Construction of San Julian Barangay Hall, Phase 2

PROVINCE OF EASTERN SAMARPhilippinesClosed

Outcome

Submissions closed on 21 October 2026. No award has been published yet. Open tenders like this one are listed below.

Place
Eastern Samar, Philippines
21 October 2026; published clock 10:00 a.m. local portal time, timezone not stated.
Time not stated
Contract value
₱2,742,318.55
Approved contract budget
Lots
1 lot
Classification
Construction and civil works
Published
September 29, 2026
philippines-philgeps-legacy

Overview

The Province of Eastern Samar invites bids to construct Phase 2 of the Barangay Hall in Barangay 01, San Julian. The approved budget is PHP 2,742,318.55 and the stated construction period is 124 days. Bids close 21 October 2026 at 10:00 a.m.; the public abstract does not state a timezone.

Information based on the public notice

What the buyer needs

Construction of the Phase 2 barangay hall in Barangay 01, San Julian, Eastern Samar, including the listed building and services work.

  • Public bidding for civil works; bidders must meet the stated similar-contract and eligibility requirements and submit the bid security and documents required by the notice and bidding rules.

Lots

Construction of the Phase 2 barangay hall in Barangay 01, San Julian, Eastern Samar, including the listed building and services work.

Tender details

Buyer
PROVINCE OF EASTERN SAMAR
Country
Philippines
Procedure
Not stated in the notice
Classification
Construction and civil works
Notice reference
13263140
Procurement facts
Approved budget: PHP 2,742,318.55. · Construction period: 124 days. · Submission closes 21 October 2026 at 10:00 a.m.; timezone unstated.

What to check in the tender documents

  • The public notice lists the work but detailed plans, quantities and technical specifications are in supporting bidding documents.
Get started with Ziva

Original notice

Read the original description

ITB NO. 2026-09-161 CONSTRUCTION OF BARANGAY HALL PHASE 2, Brgy. 01, San Julian, Eastern Samar

Bid Notice Abstract       Invitation to Bid (ITB)   Reference Number 13263140   Procuring Entity PROVINCE OF EASTERN SAMAR   Title ITB NO. 2026-09-161 CONSTRUCTION OF BARANGAY HALL PHASE 2, Brgy. 01, San Julian, Eastern Samar   Area of Delivery   Printable Version Solicitation Number: ITB NO. 2026-09-161 CONSTRUCTION OF BARANGAY HALL Trade Agreement: Implementing Rules and Regulations Procurement Mode: Public Bidding Classification: Civil Works Category: Construction Projects Approved Budget for the Contract: PHP 2,742,318.55 Contract Duration: 124 Day/s Client Agency: Status Active Associated Components Order Bid Supplements 0 Document Request List 0 Date Published 30/09/2026 Last Updated / Time 30/09/2026 12:00 AM Closing Date / Time 21/10/2026 10:00 AM Description Republic of the Philippines PROVINCIAL GOVERNMENT OF EASTERN SAMAR Capitol Building, Borongan, Eastern Samar, 6800 Tel No. (055)-560-8312 E-mail Address: esamar.bac@gmail.com BIDS AND AWARDS COMMITTEE (BAC) INVITATION TO BID FOR CONSTRUCTION OF BARANGAY HALL PHASE 2 Brgy. 1, San Julian, Eastern Samar 1. The Provincial Government of Eastern Samar, through the 20% EDF CY 2026-#101 intends to apply the sum of Two Million Seven Hundred Forty-Two Thousand Three Hundred Eighteen Pesos 55/100 Only (PhP2,742,318.55) being the Approved Budget for the Contract (ABC) to payments under the contract ITB NO. 2026-09-161 CONSTRUCTION OF BARANGAY HALL PHASE 2, Brgy. 01, San Julian, Eastern Samar. Bids received in excess of the ABC shall be automatically rejected at bid opening. 2. The Provincial Government of Eastern Samar now invites bids, Item No. B.5 – Project Billboard/Sign Board (1.00 Each), Item No. B.7(1)-Occupational Safety and Health Program (3.03 month), Item No. B.9 – Mobilization/Demobilization (1.00 l.s.), Item No.803(1)a – Structure Excavation (common soil) (16.19 m3), Item No. 804(4) – Gravel Bedding (6.24 m3), Item No. 900(1) – Structural Concrete (Tie Beam, Column & Roof Beam) (9.47 m3), Item No. 900(1)c2 – Structural Concrete (Footing & Slab on Fill) (13.65 m3), Item No. 902(1) – Reinforcing steel (3,603.92 kg), Item No. 903(2) – Formworks and Falseworks (125.89 m2), Item No. 1001(8) – Sewer Line Works (1.00 lumpsum), Item No. 1002(5) – Plumbing Fixtures (1.00 lumpsum), Item No. 1002(6) – Cold Waterline Pipes and Fittings (1.00 lumpsum), Item No. 1004(2) – Finishing Hardware (1.00 lumpsum), Item No. 1005 – Grille Window (23.94 m2), Item No. 1008 – Aluminum Glass Window (Sliding Type) (22.32 m2), Item No. 1010(1) – Frames (Yakal Jamb) (4.00 set), Item No. 1010(2)b – Wooden Panel Door (8.40 m2), Item No. 1016(1)b – Liquid Waterproofing (103.04 m2), Item No. 1018(5) – Glazed Tiles (21.12 m2), Item No. 1027(1) – Cement Plaster Finish (515.10 m2), Item No. 1023(1)a – Painting Works (Masonry Painting) (515.10 m2), Item No. 1043(1) – PVC Doors and Frames (3.15 m2), Item No. 1046(2)a1 – 100mm CHB Non-Load Bearing (including reinforcing steel) (7.32 m2), Item No. 1046(2)a2 – 150mm CHB Non-Load Bearing (including reinforcing steel) (88.86 m2), Item No. 1051(6) – Railing (1.00 lumpsum), Item No. 1100 – Conduits, Boxes and Fittings (1.00 lumpsum), Item No. 1101 – Wire and Devices (1.00 lumpsum), Item No. 1102 – Power load Center, switchgear and panel boards (1.00 lupsum), Completion of the Works is required within 124 calendar days. Bidders should have completed contract similar to the Project. The description of an eligible bidder is contained in the Bidding Documents, particularly, in Section II Instruction to Bidders. 3. Bidding will be conducted through open competitive bidding procedures using non-discretionary pass/fail criterion as specified in the Implementing Rules and Regulations (IRR) of Republic Act 9184 (RA 9184), otherwise known as the “Government Procurement Reform Act”. Bidding is restricted to Filipino citizens/sole proprietorships, partnerships, or organizations with at least seventy five percent (75%) interest or outstanding capital stock belonging to citizens of the Philippines. 4. Interested bidders may obtain further information from the Provincial Government of Eastern Samar and inspect the Bidding Documents at the address given below from 8:00 am – 5:00pm, Monday to Friday. 5. A complete set of Bidding Documents may be purchased by interested Bidders from the address below and upon payment of a nonrefundable fee for the Bidding Documents in the amount of Three Thousand Pesos Only (PhP3,000.00). It may also be downloaded free of charge from the website of the Philippine Government Electronic Procurement System (PhilGEPS), provided that bidders shall pay the fee for the Bidding Documents not later that the submission of their bids. 6. The Provincial Government of Eastern Samar will hold a Pre-Bid Conference on October 08, 2026, 10:00 A.M., at the Bids and Awards Committee Office, Capitol Building, Borongan City, which shall be open only to all interested parties who have purchased the Bidding Documents. 7. Bids must be delivered to the address below on or before October 21, 2026, 10:00 A.M., at the Bids and Awards Committee Office, Capitol Building, Borongan City. All bids must be accompanied by a bid security in any of the acceptable forms and in the amount stated in ITB Clause 18. Bids will be opened in the presence of the bidders’ representatives who choose to attend at the address below. Late bids shall not be accepted. 8. The procurement process will be conducted in accordance with the schedules provided in RA 9184 and its RIRR for advertisements, receipt of letters of intent, and issuance of bid documents. 9. The Provincial Government of Eastern Samar reserves the right to accept or reject any bid, to annul the bidding process, and to reject all bids at any time prior to contract award, without thereby incurring any liability to the affected bidder or bidders. 10. For further information, please refer to: NELSON F. CORTEZ Chairman, Bids and Awards Committee Bids and Awards Committee Office Capitol Building, Borongan City Mobile No.09177583330 E-mail Address: easternsamar.gov.ph esamar.bac@gmail.com Atty. CYRIL JESUS D. ALZATE Head, BAC Secretaria Line Items Item No. Product/Service Name Description Quantity UOM Budget (PHP) 1 Civil Works ITB NO. 2026-09-161 CONSTRUCTION OF BARANGAY HALL PHASE 2, Brgy. 01, San Julian, Eastern Samar 1 Lump Sum 2,742,318.55 Pre-bid Conference Date Time Venue 08/10/2026 10:00 AM Bids and Awards Committee Office Capitol Building, Borongan City Created by NELSON FUNDAVILLA CORTEZ Date Created 29/09/2026 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party.

Official source: philippines-philgeps-legacy ↗