Seetal WWTP: general planner services for SIA phases 32 to 53

Place
Wildegg, canton of Aargau
Offer deadline
03:00 PM · UTC
Contract value
Not stated in the notice
Contract period
1 April 2027 to 31 December 2037
Published
November 23, 2026
SIMAP

Overview

Abwasserverband Region Lenzburg is seeking general planner services for expansion of the Seetal wastewater treatment plant at Langmatt. The project will replace several regional plants with a central facility. The existing plant, serving about 100,000 population equivalents, is to be expanded to 260,000 PE. A micropollutant treatment stage designed for 330,000 PE will also treat purified wastewater from the Wohlen and Chlostermatte plants. The scope covers SIA phases 32, 33, 41 and 51 to 53. The open service tender has a 15 January 2027, 16:00 CET offer deadline. The contract period is 1 April 2027 to 31 December 2037, without extension. Offers are electronic and in German. The available notice information uses English; the original SIMAP notice is in German and is reproduced below.

Information based on the public notice

What the buyer needs

General planning for expansion of the Seetal wastewater treatment plant at Langmatt. The project replaces several regional facilities with a central plant, expands the existing mechanical and biological capacity from about 100,000 to 260,000 population equivalents, and adds a micropollutant treatment stage designed for 330,000 PE. The notice names SIA phases 32, 33, 41 and 51 to 53.

  • Electronic submission through the platform identified by SIMAP.
  • German is the stated offer language.
  • Variants, partial offers and options are not permitted.
  • Consortia and subcontractors are permitted.

Tender details

Buyer
Abwasserverband Region Lenzburg (AVRL)
Country
Switzerland
Procedure
Open procedure
Classification
Wastewater treatment plant engineering and general planning · 71300000, 71320000, 90420000 and 90492000
Notice reference
47457 · 47457-01
Project
General planning for expansion of the Seetal wastewater treatment plant at Langmatt
Current and planned capacity
Existing plant about 100,000 PE, expanding to 260,000 PE
Micropollutant treatment
Stage designed for 330,000 PE, also receiving purified wastewater from Wohlen and Chlostermatte
SIA phases
32, 33, 41 and 51 to 53
Offer deadline
15 January 2027 at 16:00 CET, UTC+1
Contract period
1 April 2027 to 31 December 2037
Extension
No extension is provided
Submission
Digital through the platform identified by SIMAP
Offer language
German
Participation rules
No variants, partial offers or options; consortia and subcontractors are permitted

What to check in the tender documents

  • The available notice information carries an English rendering, while SIMAP identifies German as the original publication language. The complete original German notice text is preserved below.
  • The public record states no estimated value, offer validity period, award criteria or award result. Supporting documents were not reviewed.
Get started with Ziva

Original notice

Read the original description

Seetal WWTP, Tender for General Planner Services, SIA Phases 32–53

Generalplanermandat für den Ausbau der ARA Seetal gemäss Formular A3 Leistungsbeschrieb / Honorierung. Das Projekt ARA Seetal umfasst die Planung und Realisierung einer neuen zentralen Abwasserreinigungsanlage (ARA) am Standort Langmatt. Die Anlage ersetzt mehrere bestehende regionale Anlagen und dient künftig als zentraler Behandlungspunkt für das gesamte Einzugsgebiet. Die bestehende ARA Langmatt mit rund 100'000 EW wird mechanisch und biologisch ausgebaut auf 260'000 EW. Zusätzlich wird die EMV-Stufe, welche auf 330'000 EW ausgelegt wird, um auch das gereinigte Abwasser von der ARA Wohlen und Chlostermatte zu behandeln, realisiert. Der Generalplaner bearbeitet das Projekt Ausbau ARA inkl. EMV-Stufe für die Phasen 32, 33, 41, 51-53.

Official source: SIMAP ↗