Building 1025 HVAC work at Kirtland AFB

Outcome

Awarded to COLT BUILDERS INC on 29 September 2026. Open tenders like this one are listed below.

Place
Kirtland AFB, New Mexico, United States
Award notice; no bid deadline
Not available
Contract value
Not stated in the notice
Award details
COLT BUILDERS INC
September 29, 2026
Classification
Building HVAC works
Published
September 29, 2026
SAM.gov

Overview

The Army Corps of Engineers records an award to COLT BUILDERS INC for Building 1025 HVAC work at Kirtland AFB. The public notice states this was an 8(a) sole-source set-aside. The scope includes a detachable duct hood and exhaust ductwork, a 1,500 CFM exhaust fan, and a 3-ton mini-split unit. The explicit award amount is 207,214.00, currency unstated; award date is 29 September 2026. The place of performance is Kirtland AFB, New Mexico.

Information based on the public notice

What the buyer needs

Awarded HVAC construction at Building 1025, including compressor exhaust modifications, ventilation and a mini-split air-conditioning unit.

Award details

Supplier
COLT BUILDERS INC
Award date
September 29, 2026

Tender details

Buyer
U.S. Army Corps of Engineers, Albuquerque District
Country
United States
Procedure
Award Notice
Classification
Building HVAC works · NAICS 238220 · PSC Y1NZ
Notice reference
40af08092fb74ec19f2255df1ca9efb6 · W912PP26QA045
Awardee
COLT BUILDERS INC
Award line item
0001
Set-aside and method
8(a) sole-source set-aside
Exhaust fan rating
1,500 CFM at 1 in. W.C.
Mini-split cooling capacity
3 tons (36,000 BTU/hr)
Award amount (currency not stated)
207,214.00
Award date
2026-09-29
Award number
W912PP26PA040
NAICS classification
NAICS 238220
PSC classification
PSC Y1NZ

What to check in the tender documents

  • The API does not state currency or a separate estimated contract value. Detailed dimensions and installation conditions are preserved in the original public notice text.
Get started with Ziva

Original notice

Read the original description

Bldg. 1025 HVAC at Kirtland AFB

This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act. The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 1025 HVAC. Construction Contractor to provide and install an 8.5”x20.5” duct hood over the air compressor heat exhausts that transition to 14” ø round duct. Duct hood must be detachable to allow for the removal of the compressor top plate for maintenance. Contractor to remove SF-1 and wall louver. Expand existing 12”x18” wall penetration to 18”x18” penetration on the South wall. Install wall mounted exhaust fan rated for 1500 CFM @ 1” W.C. with using single phase 208V with soft start motor. Fan and motor must be rated to handle 140°F exhaust air. Provide 18”x18” ducted exhaust plenum 2’ into the mechanical room. Route 14”ø duct from each compressor into the 18”x18” plenum. Utilize conical fittings for branch take-offs and 30° minimum rectangular to round transitions and 1.5D round elbows. Provide gasketed low leakage motorized control dampers on each 14”ø duct between the hood and the exhaust plenum. Contractor to provide a 3-ton (36,000 BTU/hr) wall mounted mini split air conditioning unit on west wall above the compressed air desiccant driers. Mount wall mounted unit on available space without moving existing compressed air piping or conduit. Secure unit to wall per manufacturer instructions. Route condensate to nearest floor sink. Terminate condensate pipe above floor sink rim. Size per manufacturer requirements. Contractor to provide mini split condensing unit with high ambient kit by the same manufacturer. Locate exterior unit between stairs to electrical room and mechanical room. Secure unit to the ground per manufacturer instructions or mounted on C-channel with concrete anchors. Mini split must be 208V single phase. Contractor to provide and install refrigerant line sets between mini split per manufacturer instructions. Flash and seal new penetration for line set. Provide controls for equipment as follows: Exhaust fan must start when either compressor activates. Fan must remain on for at least 5 minutes (adjustable up to at least 15 minutes) after compressor turns off. Motorized control dampers must open when associated air compressor is activated. Damper must stay open until the exhaust fan turns off. Provide duct access panel for each damper on the bottom of the duct. Provide thermostat for new mini split. Set temperature to 85°F (adjustable). All new duct and duct connections shall be sealed to Class A and hung from the structure or mechanical room walls (where allowed) per SMACNA HVAC Duct Construction Standards. Provide 1in. W.C. Duct Pressure Classification on all exhaust duct systems, provide a minimum 22 Ga. Galvanized sheet metal meeting ASTM A924/A924M and ASTM A653/653M for all exhaust duct as indicated on the supplemental drawings. Provide power to the new exhaust fan and motorized control dampers from Panel P1. Reuse of conduit from demolished supply fan is acceptable provided it meets all NEC requirements. Provide power to mini split air conditioner from panel LM1. All wiring must be provided per NEC. Provide disconnects to exhaust fan, condensing unit and indoor unit per UFC 3-410-01. Contractor will need to be escorted at all times with the construction schedule coordinated with the facility user.  All new penetrations between the electrical and mechanical rooms must be sealed with fire caulk. The North and East walls in the Mechanical Room cannot have any new penetration or be utilized to mount hang or hang any new equipment.

Official source: SAM.gov ↗