Work is scheduled to start in calendar week 51 and be completed in calendar week 53 of 2026.
Published
October 7, 2026
service.bund.de linked public notice
Overview
The City of Ochtrup invites bids to install a photovoltaic system on the roof of its fire station. The public notice specifies 212 solar modules of about 470 Wp, two inverters with a maximum of 50 kWp, and two 20 kWh battery-storage units. Work is scheduled to start in calendar week 51 and finish in week 53 of 2026. German-language bids are due 29 October 2026 at 10:00 local time; the notice does not state the time zone.
Construction and installation of a rooftop photovoltaic system at the Ochtrup fire station, comprising 212 modules, two inverters and two battery-storage units.
Offers may be submitted electronically or in writing. Electronic submission in text form or with an advanced or qualified signature/seal is permitted. Offers must be in German.
Lots
Photovoltaic system for the fire station roof
Tender details
Buyer
Stadtverwaltung Ochtrup
Country
Germany
Procedure
public procurement notice
Classification
Rooftop solar photovoltaic installation
Notice reference
subreport15/2026/10/E13552471
Submission deadline
29 October 2026 at 10:00 local time; the notice does not specify a time zone.
What to check in the tender documents
The notice states no estimated contract value and refers award criteria to the procurement documents, which were not opened.