s Permit (proof of application in case expired); 2. Income/Business Tax Return(required for projects with ABC above Php500, 000.00), 3. PhilGEPS Registration Number; 4. Omnibus Sworn Statement (see attached format) duly notarized with attached Secretary’s Certificate, Board/Partnership Resolution, or Special Power of Attorney, whichever is applicable authorizing the representative (If a partnership, corporation, cooperative, or joint venture) Terms and Conditions 1. Bidders shall provide correct and accurate information required in this form. 2. Price quotation/s must be valid for a period of thirty (30) calendar days from the date of submission. 3. Price quotation/s, to be denominated in the Philippine Peso shall include all taxes, duties and/or levies payable. 4. Quotation exceeding the Approved Budget for the Contract (ABC) shall be rejected. 5. Any interlineations, erasures or overwriting shall be valid only if signed or initialed by the bidder or his/her duly authorized representative/s. 6. Award of contract shall be made to the lowest quotation (for goods and infrastructure projects) or the highest rated offer (for consulting services) which complies with the minimum technical specifications and other terms and conditions stated herein. 7. Failure to follow these instructions will disqualify your entire quotation. [signatory name redacted] Chairperson Bids and Awards Committee After having carefully read and accepted the Terms and Conditions, I/We submit our quotation/s as follows: ITEM NO. ITEM & DESCRIPTION UNIT OF ISSUE QTY. UNIT PRICE ITEM TOTAL 19. A. Installation of glass wall partition (conference room) 12mm thk. Tempered glass wall partition with complete accessories and frosted glass sticker W 0.80m x H 2.10 x 12mm thk. Tempered glass swing door with complete accessories B. Installation of fiber glass ceiling 0.60m x0.60m Fiber glass ceiling on T-runners with complete accessories c. Demolition and installation of drywall partition Double-sided Drywall partition on metal studs in white semi-gloss paint finish Temporary Enclosure 8ft Blue Sack (Sakoline) 2"x2"x8ft Coco Lumber 2"x2"x 10ft Coco Lumber D. Installation of Floor Tiles 0.40m x 0.40m Vinyl Floor Tiles (same as existing) 50cm x 50cm Carpet tiles (same as existing) Contact Cement E. Electrical Works 36W LED Panel Light Ceiling mounted 300mm x 1210mm (cool white) or "approved equal" 3.5mm² THHN wire, 150m/roll 20mm⌀ PVC pipe with coupling, 3m/ pc 20mm⌀ PVC locknut and bushing 4"x 4" octagon junction box with box with cover, steel 2"x 4" utility box, steel Electrical tape Duplex convenience outlet Solvent, 400 cc m² TOTAL QUOTED AMOUNT: Amount in Words: Delivery Period: 30 Days Upon Receipt of Notice to Proceed TIEZA MAIN OFFICE, DOUBLE DRAGON TOWER 1 7TH FLOOR– PASAY CITY Delivery Location: Warranty: Signature over Printed Name Designation Date Created by [personal contact name redacted] Date Created 08/10/2026 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party. ©&nbsp2004-2026  DBM Procurement Service. All rights reserved. Help | Contact Us | Sitemap

Official source: PhilGEPS ↗

Notice updates

October 16, 2026 · Version 3

Contract period updated · Summary and analysis updated · Tender facts updated · Original notice updated · Deadline updated · Location updated · Source references updated

SUPPLY, DELIVERY, INSTALLATION AND DEMOLITION FOR THE RE-LAYOUT OF CONSTRUCTION MANAGEMENT DEPARTMENT OFFICE AS PER PR NO. 26-03-0117

Help printableBidNoticeAbstract Bid Notice Abstract Request for Quotation (RFQ) Reference Number 13280507 Procuring Entity TOURISM INFRASTRUCTURE AND ENTERPRISE ZONE AUTHORITY Title SUPPLY, DELIVERY, INSTALLATION AND DEMOLITION FOR THE RE-LAYOUT OF CONSTRUCTION MANAGEMENT DEPARTMENT OFFICE AS PER PR NO. 26-03-0117 Area of Delivery Metro Manila Solicitation Number: TIEZA-152-2026 Trade Agreement: Implementing Rules and Regulations Procurement Mode: Negotiated Procurement - Small Value Procurement (Sec. 34) Classification: Goods Category: Fixtures Approved Budget for the Contract: PHP 755,283.19 Delivery Period: 30 Day/s Client Agency: Contact Person: [personal contact name redacted] BAC Secretariat 7th Floor, Tower 1, Double Dragon Plaza, Double Dragon Meridian Park, Macapagal Ave. cor. EDSA Extension, Bay Area, Pasay City. Pasay City Metro Manila Philippines [telephone redacted] [telephone redacted] [email redacted] Status Closed Associated Components 3 Bid Supplements 0 Document Request List 2 Date Published 09/10/2026 Last Updated / Time 09/10/2026 00:00 AM Closing Date / Time 14/10/2026 13:00 PM Description REQUEST FOR QUOTATION SMALL VALUE PROCUREMENT Name of Company : Address : Contact No. / Email : Project Title : SUPPLY, DELIVERY, INSTALLATION AND DEMOLITION FOR THE RE-LAYOUT OF CONSTRUCTION MANAGEMENT DEPARTMENT OFFICE AS PER PR NO. 26-03-0117 Approved Budget for the Contract : PHP 755,283.19 End-User : CONSTRUCTION MANAGEMENT DEPARTMENT Please quote your best offer for the item/s described below, subject to the Terms and Conditions provided. Submit your quotation duly signed by you or your duly authorized representative not later than 14 October 2026, 1:00pm Philippine Standard Time, together with the following documents of your company in a SEALED ENVELOPE and shall be submitted face-to-face to the Procurement Management Division, Tourism Infrastructure and Enterprise Zone Authority (TIEZA) 7th Floor, Tower 1, Double Dragon Meridian Tower, Diosdado Macapagal Ave. cor. EDSA Extension, Pasay City. 1. Valid and current Mayor’s Permit (proof of application in case expired); 2. Income/Business Tax Return(required for projects with ABC above Php500, 000.00), 3. PhilGEPS Registration Number; 4. Omnibus Sworn Statement (see attached format) duly notarized with attached Secretary’s Certificate, Board/Partnership Resolution, or Special Power of Attorney, whichever is applicable authorizing the representative (If a partnership, corporation, cooperative, or joint venture) Terms and Conditions 1. Bidders shall provide correct and accurate information required in this form. 2. Price quotation/s must be valid for a period of thirty (30) calendar days from the date of submission. 3. Price quotation/s, to be denominated in the Philippine Peso shall include all taxes, duties and/or levies payable. 4. Quotation exceeding the Approved Budget for the Contract (ABC) shall be rejected. 5. Any interlineations, erasures or overwriting shall be valid only if signed or initialed by the bidder or his/her duly authorized representative/s. 6. Award of contract shall be made to the lowest quotation (for goods and infrastructure projects) or the highest rated offer (for consulting services) which complies with the minimum technical specifications and other terms and conditions stated herein. 7. Failure to follow these instructions will disqualify your entire quotation. [signatory name redacted] Chairperson Bids and Awards Committee After having carefully read and accepted the Terms and Conditions, I/We submit our quotation/s as follows: ITEM NO. ITEM & DESCRIPTION UNIT OF ISSUE QTY. UNIT PRICE ITEM TOTAL 19. A. Installation of glass wall partition (conference room) 12mm thk. Tempered glass wall partition with complete accessories and frosted glass sticker W 0.80m x H 2.10 x 12mm thk. Tempered glass swing door with complete accessories B. Installation of fiber glass ceiling 0.60m x0.60m Fiber glass ceiling on T-runners with complete accessories c. Demolition and installation of drywall partition Double-sided Drywall partition on metal studs in white semi-gloss paint finish Temporary Enclosure 8ft Blue Sack (Sakoline) 2"x2"x8ft Coco Lumber 2"x2"x 10ft Coco Lumber D. Installation of Floor Tiles 0.40m x 0.40m Vinyl Floor Tiles (same as existing) 50cm x 50cm Carpet tiles (same as existing) Contact Cement E. Electrical Works 36W LED Panel Light Ceiling mounted 300mm x 1210mm (cool white) or "approved equal" 3.5mm² THHN wire, 150m/roll 20mm⌀ PVC pipe with coupling, 3m/ pc 20mm⌀ PVC locknut and bushing 4"x 4" octagon junction box with box with cover, steel 2"x 4" utility box, steel Electrical tape Duplex convenience outlet Solvent, 400 cc m² TOTAL QUOTED AMOUNT: Amount in Words: Delivery Period: 30 Days Upon Receipt of Notice to Proceed TIEZA MAIN OFFICE, DOUBLE DRAGON TOWER 1 7TH FLOOR– PASAY CITY Delivery Location: Warranty: Signature over Printed Name Designation Date Created by [personal contact name redacted] Date Created 08/10/2026 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party. ©&nbsp2004-2026  DBM Procurement Service. All rights reserved. Help | Contact Us | Sitemap

October 16, 2026 · Version 2

Deadline information updated · Summary and analysis updated · Tender facts updated · Original notice updated · Deadline updated · Source notice details updated · Source references updated · Status changed · Notice update added

SUPPLY, DELIVERY, INSTALLATION AND DEMOLITION FOR THE RE-LAYOUT OF CONSTRUCTION MANAGEMENT DEPARTMENT OFFICE AS PER PR NO. 26-03-0117

SUPPLY, DELIVERY, INSTALLATION AND DEMOLITION FOR THE RE-LAYOUT OF CONSTRUCTION MANAGEMENT DEPARTMENT OFFICE AS PER PR NO. 26-03-0117

October 12, 2026 · Version 1

Published

SUPPLY, DELIVERY, INSTALLATION AND DEMOLITION FOR THE RE-LAYOUT OF CONSTRUCTION MANAGEMENT DEPARTMENT OFFICE AS PER PR NO. 26-03-0117

REQUEST FOR QUOTATION SMALL VALUE PROCUREMENT Name of Company : Address : Contact No. / Email : Project Title : SUPPLY, DELIVERY, INSTALLATION AND DEMOLITION FOR THE RE-LAYOUT OF CONSTRUCTION MANAGEMENT DEPARTMENT OFFICE AS PER PR NO. 26-03-0117 Approved Budget for the Contract : PHP 755,283.19 End-User : CONSTRUCTION MANAGEMENT DEPARTMENT Please quote your best offer for the item/s described below, subject to the Terms and Conditions provided. Submit your quotation duly signed by you or your duly authorized representative not later than 14 October 2026, 1:00pm Philippine Standard Time, together with the following documents of your company in a SEALED ENVELOPE and shall be submitted face-to-face to the Procurement Management Division, Tourism Infrastructure and Enterprise Zone Authority (TIEZA) 7th Floor, Tower 1, Double Dragon Meridian Tower, Diosdado Macapagal Ave. cor. EDSA Extension, Pasay City. 1. Valid and current Mayor’s Permit (proof of application in case expired); 2. Income/Business Tax Return(required for projects with ABC above Php500, 000.00), 3. PhilGEPS Registration Number; 4. Omnibus Sworn Statement (see attached format) duly notarized with attached Secretary’s Certificate, Board/Partnership Resolution, or Special Power of Attorney, whichever is applicable authorizing the representative (If a partnership, corporation, cooperative, or joint venture) Terms and Conditions 1. Bidders shall provide correct and accurate information required in this form. 2. Price quotation/s must be valid for a period of thirty (30) calendar days from the date of submission. 3. Price quotation/s, to be denominated in the Philippine Peso shall include all taxes, duties and/or levies payable. 4. Quotation exceeding the Approved Budget for the Contract (ABC) shall be rejected. 5. Any interlineations, erasures or overwriting shall be valid only if signed or initialed by the bidder or his/her duly authorized representative/s. 6. Award of contract shall be made to the lowest quotation (for goods and infrastructure projects) or the highest rated offer (for consulting services) which complies with the minimum technical specifications and other terms and conditions stated herein. 7. Failure to follow these instructions will disqualify your entire quotation. ATTY. BUMBO S. CRUZ Chairperson Bids and Awards Committee After having carefully read and accepted the Terms and Conditions, I/We submit our quotation/s as follows: ITEM NO. ITEM & DESCRIPTION UNIT OF ISSUE QTY. UNIT PRICE ITEM TOTAL 19. A. Installation of glass wall partition (conference room) 12mm thk. Tempered glass wall partition with complete accessories and frosted glass sticker W 0.80m x H 2.10 x 12mm thk. Tempered glass swing door with complete accessories B. Installation of fiber glass ceiling 0.60m x0.60m Fiber glass ceiling on T-runners with complete accessories c. Demolition and installation of drywall partition Double-sided Drywall partition on metal studs in white semi-gloss paint finish Temporary Enclosure 8ft Blue Sack (Sakoline) 2"x2"x8ft Coco Lumber 2"x2"x 10ft Coco Lumber D. Installation of Floor Tiles 0.40m x 0.40m Vinyl Floor Tiles (same as existing) 50cm x 50cm Carpet tiles (same as existing) Contact Cement E. Electrical Works 36W LED Panel Light Ceiling mounted 300mm x 1210mm (cool white) or "approved equal" 3.5mm² THHN wire, 150m/roll 20mm⌀ PVC pipe with coupling, 3m/ pc 20mm⌀ PVC locknut and bushing 4"x 4" octagon junction box with box with cover, steel 2"x 4" utility box, steel Electrical tape Duplex convenience outlet Solvent, 400 cc m² TOTAL QUOTED AMOUNT: Amount in Words: Delivery Period: 30 Days Upon Receipt of Notice to Proceed TIEZA MAIN OFFICE, DOUBLE DRAGON TOWER 1 7TH FLOOR– PASAY CITY Delivery Location: Warranty: Signature over Printed Name Designation Date