Hydrogen supply and refuelling infrastructure for hydrogen trains

Provincie GroningenNetherlandsCancelled

Outcome

The buyer cancelled this procedure. Open tenders like this one are listed below.

Place
Groningen, Netherlands
10 March 2023, 10:00 local time; timezone not stated; historical submission cutoff
Time not stated
Contract value
Not stated in the notice
Classification
Leveringen
Published
February 3, 2023
TenderNed

Overview

The Province of Groningen’s competition concerned supplying hydrogen and hydrogen refuelling infrastructure at De Vork rail yard for four hydrogen trains being acquired by Arriva. The official result notice confirms that no contract was awarded. It states that no tenders or requests to participate were received, or that all were rejected, without identifying which alternative occurred. The original notice set 10 March 2023 at 10:00 local time as the submission cutoff; the time zone is not stated. No estimated value is published.

Information based on the public notice

What the buyer needs

Supply hydrogen and provide hydrogen refuelling infrastructure at De Vork in Groningen for four Arriva hydrogen trains. The notice says no lots were used. The original notice described a competitive dialogue and a possible supply-term extension connected to the train concession.

  • The original notice required submission of tenders or participation requests to the address in the notice; tender documents were offered through the buyer profile.

Tender details

Buyer
Provincie Groningen
Country
Netherlands
Procedure
Competitive dialogue
Classification
CPV 24111600-1 · CPV 45223720-9 · NUTS NL
Notice reference
287413
Final outcome
Cancelled; no contract awarded
Submission cutoff
10 March 2023, 10:00 local time; timezone unstated
Estimated value
Not stated
Originally envisaged contract period
1 November 2023 to 8 December 2035; this was only the announced plan and no contract was awarded

What to check in the tender documents

  • The public notices do not identify whether no submissions were received or all were rejected, do not state the time zone for the local 10:00 cutoff, and provide no estimated contract value. Full evaluation criteria were in procurement documents, which were not opened.
Get started with Ziva

Original notice

Read the original description

Levering waterstof en tankinfrastructuur op opstelterrein De Vork t.b.v. waterstoftreinen

03/02/2023 AANKONDIGING VAN EEN OPDRACHT Leveringen Richtlijn 2014/24/EU AFDELING I: AANBESTEDENDE DIENST I.1) NAAM EN ADRESSEN Officiële benaming: Provincie Groningen Plaats: Groningen NUTS-code: NL Postcode: 9712 JN Land: NL I.3) COMMUNICATIE De aanbestedingsstukken zijn rechtstreeks, volledig, onbeperkt en gratis beschikbaar op: https://platform.negometrix.com/PublishedTenders.aspx?tenderid=215701 Inschrijvingen of aanvragen tot deelneming moeten worden ingediend op het hierboven vermelde adres. AFDELING II: VOORWERP II.1.1) Benaming Levering waterstof en tankinfrastructuur op opstelterrein De Vork t.b.v. waterstoftreinen Referentienummer: - II.1.2) CPV-code(s) Hoofdcategorie: 24111600 - Waterstof II.1.3) Type opdracht Leveringen II.1.4) Korte beschrijving Het onderwerp betreft de levering van waterstof en waterstof-tankinfrastructuur op opstelterrein De Vork te Groningen ten behoeve van de 4 waterstoftreinen die momenteel door Arriva aangeschaft worden. II.1.5) Geraamde totale waarde Waarde zonder btw: - Munt: - II.1.6) Inlichtingen over percelen Verdeling in percelen: neen II.2.2) Aanvullende CPV-code(s) Hoofdcategorie: 45223720 - Bouwen van tankstation II.2.3) Plaats van uitvoering NUTS-code: NL NEDERLAND Voornaamste plaats van uitvoering: Groningen II.2.4) Beschrijving van de aanbesteding Het onderwerp betreft de levering van waterstof en waterstof-tankinfrastructuur op opstelterrein De Vork te Groningen ten behoeve van de 4 waterstoftreinen die momenteel door Arriva aangeschaft worden. II.2.5) Gunningscriteria De prijs is niet het enige gunningscriterium en alle criteria worden enkel vermeld in de aanbestedingsdocumenten. II.2.7) Looptijd van de opdracht, de raamovereenkomst of het dynamische aankoopsysteem Aanvang: 01/11/2023 Einde: 08/12/2035 Deze opdracht kan worden verlengd: ja Beschrijving van verlengingen: Mogelijke verlenging van de levering van de opdracht voor de treinconcessie in 2035. De concrete uitwerking van de verlengingsoptie vindt plaats in de dialoog- en inschrijvingsfase. II.2.10) Inlichtingen over varianten Varianten worden geaccepteerd: neen II.2.11) Inlichtingen over opties Opties: neen II.2.13) Inlichtingen over middelen van de Europese Unie De aanbesteding houdt verband met een project en/of een programma dat met middelen van de EU wordt gefinancierd: ja Benaming van het project: CINEA AFDELING IV: PROCEDURE IV.1.1) Type procedure Concurrentiegerichte dialoog IV.2.4) Talen die mogen worden gebruikt bij het indienen van inschrijvingen of aanvragen tot deelneming: NL AFDELING V: GUNNING VAN EEN OPDRACHT Opdracht nr.: - Perceel nr.: - Een opdracht/perceel wordt gegund: neen V.1) INLICHTINGEN OVER NIET-GUNNING De opdracht/het perceel wordt niet gegund. Er zijn geen inschrijvingen of deelnemingsaanvragen ontvangen, of deze zijn allemaal afgewezen. Datum: 10/03/2023 Plaatselijke tijd: 10:00 14/12/2023 AANKONDIGING VAN EEN GEGUNDE OPDRACHT - RESULTATEN VAN DE AANBESTEDINGSPROCEDURE II.1.7) Totale waarde van de aanbesteding (exclusief btw): - IV.2.1) Eerdere bekendmaking betreffende deze procedure: 2023/S 026-076562 V.1) INLICHTINGEN OVER NIET-GUNNING De opdracht/het perceel wordt niet gegund. Er zijn geen inschrijvingen of deelnemingsaanvragen ontvangen, of deze zijn allemaal afgewezen. Datum: 10/03/2023 Plaatselijke tijd: 10:00

Official source: TenderNed ↗

Official notice PDF ↗

Official notice PDF ↗